Quote:
Originally Posted by nname
Actually, the original plan is TWO Hwy 1 routes - one new route to Lougheed and another (improved and re-branded 509) to Surrey Central via Guildford. Both of these routes would get 10min peak service, but less frequent service off-peak. Only the first route is implemented as phase 1.
|
There's been ideas thrown out about that route, but so far has there been any confirmation of the rapid-ization of that route? (Between surrey central and carvolth)
Quote:
Originally Posted by Mac Write
What would be faster Skytrain or HWY 1 from Lougheed to Rupert station? Could a Rapid bus using the HOV lanes do it faster (I know the HOV lanes end at Ganview). Or how about Brentwood which the HOV lanes already goto? Lougheed to Brentwood is a 10 minute Skytrain ride.
I can't remember how long the 99 took from Brentwood to Lougheed. Anyone remember? I know sometimes the 99 would take the highway (and it was really cool when it did). Anyone remember the time it took via the highway?
|
Lougheed is the best terminus for the 555 in my opinion. If you were to move the terminus to a station farther west, riders who currently take the millennium line to waterfront would be forced to transfer at lougheed when the evergreen line opens.
Not to mention that by extending the route, it will cost much more for translink to operate the 555. It takes the bus 23 minutes to run the route in it's entirety; the driver gets a 7 minute lay-over. With this timeframe, translink only needs 2 buses on the route during off-peak hours. Extend the route to Brentwood or even Renfrew, and the bus wouldn't be able to make it in under 30 minutes. This would mean translink would need 4 buses, or double the amount of buses, which means it would cost
double the ammount of money just to run the route. And the frequencies wouldn't improve.
You need to remember that money means everything to translink, since it's in the middle of a funding crisis.