  #2881  
Old Posted Sep 23, 2013, 1:50 AM
Rico Rommheim's Avatar
Rico Rommheim Rico Rommheim is offline
Look at me!
 
Join Date: Jun 2007
Location: City of Bagels
Posts: 13,907
Haha silly Canadian bilingualism...

"Métros pour Toronto"

Enfin! Une nouvelle extension pour le métro de Toronto!
     
     
  #2882  
Old Posted Sep 23, 2013, 2:45 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,841
for those unaware, this announcement is just another development in the mess that is the Scarborough RT replacement. Up until the end of august, the plan was to replace the RT with an LRT line, and extend it to centennial college & Sheppard ave. In august, literally days after the zoning applications were applied for the new stations, the province announces that it will allow a subway to be built if the city approves and the Federal government delivers the extra funds. $85 million in sunk funds for the LRT plan are assumed lost, and we enter this current bumbling mess. last week the Provincial Tranport Minister announced that they would be building a shorter subway to just Scarborough Town Centre (the current terminus of the RT), with only 2 stops. (on a 5.8km route that currently has 4 stops) The minister states that this is due to the feds refusing to communicate about funding. (they kept cancelling meetings with the minister) Then today, Harper announces he will fund it... All the while many people claim that the original LRT plan will be better as it is $1 billion less to construct, covers a larger area, and can be finished 3 years earlier.

a nice graphic showing the different options on the table by the National Post, the "City subway proposal" is now the one going through.

     
     
  #2883  
Old Posted Sep 23, 2013, 2:51 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
West LRT phototour - extensive photos in the *spoiler* section beneath each primary photo


Downtown West/Kerby Station



Sunalta Station



Shaganappi Point Station



Westbrook Station





45th Street Station



Sirocco Station



69th Street Station







An example of an at-grade crossing, one of 4 on the West Line.




... and an example of the guideway types...




All photos by me.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.

Last edited by Chadillaccc; Sep 24, 2013 at 2:40 AM. Reason: Added more extensive photos
     
     
  #2884  
Old Posted Sep 23, 2013, 1:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,774
Quote:
Originally Posted by Innsertnamehere View Post
for those unaware, this announcement is just another development in the mess that is the Scarborough RT replacement. Up until the end of august, the plan was to replace the RT with an LRT line, and extend it to centennial college & Sheppard ave. In august, literally days after the zoning applications were applied for the new stations, the province announces that it will allow a subway to be built if the city approves and the Federal government delivers the extra funds. $85 million in sunk funds for the LRT plan are assumed lost, and we enter this current bumbling mess. last week the Provincial Tranport Minister announced that they would be building a shorter subway to just Scarborough Town Centre (the current terminus of the RT), with only 2 stops. (on a 5.8km route that currently has 4 stops) The minister states that this is due to the feds refusing to communicate about funding. (they kept cancelling meetings with the minister) Then today, Harper announces he will fund it... All the while many people claim that the original LRT plan will be better as it is $1 billion less to construct, covers a larger area, and can be finished 3 years earlier.

a nice graphic showing the different options on the table by the National Post, the "City subway proposal" is now the one going through.

If I understand correctly, the original plan was to convert the Scarborough RT to LRT (thus become an extension of the Crosstown) and extend the line further north/east. The Province wants to convert the RT to full fledged subway as an extension of the green line, but the approved plan is to build a second line for Scarborough (while super high density old Toronto still has massive dead zones), the "city subway" that tunnels through a low density suburban area.

So they went from the best and cheapest plan (blue as LRT+ short dash), converting to LRT as part of the Crosstown and extending it to an area with the potential of densification, to a OK plan (blue), converting to heavy rail as part of the green subway line to the worst plan (long dash); building an underground subway under a low density suburban area.

What are the estimated prices for each of these proposals and who is paying for the winning proposal?
     
     
  #2885  
Old Posted Sep 23, 2013, 2:23 PM
Doug's Avatar
Doug Doug is offline
Registered User
 
Join Date: Jul 2001
Posts: 10,046
That Scarborough plan is stupid. The Downtown Relief line is the only one that makes sense as heavy rail. Politics continue to confound.
     
     
  #2886  
Old Posted Sep 23, 2013, 2:33 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I think we're all with you on that one, Doug!

In my opinion, the DRL should have been built before the Crosstown!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #2887  
Old Posted Sep 23, 2013, 3:39 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Crosstown is more important than the downtown relief line.
     
     
  #2888  
Old Posted Sep 23, 2013, 3:50 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Now that Crosstown is being built DRL should take priority.

Scarborough and everyone in it should be thrown in Lake Ontario.
     
     
  #2889  
Old Posted Sep 23, 2013, 3:52 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
That's pretty harsh.

Oh, I didn't realize the crosstown was so needed.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #2890  
Old Posted Sep 23, 2013, 4:00 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by J.OT13 View Post
If I understand correctly, the original plan was to convert the Scarborough RT to LRT (thus become an extension of the Crosstown) and extend the line further north/east.
The original plan was to convert the SRT to LRT, but it will not part of the crosstown route due some scheduling and reliability issues with the at-grade section on Eglinton (that's what they said..). So in fact, both lines will terminate at Kennedy and there is still a transfer there.

What you refer to is the second (or third) plan that runs the entire crosstown route underground on Eglinton and connect the Scarborough LRT as one through route. This one cost about 1.5-2B more than the previous plan and is actually more expensive than the current subway plan.
     
     
  #2891  
Old Posted Sep 23, 2013, 4:01 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
The DRL would be largely a rush hour line while Crosstown is a necessary expansion of a diminutive network. There are alternatives tothe relief line as well. The Waterfront West LRT, Lakeshore West improvements (new and expanded stations) and the East Bayfront LRT would go a long way in providing relief for a fraction of the costs.


Some provincial minister must own property in Scarborough Centre
     
     
  #2892  
Old Posted Sep 23, 2013, 5:01 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,774
I don't see the point in spending a billion+ to convert the Scarborough RT if it doesn't become part of a longer line (Crosstown or Green line).

IMO, they shouldn't invest a cent on anything more than maintenance for Scarborough and prioritize the DORL once the Crosstown (which I think is a sensible investment) is complete.

This new "plan" is by far the biggest waste of transit money in Canadian history!
     
     
  #2893  
Old Posted Sep 23, 2013, 5:10 PM
Ramako's Avatar
Ramako Ramako is offline
Moderator
 
Join Date: Nov 2008
Location: Toronto
Posts: 4,415
Quote:
Originally Posted by J.OT13 View Post
I don't see the point in spending a billion+ to convert the Scarborough RT if it doesn't become part of a longer line (Crosstown or Green line).

IMO, they shouldn't invest a cent on anything more than maintenance for Scarborough and prioritize the DORL once the Crosstown (which I think is a sensible investment) is complete.

This new "plan" is by far the biggest waste of transit money in Canadian history!
The plan is to convert the SRT into an extension of the Bloor-Danforth subway line.
     
     
  #2894  
Old Posted Sep 23, 2013, 6:49 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,841
The LRT replacement for the rt was not to be interlinked with Eglinton,
It was going to run independently. Eglinton crosstown was needed, the Eglinton bus is one of (if not the) busiest traditional bus route in North America. DRL is not just a relief line for bloor-Yonge, it also acts as relief to overloaded streetcar lines.
     
     
  #2895  
Old Posted Sep 24, 2013, 12:24 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,774
Quote:
Originally Posted by Innsertnamehere View Post
Our they building the City subway proposal and if so, what is the use of it exactly. To me it just looks like a subway line under low density suburbs. It isn't serving anything new. Or, is it a replacement for the SRT, in which case, I still don't get it.
     
     
  #2896  
Old Posted Sep 24, 2013, 12:35 AM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 39,065
It's a replacement for the SRT, which is nearing the end of its useful life.
     
     
  #2897  
Old Posted Sep 24, 2013, 12:40 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,774
Quote:
Originally Posted by vid View Post
It's a replacement for the SRT, which is nearing the end of its useful life.
So there taking out the SRT completely? If so, why not use the same right of way? I'm sure they could use some of the existing infrastructure.

Even then, I've never seen other cities replacing a rapid transit line 30 years after completion.
     
     
  #2898  
Old Posted Sep 24, 2013, 1:27 AM
P. Alouishous P. Alouishous is offline
Registered User
 
Join Date: Jul 2012
Posts: 136
Quote:
Originally Posted by J.OT13 View Post
So there taking out the SRT completely? If so, why not use the same right of way? I'm sure they could use some of the existing infrastructure.

Even then, I've never seen other cities replacing a rapid transit line 30 years after completion.
omg, just take 30 seconds and do a google search
     
     
  #2899  
Old Posted Sep 24, 2013, 2:34 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,774
Quote:
Originally Posted by P. Alouishous View Post
omg, just take 30 seconds and do a google search
Not that simple when there are a hell load of plans for one project. I just figured I could get a straight answer from a forum with people from the area. Even Harper doesn't seem to know what the heck he's funding.
     
     
  #2900  
Old Posted Sep 24, 2013, 3:17 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,841
RT was an experiment for ICTS tech, (skytrain) was a failure. costs just as much to modernize to MKIII ICTS as it does to convert to LRT, so the plan was to convert to LRT to match the rest of the network being built. (note how it was a conversion) Ford went nuts claiming that it was going to interrupt street traffic (it won't) and called for a subway. Scarberians sucked it up and the liberals were forced their hand if they wanted to keep the Scarborough seat in the recent byelections. Feds give money, subway happens instead of conversion.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 12:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.