Thought I`d post an update on some projects in Winnipeg I pass by on my drive home.
300 Assiniboine is moving on up!

___________________________________________________________________________________________________________________________________________________
dCondo has what looks to be about 3 or 4 caissons is the ground. (Sorry for lack of photos)
___________________________________________________________________________________________________________________________________________________
Convention Centre Expansion site is still a parking lot.
Quote:
Originally Posted by Jack1983
Courtesy of Chrisd.ca
@ChrisDca
Winnipeg Convention Centre to announce a major development in its expansion process next Tuesday.
|
Seems to me it will be one of three things:
1. Construction is actually going to start!
2. Hotel component will be announced.
3. Naming rights to the facility have been finalized.
___________________________________________________________________________________________________________________________________________________
The crawler crane at CentrePoint`s days are numbered. Construction is progressing on the 3rd storey adjacent to the Mitchell Copp facade, with the rest of the 5 storey podium topped up at the back of the site. The crane`s painted themselves into a small corner!
Or will it move to the street to complete the podium?
___________________________________________________________________________________________________________________________________________________
Project W site is now empty of equipment, site fence remains. As we all heard, could go ahead as early as August. This site and dCondo are at a very similar state. Geotechnical testing completed(or soon will be) with construction raring to go.
___________________________________________________________________________________________________________________________________________________
Disraeli Bridges project is nearing full completion. Crews are working on finishing the MSE walls and pedestrian access to the bridge. Most of the street work is now completed on the north side. With some work remaining on Hespler. South side was complete last year.
The AT bridge is also moving along. I think it spans the river now, but still a ways from being completed. But Looks like the rest of the old bridge is slowly coming down. At least half way across the river now, and then it`s only girders left for the next span.
Again sorry for lack of photos.