HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #5201  
Old Posted Aug 2, 2013, 6:10 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Traffic lights are up at the United Blvd offramp.

It's too bad they couldn't fit in a westbound onramp from United Blvd.
     
     
  #5202  
Old Posted Aug 2, 2013, 8:08 PM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by martinishaker View Post
Road lines are starting to be painted on the Boundary Road overpass.
http://wcs.pbaeng.com/projects/PMH1
Highway 1 westbound cam shows the progress
From the webcam pics it looks like the merging lane into TCH-1 from Boundary is still going to be pretty short.
     
     
  #5203  
Old Posted Aug 2, 2013, 9:39 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by The_Henry_Man View Post
From the webcam pics it looks like the merging lane into TCH-1 from Boundary is still going to be pretty short.
http://www.pmh1project.com/Design%20Draw...t%20Ave%20Interchange%20-%2020120207.pdf

150-175 metres? Kinda short but there was no merging lane at all before.
     
     
  #5204  
Old Posted Aug 6, 2013, 1:46 AM
adrianroam95 adrianroam95 is offline
Registered User
 
Join Date: Aug 2010
Location: Coquitlam, BC
Posts: 214
http://www.pmh1project.com/Construction%...ngdon%20Weekend%20Warrior%2020130730.pdf

I drove by the area a few hours ago, and noticed that all the paving work they've been doing on Willingdon Ave. over the long weekend seems to be mostly done. Hopefully this means that the alignment of the southern approach to the overpass will be fixed for the morning rush tomorrow. That area has been a mess for too long.
     
     
  #5205  
Old Posted Aug 6, 2013, 2:59 AM
mezzanine's Avatar
mezzanine mezzanine is offline
Registered User
 
Join Date: Aug 2002
Posts: 2,011
For some reason the HOV onramp EB at grandview was open this weekend. A nice bonus for HOV users as it takes you over the merge points for the regular onramp and the off ramp for willingdon and drops you directly (free-flow it seems like) to HWY 1 HOV.

HOV exit WB is still closed....
     
     
  #5206  
Old Posted Aug 6, 2013, 3:47 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
EB Grandview HOV on-ramp has been open for a few weeks now. Quite nice, I agree!
     
     
  #5207  
Old Posted Aug 6, 2013, 4:35 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by mezzanine View Post
For some reason the HOV onramp EB at grandview was open this weekend.
Yep, it's permanently open now, and it's become our regular way onto the freeway because it avoids having to weave with traffic exiting at Willingdon. I personally don't care so much about the westbound HOV exit because there's no real issue with taking the regular exit - plus once it's open the HOV traffic heading west on Grandview will have to merge left out of the curb lane before getting to Skeena.
     
     
  #5208  
Old Posted Aug 6, 2013, 8:59 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,406
Long weekend and return traffic both from the Interior and the US caused yesterday a constant stop-and-go bumper-to-bumper traffic jam all the way to Chilliwack. Between Chilliwack and Abbotsford both westbound lanes were full of cars and moving at bicycle speeds. Only after Abbotsford did the traffic flow increase, still stopping completely few times before 200 Street. From there onwards it was smooth sailing all the way to Vancouver.

I have never experienced such a congestion on such a long strecth of the highway. Highway 1 would badly need to be expanded to 3+3 lanes all the way to Chilliwack.
     
     
  #5209  
Old Posted Aug 6, 2013, 9:41 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
I was on my way back from the Metro Vancouver Zoo and Lynden, WA with my wife and kids, saw the backup on Hwy 1 WB, and decided to take 88 Ave instead via Fort Langley. Google Maps noted going on Hwy 1 would've taken me 29 minutes vs. 38 minutes via 88 Ave., but it didn't show any traffic at all on Hwy 1 (strange...), but meh I got to enjoy a nice scenic drive in my car that I never get to drive much these days. Got back onto Hwy 1 at the 202 St HOV onramp where the freeway was wide open at that point, got off at 156 St HOV offramp. Pretty cool, never touched the general lanes.
     
     
  #5210  
Old Posted Aug 6, 2013, 9:46 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by Klazu View Post
Long weekend and return traffic both from the Interior and the US caused yesterday a constant stop-and-go bumper-to-bumper traffic jam all the way to Chilliwack. Between Chilliwack and Abbotsford both westbound lanes were full of cars and moving at bicycle speeds. Only after Abbotsford did the traffic flow increase, still stopping completely few times before 200 Street. From there onwards it was smooth sailing all the way to Vancouver.

I have never experienced such a congestion on such a long strecth of the highway. Highway 1 would badly need to be expanded to 3+3 lanes all the way to Chilliwack.
Whats all the work they're doing east of 200th in the middle of the highway

Are they widening past 200th?
     
     
  #5211  
Old Posted Aug 6, 2013, 9:48 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by libtard View Post
Whats all the work they're doing east of 200th in the middle of the highway

Are they widening past 200th?
They are adding a third climbing lane eastbound between 232 St. and 264 St. I'm guessing the lane will start at the 232 St. onramp and end at the 264 St. off ramp but I could be wrong...
     
     
  #5212  
Old Posted Aug 6, 2013, 11:23 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by DKaz View Post
They are adding a third climbing lane eastbound between 232 St. and 264 St. I'm guessing the lane will start at the 232 St. onramp and end at the 264 St. off ramp but I could be wrong...
That's correct. One new eastbound lane up the hills to 264 Street from 232 Street.

I think we'll see something announced in the next few years to widen the Highway to Abbotsford as a Phase 1 and then Chilliwack as a Phase 2.

It's desperately needed from both a volume and safety standpoint.
     
     
  #5213  
Old Posted Aug 7, 2013, 2:19 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by aberdeen5698 View Post
Yep, it's permanently open now, and it's become our regular way onto the freeway because it avoids having to weave with traffic exiting at Willingdon. I personally don't care so much about the westbound HOV exit because there's no real issue with taking the regular exit - plus once it's open the HOV traffic heading west on Grandview will have to merge left out of the curb lane before getting to Skeena.
Ya but at least they will only have to merge over to left one lane to continue on Grandview Hwy. With the old system as we have known it. Those in the WB HOV lane would of had to of crossed 2 full lanes before getting into the lane to exit. The more you decrease the amount of lane changes in an area the better your traffic flow and it lowers the chances of traffic accidents.

Right now there is a bottleneck along the #1 WB around Brunnette. Due to loosing a lane. Once that 4th lanes is open till Grandview. I think we will discover that that HOV lane will be needed for the increase in vehicles that the #1 will dump on Grandview and Boundary.
     
     
  #5214  
Old Posted Aug 7, 2013, 2:24 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by Klazu View Post
Long weekend and return traffic both from the Interior and the US caused yesterday a constant stop-and-go bumper-to-bumper traffic jam all the way to Chilliwack. Between Chilliwack and Abbotsford both westbound lanes were full of cars and moving at bicycle speeds. Only after Abbotsford did the traffic flow increase, still stopping completely few times before 200 Street. From there onwards it was smooth sailing all the way to Vancouver.

I have never experienced such a congestion on such a long strecth of the highway. Highway 1 would badly need to be expanded to 3+3 lanes all the way to Chilliwack.
That is par for the course on a long weekend.

Worst I ever saw and stuck in. Traffic was stop and go averaging maybe 10-20 KM/H from Hope till the old Port Mann. It was so bad people were actually trying to drive through the ditches along the #1 in Abbotsford and Chilliwack to get onto the side roads.
     
     
  #5215  
Old Posted Aug 7, 2013, 4:31 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by cabotp View Post
Ya but at least they will only have to merge over to left one lane to continue on Grandview Hwy. With the old system as we have known it. Those in the WB HOV lane would of had to of crossed 2 full lanes before getting into the lane to exit.
Of course. I was speaking for my own personal use - I never travel at peak times and although I have my wife in the vehicle I don't normally use the HOV lanes because traffic almost always flows very smoothly. I also like to drive at or very close to the speed limit (which is currently 80km/h on that section of the freeway) and for some strange reason it really seems to freak some people out if I do that in the HOV lane - even though the limit applies as much to that lane as much as it does all the other ones.

It's worth it to me to use the eastbound Grandview HOV on-ramp to avoid the weaving at Willingdon - and while I have to merge left two lanes to get into my preferred rightmost lane I as much time as I need to do that. But at the westbound Grandview exit there's really no reason for me not to just use the normal right-hand off-ramp.

So if there are others like me then I'm thinking that the eastbound HOV ramp may see more use than than the westbound one. Especially since using the westbound ramp makes it a lot more difficult to use the left turn at Boundary that's recently been reinstated.
     
     
  #5216  
Old Posted Aug 7, 2013, 5:08 PM
Xrayal's Avatar
Xrayal Xrayal is offline
Registered User
 
Join Date: Jul 2008
Location: New Westminster
Posts: 174
TI Corporation put out a RFP for the Cariboo Road overpass and a Gaglardi Weigh Scale. Link
Wasn't this included in the original project bid. Why is it now separate?

I couldn't tell from the drawing included in this bid. But wasn't the new overpass suppose to cross just east of the current one?

I wonder why Gagladri has been chosen as the new location for a scale?
Also interesting they refer to the weigh scale station as "mobile". But this also could be just referring to the mobile home style booth structure they seem to use.
     
     
  #5217  
Old Posted Aug 7, 2013, 5:46 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The United Blvd offramp from Hwy 1 has been reopened. Access from Lougheed Hwy is not open yet, but it has been painted.

Images from the webcams.





     
     
  #5218  
Old Posted Aug 7, 2013, 7:45 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,663
Cool.
Thanks for pointing that out.
     
     
  #5219  
Old Posted Aug 8, 2013, 6:52 AM
jlenko jlenko is offline
Registered User
 
Join Date: Nov 2010
Location: Willoughby
Posts: 127
Pic taken a few days ago from the gravel access road just north of the SFPR, under the old Port Mann bridge... where they're taking off the road surface:

http://www.bcjbody.org/jlenko/sfpr/photo.JPG

The debris falling from this area today (just north of the SFPR, onto the gravel area just south of where I took this shot) was crazy... I can't imagine how they're going to divert traffic around that falling debris in a few days when they get right over top of the SFPR...
     
     
  #5220  
Old Posted Aug 8, 2013, 6:57 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,958
Lots of work going on along the #1 tonight, many stretches are getting their final surfacing done it seems.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.