HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


View Poll Results: Which of the designs would you like to see become the new Lansdowne 'Front Lawn'?
Option A: "One Park, Four Landscapes" 12 11.88%
Option B: "Win Place Show" 23 22.77%
Option C: "A Force of Nature" 14 13.86%
Option D: "All Roads Lead to Aberdeen" 16 15.84%
Option E: "The Canal Park in Ottawa" 18 17.82%
None of the above. Please keep my ashphalt. 18 17.82%
Voters: 101. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #2681  
Old Posted Jul 7, 2013, 1:14 AM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
Quote:
Originally Posted by JackBauer24 View Post
I believe the key word was "successful" - 99.9% of the names on that list I've read for the first time, and I go to JFL almost every year in Montreal.
I guess Ottawans need to have a good sense of humour.
Most of the people on the list I provided *are* successful. And most of the names of Ottawa or Canadian comedic icons mentioned on here I've never heard of either. So there you go.
__________________
Loin des yeux, loin du coeur.
Reply With Quote
     
     
  #2682  
Old Posted Jul 10, 2013, 2:17 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
D&G Landscaping secures Lansdowne’s urban park contract

By Laura Armstrong, OTTAWA CITIZEN July 9, 2013 8:06 PM


OTTAWA — D&G Landscaping will build the urban park at Lansdowne, Mayor Jim Watson announced Tuesday.

After a prequalification process, four contractors received a final tendering package and had to submit detailed bids. D&G Landscaping was ultimately chosen by the City of Ottawa’s chief procurement officer to make sure it conformed to the city’s purchasing bylaw.

D&G Landscaping has previously worked on such projects as the landscaping of the Canadian War Museum, the Bank Street reconstruction from Highway 417 to Holmwood Avenue and the Wellington West streetscaping. Working on the urban park at Lansdowne is a great honour, said Greg Clunie, the company’s president.

Construction of the urban park is expected to begin in late July; the installation of underground utilities for the park and interlock pavers around the Aberdeen Pavilion as well as the construction of the shuttle bus loop are all expected to be completed this summer. Although some areas of the park will be complete for Lansdowne stadium’s opening in 2014, the final features are not expected to be finished until the summer of 2015.

[email protected]

twitter.com/lauraarmy
© Copyright (c) The Ottawa Citizen
Reply With Quote
     
     
  #2683  
Old Posted Jul 11, 2013, 6:42 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,375
D&G Landscaping won the urban park contract with a bid of 16.28 million dollars . It seems quite a bit lower than the numbers which have been thrown around about the cost. Article is from the Ottawa Business Journal


Quote:
Greely firm wins $16M Lansdowne contract

Ottawa firm D&G Landscaping has beat out three other qualified bidders to win the right to build the urban park that’s part of the City of Ottawa’s Lansdowne Park redevelopment project.
Topics : Carillion Canada Inc. , Ottawa Greenbelt Construction Co. , Trinity Development Group , Ottawa , Frank Clair Stadium

The Greely-based company will receive $16.28 million for its contribution to the project, which will include installing underground utilities and building a shuttle bus loop.

D&G submitted the lowest bid among the four companies who qualified, according to the City of Ottawa’s media relations department. That beat out Carillion Canada Inc., Doran Contractors Ltd. and the Ottawa Greenbelt Construction Co.

Elsewhere on the Glebe property, Frank Clair Stadium is currently being renovated and in some places rebuilt.

Local developer Minto is constructing new condo towers at the site while Trinity Development Group is getting ready to add close to 400,000 square feet of retail to the space. However news about one of the tenant’s exit from the movie industry has left one of the largest components of that space up in the air.

The firm is set to begin construction later this month, with a lot of the work will be done by spring 2014. D&G’s work is scheduled to be completed by summer of 2015, according to a City of Ottawa news release.
Reply With Quote
     
     
  #2684  
Old Posted Jul 12, 2013, 12:27 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
They must have downscaled quite a bit. Since that would be negative publicity, the City likely won't tell us. I guess we won't know until the park portion is completed.
Reply With Quote
     
     
  #2685  
Old Posted Jul 12, 2013, 1:22 AM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,375
J.OT13 wrote

Quote:
They must have downscaled quite a bit. Since that would be negative publicity, the City likely won't tell us. I guess we won't know until the park portion is completed.
Yesterday 6:42 PM

Hard to tell as it difficult to find the actual tender documents, I did find one article that indicated these elements were included in the tender that D&G won:


Quote:
Elements in the new urban park include: • A children's play area with a state-of-the art play and climbing structure, a rubberized surface and a beginners' skateboard park • A water feature including one of five art pieces, called 'The Beacon', a metal sculpture that uses water to mimic the ebb and flow of local rivers; this water will be re-used for irrigation in the park • A refrigerated ice rink, which can be converted for curling and used as basketball courts in the summer • The Great Lawn, an open green space about the same size as Parliament Hill's front lawn, with walking paths, seating areas and event spaces • Small and large stages for events, concerts and entertainment • Refurbished greenspace around the Aberdeen Pavilion including an extensive seating court • A heritage orchard and civic gardens • Permanent farmers' market space between the Aberdeen Pavilion and relocated Horticulture Building - See more at: http://www.noodls.com/view/2FA99CE6DA95968509CB8FA1F3FD43CE445BCD12#sthash.Jv3411g8.dpuf
Was not a pond not in the plan--and an outdoor screen at the side of the Aberdeen? If so, I guess these are two elements that were scrapped.

Hey--if the city really expected the bids for the park to come in as high as 25 million, and D&G will do it for 16.28 ----perhaps the city can move the 9 million to the Arts Court redevelopment and make up for the money they were hoping the feds would give them?
Reply With Quote
     
     
  #2686  
Old Posted Jul 12, 2013, 12:51 PM
JFFournier JFFournier is offline
Registered User
 
Join Date: Jun 2010
Posts: 405
Quote:
Originally Posted by LeadingEdgeBoomer View Post
J.OT13 wrote
Was not a pond not in the plan--and an outdoor screen at the side of the Aberdeen? If so, I guess these are two elements that were scrapped.
I don't know if it qualifies as a pond, but the beacon feature is in water.

As for screens, I think that was on one of the losing bids. If I recall correctly, the only screen-like structure will be "breaks" in the incline from the front lawn to the stadium (I think that's what that grey L-shaped structure is in the image below).


Last edited by JFFournier; Jul 12, 2013 at 4:08 PM.
Reply With Quote
     
     
  #2687  
Old Posted Jul 12, 2013, 3:43 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
Registered User
 
Join Date: Mar 2010
Posts: 1,375
It is being said that the new Hamilton stadium being built on the old Ivor Wynne site is going to be named Tim Horton's Field. It may be announced later today.
I wonder when the LPP will come up with a stadium sponsor?

I see that this new stadium will hold 22,500 with expansion to 40000 for special events. Not to much different than at Lansdowne.

Also Hamilton's McMaster University has a 6000 seat stadium named Ron Joyce Stadium. Joyce was Tim Horton's partner in founding the donut empire.
Hamilton is definitely Timtown.

I still expect uOttawa to sell naming rights to its field. Right now it is just Gee-Gees Field, but there are no name signs up , pending sale of the rights.
Reply With Quote
     
     
  #2688  
Old Posted Jul 12, 2013, 5:53 PM
nredding nredding is offline
Registered User
 
Join Date: Nov 2009
Posts: 188
Minto have released pricing and floor plans for the townhouses and penthouse at Lansdowne. I'm not impressed with the townhouses. they are basically shoe boxes, long and narrow with windows only at one end.

http://www.minto.com/ottawa/Glebe-new-condos/Rideau/collections.html
Reply With Quote
     
     
  #2689  
Old Posted Jul 13, 2013, 3:56 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Here's a cool shot of the south side stands from Front Page Media Group's twitter account (@FrontPage_Media).

Reply With Quote
     
     
  #2690  
Old Posted Jul 13, 2013, 4:53 AM
Postmaster Postmaster is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 133
I'm getting pretty stoked about this project. I'm looking forward to seeing the Redblacks play and maybe we can get some decent soccer games too. We can at last rejoin the world of cities that have a functional inner-city stadium.
Reply With Quote
     
     
  #2691  
Old Posted Jul 13, 2013, 2:30 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
July 1, 2013

from southfacing
Reply With Quote
     
     
  #2692  
Old Posted Jul 13, 2013, 6:38 PM
MountainView MountainView is offline
Registered User
 
Join Date: Feb 2011
Posts: 2,179
How can anyone NOT be excited about this project! I as well can't wait for it to be completed! And let's not forget the FIFA women's world cup is coming as well as the Redblacks and Fury.
I would love to see outdoor concerts here too! Paul McCartney would be more fun here than at Canadian Tire Centre.
Reply With Quote
     
     
  #2693  
Old Posted Jul 13, 2013, 8:37 PM
citydwlr citydwlr is offline
Registered User
 
Join Date: Mar 2013
Posts: 734
Quote:
Originally Posted by rocketphish View Post
*IMAGE*
That's a great bird's-eye view, @rocketphish! This thing is gonna look awesome once complete! I've been keeping regular tabs on the Ottawa.ca photo gallery too to watch the first-hand progress.

Quote:
Originally Posted by MountainView View Post
How can anyone NOT be excited about this project! I as well can't wait for it to be completed! And let's not forget the FIFA women's world cup is coming as well as the Redblacks and Fury.
I would love to see outdoor concerts here too! Paul McCartney would be more fun here than at Canadian Tire Centre.
The more I see of this going up, the more anxious I am to see this place buzzing. It'll be nice to have an open park there too. It'd be a neat place for free outdoor movie nights (using those inflatable screens) or something ... when games/concerts aren't on, that is. I'm definitely excited to finally see the Fury FC in action. On a related topic, will there also be a women's Fury FC team? (just curious since there's a Fury Women's team and we are holding the Women's FIFA world cup here)
Reply With Quote
     
     
  #2694  
Old Posted Jul 13, 2013, 11:39 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
Quote:
Originally Posted by citydwlr View Post
That's a great bird's-eye view, @rocketphish!
It is an awesome image... but don't thank me, thank Chuck (aka southfacing).
Reply With Quote
     
     
  #2695  
Old Posted Jul 14, 2013, 1:13 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,627
Quote:
Originally Posted by citydwlr View Post
That's a great bird's-eye view, @rocketphish! This thing is gonna look awesome once complete! I've been keeping regular tabs on the Ottawa.ca photo gallery too to watch the first-hand progress.



The more I see of this going up, the more anxious I am to see this place buzzing. It'll be nice to have an open park there too. It'd be a neat place for free outdoor movie nights (using those inflatable screens) or something ... when games/concerts aren't on, that is. I'm definitely excited to finally see the Fury FC in action. On a related topic, will there also be a women's Fury FC team? (just curious since there's a Fury Women's team and we are holding the Women's FIFA world cup here)
The Ottawa Fury women have been playing for years. They are a very successful semipro women's club.
http://en.wikipedia.org/wiki/Ottawa_Fury_Women
Reply With Quote
     
     
  #2696  
Old Posted Jul 14, 2013, 7:28 PM
JackBauer24 JackBauer24 is offline
Registered User
 
Join Date: Nov 2010
Posts: 748
Quote:
Originally Posted by O-Town Hockey View Post
The Ottawa Fury women have been playing for years. They are a very successful semipro women's club.
http://en.wikipedia.org/wiki/Ottawa_Fury_Women
Can the womens Ottawa Fury mgmt run the Mens side as well? Heck, even the Mens national team too? They have a very well run organization.
Reply With Quote
     
     
  #2697  
Old Posted Jul 15, 2013, 12:24 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
Wow, I just spotted this article...is John Martin a friend of Nigel Wright or Steve Harper?

Quote:
Lansdowne litigant’s legal fees paid off anonymously

By David Reevely, OTTAWA CITIZEN July 11, 2013


OTTAWA — An anonymous donor has paid off thousands of dollars in costs racked up by John Martin through his legal actions attempting to stop the redevelopment of Lansdowne Park, the city’s chief lawyer told city councillors in a memo Thursday.

Martin, a Glebe resident who had his own smaller-scale concept for renovating the fairground, tried to get the courts to stop the city’s sole-sourced deal with the Ottawa Sports and Entertainment Group but lost at every stage. Along the way, a series of judges ordered him to pay chunks of the city’s legal bills, a measure typically used to keep people from filing frivolous or quixotic lawsuits.

By the end, after the Supreme Court of Canada refused to hear Martin’s arguments, he owed $12,655.58 and showed no sign of paying it, city solicitor Rick O’Connor’s memo said.

“However, I can advise that the City has been provided with payment of the full amount of the outstanding legal costs owing by Mr. Martin. This payment was received from a benefactor on behalf of Mr. Martin. This individual has advised that they wish to remain anonymous,” he wrote. “In light of this payment, Legal Services now considers the matter to be closed.”

Martin’s case was separate from the one pursued by the Friends of Lansdowne Park. He waited until after the Friends gave up their legal challenges before filing his own, a decision the Ontario Divisional Court ruled was an abuse of the legal process.

[email protected]

ottawacitizen.com/greaterottawa
© Copyright (c) The Ottawa Citizen

http://www.ottawacitizen.com/Lansdowne+litigant+legal+fees+paid+anonymously/8647756/story.html
Reply With Quote
     
     
  #2698  
Old Posted Jul 15, 2013, 12:28 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
So I've heard. It would be one thing to pay FOL's fees, since they were the more legit group, fighting for a fair process as opposed to a deadbeat looking for his moment in the sun and a quick buck.
Reply With Quote
     
     
  #2699  
Old Posted Jul 15, 2013, 8:27 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Reply With Quote
     
     
  #2700  
Old Posted Jul 16, 2013, 12:41 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Nice to see progress after such a bumpy ride to this point.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:04 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.