Quote:
Originally Posted by Arquitect
Yes, Block 12 is topped out, well half of it, the other half still has to be poured. But the height we see is the final height. And cranes are common for all cast in place concrete work like this. Those forms are really heavy, so a crane is a must.
As for the Chili's parking lot, something is coming soon. But what was there before the parking lot was a really awful strip mall which had huge mold issues. ASU had used it for storage, but the conditions got so bad that they had to demolish it. I'm not a fan of parking lots, but I think it is better than a one story stucco-clad health hazard. Especially knowing that ASU is wanting to develop the lot, and it is just a matter of time before we see that.
|
I definitely wouldn't argue that the previous strip mall on Uni/Mill was worth saving, but seeing that massive sea of asphalt in an aerial shot is pretty shocking. I do think the demolition of the Arches (for University Square) was a miss, as we haven't seen any movement there at all and that building, while unattractive, was in decent shape, built up to the street, and filled with tenants.
Thanks for the information regarding the cranes - that definitely makes sense. Does anyone have details regarding the rest of the Block 12 project: site plan, timeline, etc.? At one point, there was a tall, residential component that I hope is still in the works. Gobbling up valuable and limited land in the core and wasting it on 6-story buildings would be a shame, though at least this phase does include dining that doesn't seem to be student-only.
Meanwhile, the College Avenue streetscape plan was recently reviewed, but I can't find details on that, aside from a Facebook announcement when SmithGroupJJR was selected in January:
"As part of the SmithGroupJJR team, Wood/Patel was selected by ASU for their College Avenue Streetscape project. The team will provide design services for the streetscape of College Avenue between 6th and 7th Streets and master plan from University Drive to 5th Street in Tempe. We look forward to continuing work with SmithGroupJJR and ASU."
Seems rather silly if I am reading correctly that they're only addressing 6th-7th street? If anything, starting at the south end would make more sense, since the northern end is almost completely developed, but I guess that argument can go both ways.
On a related note, final plans were selected for the University (Priest-Ash) and Broadway (Mill-Rural) streetscape projects, scheduled for late 2014 and early 2015.
1) University: http://www.tempe.gov/modules/showdocument.aspx?documentid=17674
This plan is rather underwhelming, though the new/enhanced bike lanes will be a benefit. There's no shade on either the north or south sides of the street, with the only landscaping being within the new center medians. However, even those were reduced from earlier stages of the plan to allow for more left-turn availability.
2) Broadway: http://www.tempe.gov/modules/showdocument.aspx?documentid=18645
The selected concept includes the removal of 1 eastbound lane, addition of bike lanes in both directions, a new 8' privacy wall on the north side, and shaded sidewalks on the south. It does seem a bit strange that there is no sidewalk on the north end, though... no?