Old Posted Jul 18, 2013, 7:42 AM
Tfreder Tfreder is offline
Registered User
 
Join Date: Jun 2012
Posts: 225
Translink is/was just waiting for the Government St. HOV offramps to be completed before moving the terminus of the 555 from braid to lougheed. When it eventually is rerouted there, nothing else will change.

But there definitely aren't any plans for the 555 to go to Vancouver. Translink is moving away from the old system of direct buses from the suburbs to downtown. Buses that terminate at Skytrain stations are favoured now (hence the 555 ending at braid).
     
     
  #10982  
Old Posted Jul 18, 2013, 7:50 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
Quote:
Originally Posted by Kapten View Post
For example, the Expo Line power rail replacement project kicks off at 8 PM Sunday through Thursday nights.
The power rail replacement is different from regular maintenance though. The replacement only need to work on 130m segment per night so only a small section need to be shut off. The maintenance need to close off a much longer segment.


Quote:
Originally Posted by Tfreder View Post
The only difference between the current rapid bus and the full rapid bus (At launch) would've been 10 min frequencies off-peak in the full version. There aren't really any other rapid bus routes that have been proposed; they're just speculation and concepts (ie: not happening any time soon).
Actually, the original plan is TWO Hwy 1 routes - one new route to Lougheed and another (improved and re-branded 509) to Surrey Central via Guildford. Both of these routes would get 10min peak service, but less frequent service off-peak. Only the first route is implemented as phase 1.
     
     
  #10983  
Old Posted Jul 18, 2013, 6:41 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Ok when the Terminal is moved from Braid to Lougheed, will the bus still stop at Braid? That's my confusion. Also couldn't they go even further in Vancouver to make for a faster connection? Maybe Renfrew since the highway passes by there? Just trying to figure out which transfer point would make for the fastest connection to downtown.
     
     
  #10984  
Old Posted Jul 18, 2013, 7:12 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by Mac Write View Post
Ok when the Terminal is moved from Braid to Lougheed, will the bus still stop at Braid? That's my confusion. Also couldn't they go even further in Vancouver to make for a faster connection? Maybe Renfrew since the highway passes by there? Just trying to figure out which transfer point would make for the fastest connection to downtown.
No. Braid is purely interim until the bus/HOV Goverment Street ramps at Highway 1 are complete. Once the terminus of the #555 is complete in Burnaby/Coquitlam, it will end to connect with the Millennium Line there.
     
     
  #10985  
Old Posted Jul 18, 2013, 7:14 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by Mac Write View Post
Ok when the Terminal is moved from Braid to Lougheed, will the bus still stop at Braid? That's my confusion. Also couldn't they go even further in Vancouver to make for a faster connection? Maybe Renfrew since the highway passes by there? Just trying to figure out which transfer point would make for the fastest connection to downtown.
I can't imagine that they'd still stop at Braid - it would completely defeat the purpose of the dedicated freeway ramps being built to allow the buses to access Lougheed.

When you factor in rush hour traffic between the freeway and any of the other Skytrain stations, I strongly doubt a longer bus run would be any faster - especially if it also stops at Lougheed. And a lot of people coming over the bridge aren't heading downtown. It's hard to find a more strategic place to drop people off than Lougheed, since it lets them head in pretty much any direction they want to. And with the dedicated freeway exit so close to the station it should be very fast.
     
     
  #10986  
Old Posted Jul 18, 2013, 10:42 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Is this the original route map?

     
     
  #10987  
Old Posted Jul 19, 2013, 12:29 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Yes it is, but those diamonds are not indicative of bus stops.
     
     
  #10988  
Old Posted Jul 19, 2013, 5:31 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,679
Has there been any indication of "future stops"? Would it be worthwhile for somebody from Abbotsford to get on a bus, even a rapid bus like this?
     
     
  #10989  
Old Posted Jul 19, 2013, 6:08 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,010
If they need to access somewhere on near skytrain it would, but such a route extension would have to coincide with the construction of HOV lanes out to Abbotsford IMO.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #10990  
Old Posted Jul 19, 2013, 6:15 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
What would be faster Skytrain or HWY 1 from Lougheed to Rupert station? Could a Rapid bus using the HOV lanes do it faster (I know the HOV lanes end at Ganview). Or how about Brentwood which the HOV lanes already goto? Lougheed to Brentwood is a 10 minute Skytrain ride.

I can't remember how long the 99 took from Brentwood to Lougheed. Anyone remember? I know sometimes the 99 would take the highway (and it was really cool when it did). Anyone remember the time it took via the highway?
     
     
  #10991  
Old Posted Jul 19, 2013, 6:44 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
Quote:
Originally Posted by Mac Write View Post
What would be faster Skytrain or HWY 1 from Lougheed to Rupert station? Could a Rapid bus using the HOV lanes do it faster (I know the HOV lanes end at Ganview). Or how about Brentwood which the HOV lanes already goto? Lougheed to Brentwood is a 10 minute Skytrain ride.
Most likely slower via Hwy 1 during day time, but slightly faster at night. AFAIK, it takes about 5min drive to go from the Willingdon interchange to Brentwood station. Traffic is quite bad there.

But why would TransLink even want to extend service westward? It cost them nothing if people take skytrain for that segment as there are still plenty of space available on the Millennium Line. However, a one way bus trip would add about $35 in operation cost per run assuming it takes 15min and the operation cost is $130/hour. Base on the current schedule, that's $4500 per day, $26,000 per week, or $1.35 million per year without any getting additional revenue in fare. To the rider, the trip is exactly the same unless their final destination is Brentwood or Rupert, since they have to transfer anyways.
     
     
  #10992  
Old Posted Jul 19, 2013, 6:59 AM
Tfreder Tfreder is offline
Registered User
 
Join Date: Jun 2012
Posts: 225
Quote:
Originally Posted by nname View Post
Actually, the original plan is TWO Hwy 1 routes - one new route to Lougheed and another (improved and re-branded 509) to Surrey Central via Guildford. Both of these routes would get 10min peak service, but less frequent service off-peak. Only the first route is implemented as phase 1.
There's been ideas thrown out about that route, but so far has there been any confirmation of the rapid-ization of that route? (Between surrey central and carvolth)
Quote:
Originally Posted by Mac Write View Post
What would be faster Skytrain or HWY 1 from Lougheed to Rupert station? Could a Rapid bus using the HOV lanes do it faster (I know the HOV lanes end at Ganview). Or how about Brentwood which the HOV lanes already goto? Lougheed to Brentwood is a 10 minute Skytrain ride.

I can't remember how long the 99 took from Brentwood to Lougheed. Anyone remember? I know sometimes the 99 would take the highway (and it was really cool when it did). Anyone remember the time it took via the highway?
Lougheed is the best terminus for the 555 in my opinion. If you were to move the terminus to a station farther west, riders who currently take the millennium line to waterfront would be forced to transfer at lougheed when the evergreen line opens.

Not to mention that by extending the route, it will cost much more for translink to operate the 555. It takes the bus 23 minutes to run the route in it's entirety; the driver gets a 7 minute lay-over. With this timeframe, translink only needs 2 buses on the route during off-peak hours. Extend the route to Brentwood or even Renfrew, and the bus wouldn't be able to make it in under 30 minutes. This would mean translink would need 4 buses, or double the amount of buses, which means it would cost double the ammount of money just to run the route. And the frequencies wouldn't improve.

You need to remember that money means everything to translink, since it's in the middle of a funding crisis.
     
     
  #10993  
Old Posted Jul 19, 2013, 7:12 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I am just trying to figure out how to get people into Vancouver faster with only 1 transfer. True Lougheed has the M-Line to Waterfront but that takes 12 minutes longer then transfering at Broadway (purely guessing).

I am just throwing out ideas. It would be really cool to see a long route express with like 30+ minutes between a single stop

Braid really needs a Park and Ride on that empty land (and use a robo car park to get double the capacity). That would sure increase Skytrain users.
     
     
  #10994  
Old Posted Jul 19, 2013, 7:26 AM
Tfreder Tfreder is offline
Registered User
 
Join Date: Jun 2012
Posts: 225
Quote:
Originally Posted by Mac Write View Post
I am just trying to figure out how to get people into Vancouver faster with only 1 transfer.
This right here is the problem: it's not about trying to get people downtown faster, it's about providing as many transit options as possible. While it's true that a large number of people commute downtown, many other people commute to coquitlam, metrotown, new westminister, SFU, and places in between.

If you move the terminus farther west, you're screwing all of these people, while maybe saving people who commute downtown 4-7 minutes, at best.
     
     
  #10995  
Old Posted Jul 19, 2013, 7:41 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
Quote:
Originally Posted by Mac Write View Post
I am just throwing out ideas. It would be really cool to see a long route express with like 30+ minutes between a single stop
Check out the 352 and 354. Its a 30min ride during PM peak between Steveston Hwy and South Surrey P&R with no intermediate stop in between.

And if you want a more "urban" option, try the 190. Its officially 24min between stops from the schedule, but quite often it takes more then 30min when the traffic is bad on Hasting and Barnet Hwy. Also, if you get on at downtown, you're not allowed to get off until you ride it for a good 45min


Quote:
Originally Posted by Tfreder View Post
There's been ideas thrown out about that route, but so far has there been any confirmation of the rapid-ization of that route? (Between surrey central and carvolth)
That's the "official" TransLink plan. The map from the previous post is actually the provincial plan. They are actually different

TransLink's plan can be found in page 17 of this document.
     
     
  #10996  
Old Posted Jul 19, 2013, 8:27 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
and on page 12 - first time I've seen a render of the 3rd platform at Broadway Station.
Looks like there's a whole new bridge across the Cut to Commercial Station.



Uploaded with ImageShack.us
http://www.geoffmeggs.ca/wp-content/uplo...aterials-for-Oct-7-Municipal-Update1.pdf
     
     
  #10997  
Old Posted Jul 19, 2013, 9:27 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
I can't believe I missed that. I always wondered how that bridge will look like. Pretty interesting.
     
     
  #10998  
Old Posted Jul 19, 2013, 11:22 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
I had expected the new platform passarelle to end with an escalator on the south side of the Cut (with passengers using the existing bridge) rather than the passarelle bridging the cut to Commercial Station - but I guess the existing bridge is too narrow for future growth (?)
     
     
  #10999  
Old Posted Jul 19, 2013, 2:10 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,679
Quote:
Originally Posted by officedweller View Post
I had expected the new platform passarelle to end with an escalator on the south side of the Cut (with passengers using the existing bridge) rather than the passarelle bridging the cut to Commercial Station - but I guess the existing bridge is too narrow for future growth (?)
It can get pretty busy during peak hours, with lots of traffic going both ways. Widening the bridge makes much more sense than what appears to be a separate crossing.
     
     
  #11000  
Old Posted Jul 19, 2013, 6:14 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,516
Quote:
Originally Posted by Kapten View Post
When I lived in Chicago the red and blue line trains (elevated/subway) operated 24/7 service; they still do. NYC's entire subway system is 24/7. I think that Skytrain should be capable of 24/7 service on Friday & Saturday nights and 4 AM to 2 AM service on other nights. As the city grows there will be more people working later shifts and it is important to serve this population (and others) with rapid transit.
And Paris shuts down quite early, as does London. Nice cherry pick of data there.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.