HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #981  
Old Posted Jun 5, 2013, 1:19 AM
Boisebro's Avatar
Boisebro Boisebro is offline
 
Join Date: Apr 2005
Posts: 3,663
glass is getting close to topping out. wonder if the spire will be added last or if we'll see it added before the facade is done.
Reply With Quote
     
     
  #982  
Old Posted Jun 6, 2013, 4:58 AM
Sawtooth's Avatar
Sawtooth Sawtooth is offline
 
Join Date: Mar 2006
Posts: 4,499
































Last edited by Sawtooth; Jun 6, 2013 at 5:08 AM.
Reply With Quote
     
     
  #983  
Old Posted Jun 9, 2013, 9:04 PM
Sawtooth's Avatar
Sawtooth Sawtooth is offline
 
Join Date: Mar 2006
Posts: 4,499
Sunday afternoons in DT Boise = wine, beer, mimosas, food and fine people

and sweaty — from the bike ride home lol.




















































































































Reply With Quote
     
     
  #984  
Old Posted Jun 9, 2013, 11:25 PM
Boisebro's Avatar
Boisebro Boisebro is offline
 
Join Date: Apr 2005
Posts: 3,663
nice shots!

i'm gonna borrow some of your buttsweaty images for the construction thread. it's been awhile since it was updated. hope you don't mind.
Reply With Quote
     
     
  #985  
Old Posted Jun 10, 2013, 1:55 PM
Boisebro's Avatar
Boisebro Boisebro is offline
 
Join Date: Apr 2005
Posts: 3,663
they're starting on the spire today!

Reply With Quote
     
     
  #986  
Old Posted Jun 10, 2013, 3:44 PM
Architecture Buff Architecture Buff is offline
 
Join Date: Sep 2012
Posts: 872
8th&Main Tower

June 10,2013
Pic from cam showing spire:

Reply With Quote
     
     
  #987  
Old Posted Jun 11, 2013, 3:40 AM
Evo5Boise's Avatar
Evo5Boise Evo5Boise is offline
 
Join Date: Aug 2006
Posts: 1,448
Awesome!! Man, what a beautiful building.
Reply With Quote
     
     
  #988  
Old Posted Jun 11, 2013, 7:11 AM
BoiseAirport BoiseAirport is offline
 
Join Date: Jun 2005
Posts: 2,225
So I was wrong on the top mechanical floor. Looks like it wasn't redesigned.

Wow, that glass is just so beautiful reflecting that golden-blue light on a clear summer morning. With each day of progress this building just gets more and more impressive!
Reply With Quote
     
     
  #989  
Old Posted Jun 12, 2013, 7:19 PM
Cottonwood Cottonwood is offline
 
Join Date: Feb 2005
Posts: 4,500
I love that last photo of the capitol dome.
Reply With Quote
     
     
  #990  
Old Posted Jun 13, 2013, 1:02 AM
Architecture Buff Architecture Buff is offline
 
Join Date: Sep 2012
Posts: 872
8th&Main Tower

Pics from June 12,2013:















Reply With Quote
     
     
  #991  
Old Posted Jun 13, 2013, 1:28 AM
Architecture Buff Architecture Buff is offline
 
Join Date: Sep 2012
Posts: 872
The Hole/8th&Main Tower

2012 pic and 2013


Oct 26,2012

June12,2013
Reply With Quote
     
     
  #992  
Old Posted Jun 15, 2013, 9:24 PM
Sawtooth's Avatar
Sawtooth Sawtooth is offline
 
Join Date: Mar 2006
Posts: 4,499
quad shot iced latte



















































Reply With Quote
     
     
  #993  
Old Posted Jun 17, 2013, 3:18 PM
Boisebro's Avatar
Boisebro Boisebro is offline
 
Join Date: Apr 2005
Posts: 3,663
i'm guessing that by the end of july the cladding will be just about done, with the exception of the areas around the service elevator and crane.

i'm excited to see the lower floors finished to see what it'll look like from street level. renderings are one thing, but seeing it in reality is another.
Reply With Quote
     
     
  #994  
Old Posted Jun 18, 2013, 7:16 PM
Cottonwood Cottonwood is offline
 
Join Date: Feb 2005
Posts: 4,500
Looking good.
Reply With Quote
     
     
  #995  
Old Posted Jun 20, 2013, 7:52 PM
Architecture Buff Architecture Buff is offline
 
Join Date: Sep 2012
Posts: 872
8th&Main Tower

Video of first section of air handler being lifted to roof. Thursday June 20,2013.

http://youtu.be/NiJGXa14jhI

Last edited by Architecture Buff; Jun 21, 2013 at 12:27 AM.
Reply With Quote
     
     
  #996  
Old Posted Jun 20, 2013, 8:03 PM
Architecture Buff Architecture Buff is offline
 
Join Date: Sep 2012
Posts: 872
Air Handler 8th&Main Tower 6-20-2013

Air Handler:








Last edited by Architecture Buff; Jun 21, 2013 at 12:26 AM.
Reply With Quote
     
     
  #997  
Old Posted Jun 21, 2013, 12:48 AM
Sawtooth's Avatar
Sawtooth Sawtooth is offline
 
Join Date: Mar 2006
Posts: 4,499
Cool pictures Architecture Buff






Zooming in from Warm Springs Ave above Warm Springs Golf Course. The Zoom funked with the hue of the sky and I did not realize this until I was home and uploaded the photos. errrrr. I will be out that way again in a few days and will redeem myself. What about a SSP meet at the golf course?





















No Zoom and perfect hue. US Bank and 8th and Main are to the right of center below the big, blue, beautiful Boise sky. Of course there are trees in the way










mixing up the Effect


Last edited by Sawtooth; Jun 21, 2013 at 1:32 AM.
Reply With Quote
     
     
  #998  
Old Posted Jun 23, 2013, 4:13 AM
Hawk's Avatar
Hawk Hawk is offline
 
Join Date: Sep 2011
Posts: 652
She's a beauty guys! :D



I do sort of wish that the spire was just a tad bit larger then it currently is though.
Reply With Quote
     
     
  #999  
Old Posted Jun 23, 2013, 2:22 PM
Boisebro's Avatar
Boisebro Boisebro is offline
 
Join Date: Apr 2005
Posts: 3,663
nice shot.

i think the spire will be fine once the final piece is put in and the cladding goes on. it's definitely a huge improvement from the previous spire, which was incredibly tiny.
Reply With Quote
     
     
  #1000  
Old Posted Jun 24, 2013, 8:44 PM
Cottonwood Cottonwood is offline
 
Join Date: Feb 2005
Posts: 4,500
The remainder of the article is at the link.


http://www.boiseweekly.com/CityDesk/arch...h-difference-of-opinion-with-ruths-chris

CCDC Considers '16-Inch Difference of Opinion' With Ruth's Chris

Posted by George Prentice on Tue, Jun 11, 2013 at 11:15 AM


It was all about 16 inches.

One of the longer discussions to mark the June 10 meeting of the Capital City Development Corporation concerned a unique request from the soon-to-be Ruth's Chris steakhouse restaurant, one of the ground floor tenants of the Eighth and Main Tower, which is still under construction.

Ruth's Chris has designs to include sidewalk dining through its alcove facing Eighth Street, but it wants to stretch that dining area onto the sidewalk. The problem is that the Eighth and Main building is 10-feet further east than any of the buildings on the west side of Eighth, effectively leaving less than 4-feet of usable patio space.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 7:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.