  #241  
Old Posted Oct 3, 2013, 2:39 AM
Doug's Avatar
Doug Doug is offline
Registered User
 
Join Date: Jul 2001
Posts: 10,046
The first tower has Cenovus Energy signed up for 1m sq ft.

Calgary has one of the most volatile office markets on the continent so who knows what will happen to the vacancy rate. The current building boom is shaping up to be the second biggest on record, after the late 70's/early 80's. Under construction are:
-Brookfield East
-City Centre
-Eau Claire Tower

Planned to be u/c soon are:
-Bow South block
-3 Eau Claire
-Telus Sky
-Manulife

Approved and pre-leasing:
-Brookfield West
-Great West Life
-Palliser East
-Palliser West
-Century Park

If all of these are built, the downtown office space inventory would increase by around 8 or 9 million sq ft, which would be about a 20% increase.
     
     
  #242  
Old Posted Oct 3, 2013, 6:10 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Chris: The office market is very good in Calgary, as the chart by Doug shows. But even if it tappers off a bit, even for 2-3-4 years that's ok! It's nice to have a little over-supply so smaller companies & others have some alternatives and can negotiate lease rates for say class "B" or "C" space. (usually companies looking for space when their lease is up, look to class "A") The two things you don't want see is 15% vacancy rate or on the other hand, 1/2% vacancy rate either. It's nice to have options... same also applies to residential to a point.
     
     
  #243  
Old Posted Oct 4, 2013, 7:10 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,163
I'll echo what others have said. Calgary's office market is very volatile but massive and on average growing like stink. It showed negative absorption in the last two quarters but I'd say myself and most others are still quite bullish.

No doubts this one and City Centre will lease up. They are big boys though so hopefully the market gets a bit of time to absorb it before many other big projects hit the dirt.
     
     
  #244  
Old Posted Oct 5, 2013, 3:50 AM
chris's Avatar
chris chris is offline
Registered User
 
Join Date: Oct 2001
Location: Miami, FL
Posts: 1,738
I wasn't worried too much about City Centre - that thing is already under construction. This project isn't under construction yet and what, there's 2 million feet of leasable space? I find it hard to find an anchor tenant now that the market is cooling down, no??
__________________
Go Habs.
     
     
  #245  
Old Posted Oct 5, 2013, 4:16 AM
drto drto is offline
Registered User
 
Join Date: Mar 2008
Location: Kelowna via Calgary via Edmonton via Saskatoon
Posts: 335
See Doug's post above.
Cenovus has already signed up for 1 million of Tower 1's 1.4 million sq feet
     
     
  #246  
Old Posted Oct 5, 2013, 1:44 PM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
Quote:
Originally Posted by chris View Post
I wasn't worried too much about City Centre - that thing is already under construction. This project isn't under construction yet and what, there's 2 million feet of leasable space? I find it hard to find an anchor tenant now that the market is cooling down, no??
Any reports that indicate this? Everything seems to be full steam ahead right now.
     
     
  #247  
Old Posted Oct 6, 2013, 2:14 AM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,273
Quote:
Originally Posted by chris View Post
I wasn't worried too much about City Centre - that thing is already under construction. This project isn't under construction yet and what, there's 2 million feet of leasable space? I find it hard to find an anchor tenant now that the market is cooling down, no??
That market will no doubt cool down at some point, but this is going ahead from the looks of it. With an anchor tenant taking up most of the tower, it's go time.
     
     
  #248  
Old Posted Oct 7, 2013, 4:49 PM
Habanero's Avatar
Habanero Habanero is offline
Registered User
 
Join Date: Dec 2006
Location: Dynamic city near the Rockies
Posts: 2,298
Yep, getting the space leased is not an issue. This one is getting built. Phase II might be a while, but I don't care about it that much.
     
     
  #249  
Old Posted Oct 7, 2013, 5:05 PM
nickheer nickheer is offline
Doofus
 
Join Date: Feb 2012
Location: Calgary
Posts: 37
Quote:
Originally Posted by Bigtime View Post
Any reports that indicate this? Everything seems to be full steam ahead right now.
Someone I know who would know about this says that the market is as hot as ever. Virtually no vacancy downtown.
     
     
  #250  
Old Posted Oct 7, 2013, 7:26 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,163
Quote:
Originally Posted by chris View Post
I wasn't worried too much about City Centre - that thing is already under construction. This project isn't under construction yet and what, there's 2 million feet of leasable space? I find it hard to find an anchor tenant now that the market is cooling down, no??
Like many already said, this one is substantially leased up already. In fact it's in better shape than City Centre.

The current office market is in limbo, nothing is bad, just a lot of uncertainty over Keystone, Northern Gateway and the general PPB of oil.

Long term the demand is there though
     
     
  #251  
Old Posted Oct 8, 2013, 2:20 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Again, this building is now under construction. It needs to be moved to that section. Thank you.



A detailed close up of progress from this afternoon.






By Chadillaccc, on Flickr
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #252  
Old Posted Oct 8, 2013, 5:37 AM
Deepstar's Avatar
Deepstar Deepstar is offline
Registered User
 
Join Date: Mar 2007
Location: Canada
Posts: 6,291
The consensus is that this one has started and that it is indeed getting built, but buildings don't usually get moved to the construction thread until a crane or crane base is there.

Calgary's next building to get moved will be First which is just putting in a crane base, followed by Mark (sometime in the next 2-3 weeks), and then Aura II and Eau Claire tower (6-8 weeks) then comes Vogue and Brookfield Place

Quote:
Originally Posted by Chadillaccc View Post
Again, this building is now under construction. It needs to be moved to that section. Thank you.
     
     
  #253  
Old Posted Oct 8, 2013, 9:58 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,163
No it is not under construction.

I'll post this here so everyone can see the actual guidelines on considering something U/C, not just the modified rules used in the Canada section.

I've bolded, italicized and made larger the part most people seem to have trouble with.

Quote:
Originally Posted by M II A II R II K View Post
If a proposal starts construction but goes unnoticed by the moderation team, feel free to post in here to request it be moved.

Site preparation or merely just digging the foundation doesn't count as contruction starting, since digging a hole is just that, digging a hole. And plus any construction taking place within a foundation that pertains only to the excavation doesn't count either, since that's not construction for the actual building itself.

  • Foundation work includes the implementation of permanent foundation components such as the drilling of caissons, etc.
  • Top down construction involving piling doesn't require a foundation to have been dug for a building to be considered under construction.


A tall building is considered to be ‘under construction’ when site clearing has been completed and foundation / piling work has begun.
     
     
  #254  
Old Posted Oct 11, 2013, 5:56 PM
Couchie Couchie is offline
Registered User
 
Join Date: Jun 2013
Posts: 3
This ain't a construction site. This here be a hole-diggin' site!

     
     
  #255  
Old Posted Oct 16, 2013, 3:21 PM
Cowtown_Tim's Avatar
Cowtown_Tim Cowtown_Tim is offline
Registered User
 
Join Date: May 2008
Posts: 1,656
It's getting built, and yeah, basically it is u/c, but for this site, it get's moved once a crane is on site and foundation work has started.

Quote:
Originally Posted by Couchie View Post
This ain't a construction site. This here be a hole-diggin' site!
     
     
  #256  
Old Posted Oct 17, 2013, 1:46 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,891
^the general rule is once you see some concrete it can be moved.
     
     
  #257  
Old Posted Oct 17, 2013, 4:34 AM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,273
It'll be moved eventually....folks just have to be patient
     
     
  #258  
Old Posted Oct 20, 2013, 12:56 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,652
Love the sound of two caisson drills hammering away at the earth below. Music to my ears!

     
     
  #259  
Old Posted Oct 20, 2013, 5:05 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Well, I guess they're serious!! LOL
     
     
  #260  
Old Posted Oct 21, 2013, 3:42 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,652
Quote:
Originally Posted by Doug View Post
The first tower has Cenovus Energy signed up for 1m sq ft.

Calgary has one of the most volatile office markets on the continent so who knows what will happen to the vacancy rate. The current building boom is shaping up to be the second biggest on record, after the late 70's/early 80's. Under construction are:
-Brookfield East
-City Centre
-Eau Claire Tower

Planned to be u/c soon are:
-Bow South block
-3 Eau Claire
-Telus Sky
-Manulife

Approved and pre-leasing:
-Brookfield West
-Great West Life
-Palliser East
-Palliser West
-Century Park

If all of these are built, the downtown office space inventory would increase by around 8 or 9 million sq ft, which would be about a 20% increase.
Very interesting tidbit. Put into a different perspective that would be equivalent to 3 One World Trade Centres.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 1:10 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.