Quote:
Originally Posted by andasen View Post
Interesting Report Coming to T&T Meeting next week

Summary of Cost-Benet Analysis for 10-year Rapid Transit Corridors

Report Determines Bang for the Buck on 8 different factors normalized by capitol cost per rider (2019): Operating Cost, Transit Time Savings, Auto Time Savings, Transit Service Area, Support for TOD Development, Support for Asset Management, Environmental Benefit, Socio-economic Benefit.

Rank of Rapid Transit Corridors

Centre Street - 1
South West Transitway - 2
South Cross Town - 3
17th Ave SE Transit Way - 4
North Cross Town - 5
South East Transit Way - tied for 6th
West Campus Mobility - Tied for 6th

Going to be interesting the affects of this report.
Interesting report. Thanks for posting! This has been a good reminder of how far money could go to improve crosstown and 17th ave SE commutes relative to the SELRT. Here are my initial critiques of methodology:

1) In scoring, each of their 8 criteria are weighted equally, although surely certain criteria are more relevant than others. One downside of doing it this way is that the same benefits are counted multiple times to rack up score. For example, population density is related to density of youth, seniors, and low-income citizens. Job density is essentially counted twice too. A candidate project that would rank highly gets to double it's score in this way. This is often a problem with ordinal scoring.

2) Every criteria is divided by capital cost per rider. This is fine, except projected capital cost and projected ridership are independently difficult to predict. Margins of error are likely around 50% of data value for each, and when you compound this and then use this value for every criteria, there is potential for huge mistakes. The rank of projects could be completely different if capital cost per rider prediction is incorrect.

3) Other data values and ordinal cutoffs are difficult to justify. For example, in total emission reduction in kg (which is already difficult to predict with any accuracy), 75 500 scores a 3, but 71 900 scores a 2.

4) Why does a higher future expense (Cost of programmed or anticipated 10- year lifecycle improvements divided by capital cost per rider) earn a candidate more points?

Overall, I like how this report was done. A more detailed/transparent methodology and/or citations to where the number come from would help. Please, routeahead, get better at this! Also, bang per buck is important, but it shouldn't necessarily be the only consideration. Should we give the most funding to schools that perform better? Should we build more parks in areas where parks are most utilized? Should we open a banana stand on the part of the boardwalk that is known to already sell the most frozen bananas? Different questions, I know, but I hope you get my point.
     
     
  #6302  
Old Posted Jun 15, 2013, 2:17 AM
93JC 93JC is offline
Registered User
 
Join Date: Jul 2006
Posts: 929
Quote:
Originally Posted by Radley77 View Post
Does anyone know if a new request for proposal has been sent out for the Calgary Transit electronic fare collection system (Connect)?
Coincidentally I was just thinking about that.

(I haven't heard anything.)
     
     
  #6303  
Old Posted Jun 15, 2013, 4:03 PM
Allan83 Allan83 is offline
BANNED
 
Join Date: Nov 2012
Location: Calgary
Posts: 1,410
Quote:
Originally Posted by andasen View Post
Interesting Report Coming to T&T Meeting next week

Summary of Cost-Benet Analysis for 10-year Rapid Transit Corridors

Report Determines Bang for the Buck on 8 different factors normalized by capitol cost per rider (2019): Operating Cost, Transit Time Savings, Auto Time Savings, Transit Service Area, Support for TOD Development, Support for Asset Management, Environmental Benefit, Socio-economic Benefit.

Rank of Rapid Transit Corridors

Centre Street - 1
South West Transitway - 2
South Cross Town - 3
17th Ave SE Transit Way - 4
North Cross Town - 5
South East Transit Way - tied for 6th
West Campus Mobility - Tied for 6th

Going to be interesting the affects of this report.
Lots of interesting information there, but I don’t agree with the final rankings at all. The Setway area will see an increase of about 125,000 jobs and residents, far more than any of the other proposals, and yet they’re only predicting a relatively modest increase in ridership? The travel time to Quarry Park would also be cut by 13 minutes per trip! That’s almost a half hour per day for commuters. How much is that time worth in terms of productivity, and just overall value to the commuters? I take the 302 down to the Glenmore Inn a few times a year and I can say first hand that it is a dreadful ride. It has the dubious distinction of being able to both rattle your fillings loose and make you seasick, as it bobs and weaves and thumps and bangs through mostly a dingy industrial neighbourhood. Putting in the setway would greatly transform that ride and open up that whole area, imo. It would be easy and to live in East Village and work in Quarry Park, or CP’s Ogden yards, or even farther south. I think ridership overall would spike and I think development along the line would be greatly accelerated, and I don’t see that reflected in these rankings.
     
     
  #6304  
Old Posted Jun 16, 2013, 2:42 AM
andasen andasen is offline
Registered User
 
Join Date: Feb 2012
Location: Calgary
Posts: 227
Quote:
Originally Posted by Allan83 View Post
Lots of interesting information there, but I don’t agree with the final rankings at all. The Setway area will see an increase of about 125,000 jobs and residents, far more than any of the other proposals, and yet they’re only predicting a relatively modest increase in ridership? The travel time to Quarry Park would also be cut by 13 minutes per trip! That’s almost a half hour per day for commuters. How much is that time worth in terms of productivity, and just overall value to the commuters? I take the 302 down to the Glenmore Inn a few times a year and I can say first hand that it is a dreadful ride. It has the dubious distinction of being able to both rattle your fillings loose and make you seasick, as it bobs and weaves and thumps and bangs through mostly a dingy industrial neighbourhood. Putting in the setway would greatly transform that ride and open up that whole area, imo. It would be easy and to live in East Village and work in Quarry Park, or CP’s Ogden yards, or even farther south. I think ridership overall would spike and I think development along the line would be greatly accelerated, and I don’t see that reflected in these rankings.
Yes it increases the most but the purpose of the report is to contextualize these numbers to that comparisons are possible. SETWAY is such a major undertaking that has the potential to have major change but from the city wide perspective is it enough to justify spending big money to get big results or to spend on a spectrum of items to create a spectrum of results. Just as you could have people living in east village commuting to Quarry Park you could just as easily having people from the CFB-Currie redevelopment catching the S cross town to work in Quarry Park.

I am starting to come to the opinion that SE residents are going to have to absorb some additional cost burden above and beyond what they pay as regular tax payers in order to get the SETWAY built in any useful timeframe in order to be equitable to the rest of the city. The equivalent cost of building between Inglewood and Ogden stations will probably have to be mostly absorbed by the SE rather than the city as a whole to make the project's costs more comparable with other lines in the city. Especially if we want to build out to Seton.

Ultimately, some innovation will need to happen.
     
     
  #6305  
Old Posted Jun 16, 2013, 3:06 AM
ByeByeBaby's Avatar
ByeByeBaby ByeByeBaby is offline
Crunchin' the numbers.
 
Join Date: Mar 2009
Location: T2R, YYC, 403, CA-AB.
Posts: 791
Quote:
Originally Posted by Allan83 View Post
Lots of interesting information there, but I don’t agree with the final rankings at all. The Setway area will see an increase of about 125,000 jobs and residents, far more than any of the other proposals, and yet they’re only predicting a relatively modest increase in ridership? The travel time to Quarry Park would also be cut by 13 minutes per trip! That’s almost a half hour per day for commuters. How much is that time worth in terms of productivity, and just overall value to the commuters? I take the 302 down to the Glenmore Inn a few times a year and I can say first hand that it is a dreadful ride. It has the dubious distinction of being able to both rattle your fillings loose and make you seasick, as it bobs and weaves and thumps and bangs through mostly a dingy industrial neighbourhood. Putting in the setway would greatly transform that ride and open up that whole area, imo. It would be easy and to live in East Village and work in Quarry Park, or CP’s Ogden yards, or even farther south. I think ridership overall would spike and I think development along the line would be greatly accelerated, and I don’t see that reflected in these rankings.
If I was writing this report, I would probably not have used these specific metrics in this specific way, but numerical metrics are useful and these do make some sense. They specifically account for development along the line ("TOD" = Transit Oriented Development) and five of the eight metrics use overall ridership. The reduced travel time is also specifically accounted for. So yes, every single one of the benefits you talk about are present in these rankings.

The SE has a huge amount of job growth, but most of that is in the industrial area. Which is a long way away from the SETWAY and has such low density it is always going to be difficult to service by transit. Some of the industrial job growth is further away from the SETWAY than the industrial growth north of the airport is from the NC corridor, yet the latter is not counted as being in the NC corridor (nor should it be).

There are two employment nodes in the SE worth talking about; actually one, the south Hospital/Seton area. (The first phase of the SETWAY would only go to Douglas Glen, so Seton won't have it's transit accessibility change by much.) But people won't shut up about Quarry Park, which is a small office park with around 5,000 jobs in five-story and shorter buildings. It's nice to see some denser development with mixes of use, but it's denser compared to the warehouses elsewhere in the SE; if all the buildings were stacked up and built downtown, it still wouldn't be the tallest building. (The Bow has the same amount of floorspace as all of Quarry Park. If people were talking about servicing The Bow with dedicated transit, they would be just as .)

Fundamentally, the SE is a hard market to serve with transit. You have Inglewood/Ramsay, who are just as likely to walk or bike to downtown and who don't gain much travel time savings since they're so close. Then you have a huge industrial area, which won't get much transit ridership. (Go to 39th Avenue and Franklin one morning, and count all the people getting off to walk into the industrial areas. You will not need two hands.) Then Ogden/Riverbend/Quarry Park, which are nice places, but are small communities and won't generate much ridership. Then more industrial areas, then finally the growing residential communities -- except that they are so much closer to the jobs in the industrial area that they are less likely to commute to downtown.

You may question the ridership, but you're the one suggesting that people are raring to buy expensive properties in the East Village, within walking distance of 125,000 jobs, just to commute for half an hour by transit to the 5,000 jobs in Quarry Park.
     
     
  #6306  
Old Posted Jun 17, 2013, 3:33 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Markusoff on transit ranking report:
http://www.calgaryherald.com/news/calgar...nks+last+cost+benefit/8533922/story.html

It's interesting what could be done with $52M:
-North Crosstown BRT: $50M
-SW Transitway: $40M
-South Crosstown BRT: $20M
-West Campus Mobility: :$30M
-(Centre Street Transitway $120M, 17th Ave SE Transitway $98M, SE Transitway $642M)

Maybe we give funding priority the bottlenecks that affect several projects. For example, create a ROW out of SE downtown and through Inglewood to serve future SETWAY as well as 17th Ave SE transitway. Or, 14th St SW to MRU ROW to serve both the Southwest Transitway and the South Crosstown route.

I'm hesitant about the funding the Centre Street Transitway because (1) it is one of the most expensive projects, and (2) the worst bottleneck is across the bridge and bus infrastructure here will never be upgraded to an LRT. Perhaps there are other segments that could be upgraded further north that would both reduce current travel times and reserve space for future LRT upgrades.

It sounds as though $52M might be enough to create ROWs in all three of these locations, potentially benefiting 5-6 of the 7 routes identified:
-Downtown-Inglewood ROW
-MRU-14th St ROW
-improved ROW at some Centre Street or 16th Ave N bottlenecks.
     
     
  #6307  
Old Posted Jun 17, 2013, 3:43 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,629
$52 million a year buys just short of a billion dollars worth of debt.
     
     
  #6308  
Old Posted Jun 17, 2013, 3:59 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by MalcolmTucker View Post
$52 million a year buys just short of a billion dollars worth of debt.
Buying debt is great when what you're getting will produce surplus positive cash-flow such as to make it worth-while (such as in East Village). When it comes to public transit, I agree it needs to be in play, but the formula can't be the same.

My personal preference would be on doing something that can help the centre street corridor, as with NCLRT start being 15 years away and the corridor already close to maxed, there will need to be some relief for this area's transit loving folks.
     
     
  #6309  
Old Posted Jun 17, 2013, 6:42 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Noticed on Saturday the first of the two pedestrian bridges for Tuscany station is being assembled just west of the station in the median. Installation is June 26/27 for both sides (eastbound on the 26th, westbound on the 27th. This does involve closure of that direction of Crowchild overnight. The station itself is coming together quite nicely, it actually looks odd that the bridges aren't up yet considering how far along the station is.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #6310  
Old Posted Jun 17, 2013, 7:09 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,750
SB Stoney to WB Crowchild is closed June 27th from 10pm to 5am. But I believe that Crowchild itself will still be open, although they might close the road for a few minutes in the dead of night.
     
     
  #6311  
Old Posted Jun 17, 2013, 9:37 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by Cage View Post
SB Stoney to WB Crowchild is closed June 27th from 10pm to 5am. But I believe that Crowchild itself will still be open, although they might close the road for a few minutes in the dead of night.
Nope, full closure.

http://www.calgary.ca/Transportation/TI/Documents/Transit-projects/nw-lrt-crowchild-closure.pdf
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #6312  
Old Posted Jun 17, 2013, 9:54 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Well, it's good to see the detour running through RRRO rather than my neighborhood (Tuscany). Tuscany children must be more important or something.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #6313  
Old Posted Jun 18, 2013, 2:49 PM
Bender77 Bender77 is offline
Registered User
 
Join Date: Oct 2008
Posts: 26
Quote:
Originally Posted by 93JC View Post
Coincidentally I was just thinking about that.

(I haven't heard anything.)
I haven't seen anything either. But this was on the cbc webpage today: http://www.cbc.ca/news/canada/calgary/st...y-blog-scott-dippel-connect-card-ch.html
     
     
  #6314  
Old Posted Jun 18, 2013, 3:39 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,750
Thanks for the update mersar.

I got my information from the monochrome signs on both Crowchild and Stoney. My interpretation was the closure was only for the WB ramp as stated in my post above. Additionally the road signs made no mention of a closure on June 26th, but there is a possibility of signage on EB side before 12 mile coulee rd.
     
     
  #6315  
Old Posted Jun 19, 2013, 4:07 AM
RicoLance21's Avatar
RicoLance21 RicoLance21 is offline
Bring buildings to life
 
Join Date: Mar 2005
Location: Windsor Park, Calgary
Posts: 2,463
Transit news from our neighbours to the north:

http://metronews.ca/news/edmonton/711406...out-first-phase-of-smart-bus-technology/

There will also be stop announcements and signage. I am looking at you, Calgary Transit. Where are you on this?
__________________
Calgary: more than just a redneck city...much more. Just ask the mayor.
     
     
  #6316  
Old Posted Jun 19, 2013, 4:53 AM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by RicoLance21 View Post
Transit news from our neighbours to the north:

http://metronews.ca/news/edmonton/711406...out-first-phase-of-smart-bus-technology/

There will also be stop announcements and signage. I am looking at you, Calgary Transit. Where are you on this?
It's been in the works for a couple of years. Starts this fall. With every bus equipped by early 2014. Includes real time tracking and bus times.
     
     
  #6317  
Old Posted Jun 19, 2013, 6:29 AM
Allan83 Allan83 is offline
BANNED
 
Join Date: Nov 2012
Location: Calgary
Posts: 1,410
Quote:
Originally Posted by ByeByeBaby View Post
If I was writing this report, I would probably not have used these specific metrics in this specific way, but numerical metrics are useful and these do make some sense. They specifically account for development along the line ("TOD" = Transit Oriented Development) and five of the eight metrics use overall ridership. The reduced travel time is also specifically accounted for. So yes, every single one of the benefits you talk about are present in these rankings.

The SE has a huge amount of job growth, but most of that is in the industrial area. Which is a long way away from the SETWAY and has such low density it is always going to be difficult to service by transit. Some of the industrial job growth is further away from the SETWAY than the industrial growth north of the airport is from the NC corridor, yet the latter is not counted as being in the NC corridor (nor should it be).

There are two employment nodes in the SE worth talking about; actually one, the south Hospital/Seton area. (The first phase of the SETWAY would only go to Douglas Glen, so Seton won't have it's transit accessibility change by much.) But people won't shut up about Quarry Park, which is a small office park with around 5,000 jobs in five-story and shorter buildings. It's nice to see some denser development with mixes of use, but it's denser compared to the warehouses elsewhere in the SE; if all the buildings were stacked up and built downtown, it still wouldn't be the tallest building. (The Bow has the same amount of floorspace as all of Quarry Park. If people were talking about servicing The Bow with dedicated transit, they would be just as .)

Fundamentally, the SE is a hard market to serve with transit. You have Inglewood/Ramsay, who are just as likely to walk or bike to downtown and who don't gain much travel time savings since they're so close. Then you have a huge industrial area, which won't get much transit ridership. (Go to 39th Avenue and Franklin one morning, and count all the people getting off to walk into the industrial areas. You will not need two hands.) Then Ogden/Riverbend/Quarry Park, which are nice places, but are small communities and won't generate much ridership. Then more industrial areas, then finally the growing residential communities -- except that they are so much closer to the jobs in the industrial area that they are less likely to commute to downtown.

You may question the ridership, but you're the one suggesting that people are raring to buy expensive properties in the East Village, within walking distance of 125,000 jobs, just to commute for half an hour by transit to the 5,000 jobs in Quarry Park.
Oh, I think there is some very valuable information here, on the whole, but I think they’re very incomplete and not something you could base any kind of overall ranking on. Just to quickly underline how nonsensical the rankings are, if any one of the proposals ranked ahead of the SETWAY would have had a time saving of 0 they still would have ranked ahead of the SETWAY. Talk about screwed up priorities. As it is the 17th Ave Transitway only lists a time savings of 3 minutes, and it ranked ahead of the SETWAY.

I also don’t think this takes into account the potential impact of the SETWAY. Wouldn’t you say that Quarry Park has the potential to become much denser, including both residential and commercial developments? And if we want it to become a TOD then we need to put in the appropriate level of public transit first, don’t we? And what about CP's new head office in its Ogden Yards? There seems to be some other development going on there as well. What about the Crossroads Market area? What about the Glenmore Inn area? Even if none of these areas developed into a full blown TODs I suspect that the impact of increased development around all of these hubs combined would be significant. Keep in mind that the SETWAY would cut transit time almost in half, and it would transform the ride experience from what must be one of the worst bus rides in the city to the best. I think the difference the SETWAY would make to that area would be huge.

As another example, you mentioned that many of the other jobs are further away from the line, but the huge time savings offered by the SETWAY would surly cause the city to redo many of its routes to take advantage of it, don’t you think? If you were traveling from downtown to Seton I would bet the SETWAY would be part of the quickest route. I’m sure the QP/Douglas Glen terminus would become a transfer point for a significant number of the buses in the SE, in fact. There is literally a maze of railways, freeways, and a sizable river between QP and downtown. A dedicated roadway like this would cut right through all of that and take you right downtown. Beautiful. If there was enough volume you might even be able to run express busses directly from QP to downtown non-stop. A smooth dedicated roadway with superelevation and a higher design speed in many parts, and you’d never stuck in traffic, and you’d have very few lights. Zoom! That might be only 10 minute trip. How would that change things for QP and the SE in general?

The East Village example was just an example, but it was in response to the comments here that IOL would have trouble retaining employees who would prefer to be downtown. With its almost half hour per day reduced commute time I think the SETWAY would change that picture quite a bit. If I've got the numbers right, with 13 minute time savings it would only be about a 15 minute trip one way, and maybe only 10 if there was an express bus.

There are other very odd things about that analysis as well. The most disappointing finding for me was that the 17 Ave. SE transitway would only reduce the one way time by 3 minutes. Pretty clearly that’s not worth doing. The proposal for the South Crosstown BRT also seems odd, give that there is already a BRT from Westbrook to Heritage. What does the cost for this proposal represent, then? Does it just cover the leg between QP and Heritage? Is that also where all the time savings come from? Without the specifics it’s very hard to evaluate this option. I’m sure very few people would take the BRT from Westbrook to QP, as it would almost certainly be quicker to take the train downtown, and then take the SETWAY to QP. The nonsensical rankings aside, however, there is lots of interesting information there, even if it is incomplete.

Last edited by Allan83; Jun 19, 2013 at 7:04 AM.
     
     
  #6318  
Old Posted Jun 19, 2013, 3:01 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Allan83 View Post
I also don’t think this takes into account the potential impact of the SETWAY. Wouldn’t you say that Quarry Park has the potential to become much denser, including both residential and commercial developments? And if we want it to become a TOD then we need to put in the appropriate level of public transit first, don’t we?
Quarry Park is adjacent to a landfill and the phospho-gypsum stacks for Western Cooperatives Fertilizer. All the residential (and schools, hospitals and any food establishments including grocery stores etc) that could be built, has. Ever notice the 3-4 vacant lots on the NE corner of Douglasdale? Those are because the parcels are too close to the landfill. Office and industrial development is possible around the station, maybe 30-40 years from now.

Also, want to know a fun fact? The proposed location for the Quarry Park LRT station is on the current landfill property. Granted it is a dry waste landfill, but landfill doesn't scream TOD to me.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #6319  
Old Posted Jun 19, 2013, 3:11 PM
SquattingBear's Avatar
SquattingBear SquattingBear is offline
Registered User
 
Join Date: Oct 2012
Location: Beltline, Calgary, AB
Posts: 118
Cool project for electric busses in Switzerland:
Would be lovely to have an electric bus system that didn't rely on overhead lines.

Flash Charging Electric Bus System
__________________
Proud supporter of Naheed Nenshi as Mayor!
My Flickr
     
     
  #6320  
Old Posted Jun 19, 2013, 3:19 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Allan83 View Post
Oh, I think there is some very valuable information here, on the whole, but I think they’re very incomplete and not something you could base any kind of overall ranking on. Just to quickly underline how nonsensical the rankings are, if any one of the proposals ranked ahead of the SETWAY would have had a time saving of 0 they still would have ranked ahead of the SETWAY. Talk about screwed up priorities. As it is the 17th Ave Transitway only lists a time savings of 3 minutes, and it ranked ahead of the SETWAY.

I also don’t think this takes into account the potential impact of the SETWAY. Wouldn’t you say that Quarry Park has the potential to become much denser, including both residential and commercial developments? And if we want it to become a TOD then we need to put in the appropriate level of public transit first, don’t we? And what about CP's new head office in its Ogden Yards? There seems to be some other development going on there as well. What about the Crossroads Market area? What about the Glenmore Inn area? Even if none of these areas developed into a full blown TODs I suspect that the impact of increased development around all of these hubs combined would be significant. Keep in mind that the SETWAY would cut transit time almost in half, and it would transform the ride experience from what must be one of the worst bus rides in the city to the best. I think the difference the SETWAY would make to that area would be huge.

As another example, you mentioned that many of the other jobs are further away from the line, but the huge time savings offered by the SETWAY would surly cause the city to redo many of its routes to take advantage of it, don’t you think? If you were traveling from downtown to Seton I would bet the SETWAY would be part of the quickest route. I’m sure the QP/Douglas Glen terminus would become a transfer point for a significant number of the buses in the SE, in fact. There is literally a maze of railways, freeways, and a sizable river between QP and downtown. A dedicated roadway like this would cut right through all of that and take you right downtown. Beautiful. If there was enough volume you might even be able to run express busses directly from QP to downtown non-stop. A smooth dedicated roadway with superelevation and a higher design speed in many parts, and you’d never stuck in traffic, and you’d have very few lights. Zoom! That might be only 10 minute trip. How would that change things for QP and the SE in general?

The East Village example was just an example, but it was in response to the comments here that IOL would have trouble retaining employees who would prefer to be downtown. With its almost half hour per day reduced commute time I think the SETWAY would change that picture quite a bit. If I've got the numbers right, with 13 minute time savings it would only be about a 15 minute trip one way, and maybe only 10 if there was an express bus.

There are other very odd things about that analysis as well. The most disappointing finding for me was that the 17 Ave. SE transitway would only reduce the one way time by 3 minutes. Pretty clearly that’s not worth doing. The proposal for the South Crosstown BRT also seems odd, give that there is already a BRT from Westbrook to Heritage. What does the cost for this proposal represent, then? Does it just cover the leg between QP and Heritage? Is that also where all the time savings come from? Without the specifics it’s very hard to evaluate this option. I’m sure very few people would take the BRT from Westbrook to QP, as it would almost certainly be quicker to take the train downtown, and then take the SETWAY to QP. The nonsensical rankings aside, however, there is lots of interesting information there, even if it is incomplete.
Just as a counterpoint take the north crosstown route. It connects the Research Park, UofC, Alberta Children's Hospital, Foothills Hospital, SAIT and Peter Lougheed Centre. Three hospitals and two post secondary institutions. Plus it runs along 16th avenue and through fairly dense residential neighbourhoods.

And no offence, but the potential for redevelopment along the SE line is pretty dismal:

Crossroads Market- Pretty much no potential for redevelopment. Industrial land, especially inner city industrial land, in Calgary is at an absolute premium, and there is very little chance these properties will redevelop.
Highfield All industrial.
Lynnwood station: located on a former refinery, so very little potential for development there for some time.
Ogden- Some residential densification and the CP office here.
South Hill- Located beside the Glenmore overpass and fairly close to the former Ogden landfill.
Quarry Park- Landfill and fertilizer stacks- 450m setbacks from both IIRC
Douglasglen- Also really close to the fertilizer stacks. Very little potential for residential development.
48th Street- Guess what? Fertilizer stacks!!!!
Prestwick- Finally some potential for more development. Only had to travel 17km to get here too!


PS- The crosstown BRT is the BRT from Westbrook to Heritage (and on to Quarry Park).
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.