Quote:
Originally Posted by freeweed
I dunno, I've been in the cabs and I'd say even 4 people would be a tight squeeze, even with the equipment and wall removed - unless you completely re-designed the ends of the things. Extending them so that the space between cars could be used would add a LOT more space.
But I haven't exactly taken a measuring tape to the whole thing, so I'm quite possibly completely off-base here.
From what I gather, CT is only planning on running 4-car trains during rush hour. So means continual juggling of the cars anyway - and having "special" cars with no driver cabs just makes this that much more complicated.
|
Keep in mind, that in the newer cars (i.e. not U2s), there's a LOT of electrical components in that wall between the coach and the cab. There'd have to be another place to put all those racks of equipment, breakers, switches, etc., so I'm not sure you'd gain much space once another spot is found (presumably pressed up againt the end of the car).
As for intercompatibility, I'd imagine the new cars will be compatible with the Series 8 SD160NGs (as someone said, that would've been part of the RFP). And as lucx mentioned

, midlife refurbishments of the Series 5,6 & 7s is supposed to include upgrades that allow intercompatibility with the NG cars. That being said, remember that the orginal SD160s were supposed to be compatible with the U2s - and it's still a very rare sight to see.