HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #121  
Old Posted May 2, 2013, 11:55 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Yeah you're right it's probably soil samples, that's what me and my bf thought when we walked by but I just said driving piles cause it looks like a pile driver.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #122  
Old Posted May 3, 2013, 4:26 AM
Bokimon's Avatar
Bokimon Bokimon is offline
Master and Commander
 
Join Date: Aug 2005
Location: CALGARY
Posts: 1,887
Yup, a Geotech report is mandatory as part of permit application. Even more so for large towers like this so it will be at least a month or two before any formal permit applications are made and of course that is pending official release of the DP.

My bet is that they will go for an excavation/shoring permit to at least start the dig. I can't see what obstacles there would be for applying this other than possibly the geo report and a decently complete drawing set which will be hundreds of pages of various disciplines. Time is moving by fast, before we know it there will be luffer cranes perched inside the pit.
__________________
Follow @kimbo_snaps on Instagram &
Bokimon- on Flickr for SSP local & Travel coverage.
Architecture, Aviation, Scenery, Skylines
Reply With Quote
     
     
  #123  
Old Posted May 3, 2013, 6:35 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Moving along! This will give Brookfield extra time to add some more height! LOL.
Reply With Quote
     
     
  #124  
Old Posted May 14, 2013, 6:48 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
There's an excavator on-site this morning. Not doing anything yet. But it's there.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #125  
Old Posted May 15, 2013, 1:46 AM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,222
Here's hoping they can get a shoring permit, though that's usually part of the BP and AFAIK they don't have a DP yet.
__________________
Git'er done!
Reply With Quote
     
     
  #126  
Old Posted May 17, 2013, 7:48 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
DP given yesterday 5/16! Wish they could find another 3-4 floors for this one.
Reply With Quote
     
     
  #127  
Old Posted May 18, 2013, 2:04 PM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
I was hoping the city would issue Brookfield a DP for 64 floors...
Reply With Quote
     
     
  #128  
Old Posted Jun 18, 2013, 11:09 PM
333609543's Avatar
333609543 333609543 is offline
Registered User
 
Join Date: Jun 2013
Location: Toronto
Posts: 284
I'm glad Calgary is getting much more urbanized, It clearly states that Calgary is growing into a metropolis.
Reply With Quote
     
     
  #129  
Old Posted Jun 19, 2013, 5:18 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
There's a sign on the 1st Street side of the lot saying "WARING: Open excavation in progress" so... that might be something
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #130  
Old Posted Jun 19, 2013, 8:16 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
If the rumours about Cenovus signing as a lead tenant are true, I'd expect this to begin construction before September pending BP approval.

Glad Ellis Don got the contract. They are proving to be very worthy of big projects in this city with their quick and efficient work style!
Reply With Quote
     
     
  #131  
Old Posted Jun 19, 2013, 8:22 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
Currently, the route for the servicing (utilities) is underway in autocad land. It is still progressing.

Its crazy how much Calgary has changed in 8 years.....and the next three will be quite something as well. The density is getting amazing for such a small place. Actually, most of the Canadian cities are impressive these days.
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
  #132  
Old Posted Jul 19, 2013, 7:18 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Anyone else find it odd that this building has like 3 renders and Telus Sky had dozens?

Bit strange for a new tallest, no?
Reply With Quote
     
     
  #133  
Old Posted Jul 19, 2013, 7:37 PM
artvandelay's Avatar
artvandelay artvandelay is offline
Registered User
 
Join Date: Dec 2007
Location: The City of Cows
Posts: 1,670
Quote:
Originally Posted by The Fisher Account View Post
Anyone else find it odd that this building has like 3 renders and Telus Sky had dozens?

Bit strange for a new tallest, no?
As there's no residential component, this building doesn't need to market itself as much. Especially if the rumours of having a lead tenant already secured are true.
Reply With Quote
     
     
  #134  
Old Posted Jul 19, 2013, 10:46 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by artvandelay View Post
As there's no residential component, this building doesn't need to market itself as much. Especially if the rumours of having a lead tenant already secured are true.
Yeah - and with that rumoured new lead tenant revealing spectacular numbers next week for Q2
Reply With Quote
     
     
  #135  
Old Posted Jul 20, 2013, 7:05 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Any chance the height of this gets bumped up? Really want to see something significantly taller than the Bow.
Reply With Quote
     
     
  #136  
Old Posted Jul 25, 2013, 2:13 AM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Time to rename this thread to 'Brookfield Place Calgary'

Reply With Quote
     
     
  #137  
Old Posted Jul 25, 2013, 3:16 AM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
Cenovus is leasing 1 million of the 1.4 million square feet in the first tower.

This baby is a go!
Reply With Quote
     
     
  #138  
Old Posted Jul 25, 2013, 3:17 PM
Husky Tower Husky Tower is offline
Registered User
 
Join Date: Aug 2006
Location: Edmonton
Posts: 110
Quote:
Originally Posted by The Fisher Account View Post
Time to rename this thread to 'Brookfield Place Calgary'

On a technical note, the rendering still shows the 17 storey BVS 1 sited behind the Len Werry building (where the Grand theatre actually is), and not across 6th Avenue to the north and behind the new Brookfield monolith in the BVS complex (where it actually belongs).

I guess nobody but skyscraper geeks would notice that though, eh?

HT
Reply With Quote
     
     
  #139  
Old Posted Jul 25, 2013, 5:30 PM
tele75's Avatar
tele75 tele75 is offline
Registered User
 
Join Date: Jul 2011
Location: Sherwood Park/Edmonton
Posts: 251
Quote:
Originally Posted by Bigtime View Post
Cenovus is leasing 1 million of the 1.4 million square feet in the first tower.

This baby is a go!
Nice! Awesome for Calgary.
Reply With Quote
     
     
  #140  
Old Posted Jul 25, 2013, 6:02 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by Bigtime View Post
Cenovus is leasing 1 million of the 1.4 million square feet in the first tower.

This baby is a go!
That should make a lot of their people happy.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.