HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 2, 2013, 2:55 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Buggys View Post
How about we get the O-train to loop around going South of the airport, across the Strandherd-Armstrong Bridge, run past Baseline Station near the college, and connect to Bayshore station via the Confederation Line.

...Might as well, if the plan is to have rail that far South on both sides of the bridge anyway. Gosh, how hard is it to contract a bridge-builder with enough insurance to ensure construction without delays & the City loosing money.
Although not exactly as described, this was the Chiarelli plan that we chose to cancel. It also had an east-west element largely using existing track.

The plan to build the O-Train across the Strandherd-Armstrong bridge has been cancelled.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:28 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.