Old Posted May 21, 2013, 2:53 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,917
Quote:
Originally Posted by CoryB View Post
I keep saying that it will be an expansion of the Hydro substation and don't think anything there will change. Hydro previously announced a plan to expand their substation on King St and had those plans derailed by public outcry. Based on the NIMBY that has happened there they are likely keeping the plans for the Gio's site extremely quiet. Sure it is not a sexy new building like some of the other projects but it is the sort of infrastructure piece that enables these projects to happen.
Hydro plans to build their new substation (replacing King St) on the SE corner of Notre Dame and Hargrave. I do believe they want to expand their Garry and York substation as well.


.....i edited this post to correctly show site
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York

Last edited by Biff; May 21, 2013 at 4:45 PM.
     
     
  #8962  
Old Posted May 21, 2013, 3:56 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,192
Quote:
Originally Posted by Biff View Post
Hydro plans to build their new substation (replacing King St) on the SE corner of Notre Dame and Princess. I do believe they want to expand their Garry and York substation as well.
Are they planning to demolish a building at Notre Dame and Princess? That is the site that got them in all sorts of hot water for wanting to essentially gut the buildings between King and Princess along McDermot. I thought they since backed away from those plans.


As for the Garry and York substation, it is to the east of the Gio's site across a backlane. The city has a history of closing lanes in the downtown if it suits a development, ie CentrePoint, so that would seem to not be a barrier. It seems a little odd to me that the Gio's site was reported as being sold yet there is really no public information on who bought it or what their plans are for the site.
     
     
  #8963  
Old Posted May 21, 2013, 4:04 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Biff View Post
Hydro plans to build their new substation (replacing King St) on the SE corner of Notre Dame and Princess.
This is the parking lot immediately north of Burton Cummings Theatre?

If so, I suppose that a hydro substation might be marginally better than a surface lot in that at least it would define the streetscape somewhat (even if the building would be occupied by machinery instead of people), but it is by no means an ideal place for a substation considering the potential of that site. Even if it couldn't be used to build a multistorey building, even a one-storey commercial space along these lines could fit there. One wonders why Hydro couldn't just go a couple hundred metres west to the vast wasteland that is Notre Dame and Hargrave instead.

If nothing else, at least it's a better option than gutting an entire block of Exchange District buildings to turn them into a substation as MH wanted to a few years ago.
     
     
  #8964  
Old Posted May 21, 2013, 4:24 PM
rypinion's Avatar
rypinion rypinion is offline
Registered User
 
Join Date: Jul 2007
Location: East Exchange, Winnipeg
Posts: 1,396
Quote:
Originally Posted by esquire View Post
Even if it couldn't be used to build a multistorey building, even a one-storey commercial space along these lines could fit there.
Interesting trivia, that Pizza Pizza is actually closed. It was my go-to late night cheap pizza whenever I'm in Toronto on training.
     
     
  #8965  
Old Posted May 21, 2013, 4:30 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,192
Quote:
Originally Posted by esquire View Post
One wonders why Hydro couldn't just go a couple hundred metres west to the vast wasteland that is Notre Dame and Hargrave instead.
This actually came up when the need to expand the King St substation first came up. Hydro has a number of high capacity lines running underground to that specific site and to move even three blocks to the west for the Notre Dame and Hargrave site would be a significantly more complex and expensive project. For whatever reason that site was essentially ruled out of the running and instead the new/expanded substation at HSC was moved forward to take some of the load off King St until further plans could be put in place.

The reality of all this new development downtown is that they need reliable acecss to power. If Hydro is to be believed we are already close to a tipping point downtown with taking into account the demands of these upcoming developments.
     
     
  #8966  
Old Posted May 21, 2013, 4:34 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by rypinion View Post
Interesting trivia, that Pizza Pizza is actually closed. It was my go-to late night cheap pizza whenever I'm in Toronto on training.
Sad to hear... it was one of my favourite spots for a late night slice too. I always thought about how great it would be if a few buildings like it popped up on vacant lots in central Winnipeg. I presume that it is being replaced by a 50-storey condo tower?

Quote:
Originally Posted by CoryB View Post
This actually came up when the need to expand the King St substation first came up. Hydro has a number of high capacity lines running underground to that specific site and to move even three blocks to the west for the Notre Dame and Hargrave site would be a significantly more complex and expensive project. For whatever reason that site was essentially ruled out of the running and instead the new/expanded substation at HSC was moved forward to take some of the load off King St until further plans could be put in place.
Thanks for the information. I figured that there had to be a good reason that Hydro was stuck on that particular area. At least there will be a consolation prize of the King St. site opening up for development... hopefully for something more than a surface parking lot.
     
     
  #8967  
Old Posted May 21, 2013, 4:44 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,917
......ooops, i should have typed Hargrave instead of Princess. It is the empty lot across from the Calvary Temple. Yikes, i really should have read what i typed. The correct information would eliminate a couple of these posts. Sorry boys.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #8968  
Old Posted May 21, 2013, 4:48 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,058
^ much better!
     
     
  #8969  
Old Posted May 21, 2013, 5:08 PM
h0twired's Avatar
h0twired h0twired is offline
Dynamic Positivity!
 
Join Date: Jul 2006
Location: Winnipeg
Posts: 2,914
Quote:
Originally Posted by Biff View Post
......ooops, i should have typed Hargrave instead of Princess. It is the empty lot across from the Calvary Temple. Yikes, i really should have read what i typed. The correct information would eliminate a couple of these posts. Sorry boys.
I was beginning to wonder.

That lot next to the Walker/Cummings Theatre would be WAY too small for a substation.
     
     
  #8970  
Old Posted May 21, 2013, 5:13 PM
cheswick's Avatar
cheswick cheswick is online now
Registered User
 
Join Date: Nov 2010
Location: South Kildonan
Posts: 3,007
Quote:
Originally Posted by Biff View Post
......ooops, i should have typed Hargrave instead of Princess. It is the empty lot across from the Calvary Temple. Yikes, i really should have read what i typed. The correct information would eliminate a couple of these posts. Sorry boys.
Speaking of empty lots across from Calvary Temple, anyone know the status of the condo conversion at 448 Hargrave beside the empty lot?
     
     
  #8971  
Old Posted May 21, 2013, 5:19 PM
h0twired's Avatar
h0twired h0twired is offline
Dynamic Positivity!
 
Join Date: Jul 2006
Location: Winnipeg
Posts: 2,914
Quote:
Originally Posted by cheswick View Post
Speaking of empty lots across from Calvary Temple, anyone know the status of the condo conversion at 448 Hargrave beside the empty lot?
I noticed a little bit of work on the exterior over the past week or two.

However I think they are still trying to sell them as "hard lofts" (bring-your-own-contractor) which may be a harder sell in Winnipeg especially given the size of the units.
     
     
  #8972  
Old Posted May 21, 2013, 6:06 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
Quote:
Originally Posted by rypinion View Post
Interesting trivia, that Pizza Pizza is actually closed. It was my go-to late night cheap pizza whenever I'm in Toronto on training.
Haha I walked by there yesterday!
     
     
  #8973  
Old Posted May 21, 2013, 6:46 PM
headhorse headhorse is offline
BANNED
 
Join Date: Mar 2011
Location: Winnipeg
Posts: 1,743
b posted a photo on his twitter of this site fenced off:

from http://www.twitter.com/brent_bellamy

I wonder if this is still the plan for the site?

from http://mistecture.com
     
     
  #8974  
Old Posted May 21, 2013, 7:21 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,917
I think it is supposed to be 6 storeys, 48 units affordable housing.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #8975  
Old Posted May 21, 2013, 7:21 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,058
ha ha you beat me to it!.

also...tent on site for fortress


     
     
  #8976  
Old Posted May 21, 2013, 7:24 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,058
the glasshouse tower is indeed behind 4play...bottom 5 floors are priced accordingly.

     
     
  #8977  
Old Posted May 21, 2013, 7:27 PM
BKB BKB is offline
Registered User
 
Join Date: Dec 2008
Posts: 208
Quote:
Originally Posted by h0twired View Post
I was beginning to wonder.

That lot next to the Walker/Cummings Theatre would be WAY too small for a substation.
That lot is owned by Pre-Con. Don't expect anything to change (maybe a dollar store of some type).
     
     
  #8978  
Old Posted May 21, 2013, 7:30 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,058
went for a 45 min. walk at lunch. passed site work at portage & main, Alt Hotel going up, stumbled across 48 unit apartment starting construction, visited a bustling show suite for Glasshouse and check out a tent for tomorrow's announcement of a new grand scale condo development....then stopped at Parlour to hear someone I know talking about a new 20 storey condo development in a VERY nice spot that he is working on.

heady days in ol winterpeg.

Last edited by trueviking; May 21, 2013 at 7:42 PM.
     
     
  #8979  
Old Posted May 21, 2013, 7:36 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,058
^...and bought a comic book at ABD Cards.
     
     
  #8980  
Old Posted May 21, 2013, 7:38 PM
DonaldSmith's Avatar
DonaldSmith DonaldSmith is offline
Registered User
 
Join Date: Oct 2012
Location: Wpg, Mb
Posts: 432
Quote:
Originally Posted by trueviking View Post
went for a 45 min. walk at lunch. passed site work at portage & main, Alt Hotel going up, stumbled across 48 storey apartment starting construction, visited a bustling show suite for Glasshouse and check out a tent for tomorrow's announcement of a new grand scale condo development....then stopped at Parlour to hear someone I know talking about a new 20 storey condo development in a VERY nice spot that he is working on.

heady days in ol winterpeg.
Tommorow you should do the Waterfront walk and see The District Condos, Brick's Furniture, Sky phase 2, the Boutique Hotel, H2O, and Youcube phase 2 all under construction/renovation.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 7:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.