I was busy this week, but here is an update. There was a small setback with the project on Thursday, when installation of a window on the 46th floor broke the new window above it. Apparently the window element fitting is so tight that they may break a neighboring window if too much force is applied.
This means they will need to raise the platform back to the 47th floor tomorrow morning, replace the broken window and then lower it to 45th floor. So tomorrow afternoon things are going to get exciting as the work on our floor begins.
This week they were already preparing for the work on our floor. All curtains were removed, ventilation windows were replaced with a plywood and they did two holes in our inner walls for the platform achors. These holes, as well as any other occurring damage, will be repaired the following week.
Anchoring place in the bedroom wall:
Ventilation windows replaced with plywood:
Platform just above us:
Also in the hallway a major preparation work has been underway as they have been covering all the wall and floor surfaces. By doing this they try to prevent any damage to the interiors. You can tell that they do proper job with covering
all surfaces.
Also one of the two residential elevators is completely modified for the project. They are using it for transporting workmen and also the window elements themselves. Interesting to note is the extension they built to one of the corner so they can fit the huge window elements inside the elevator. Surprisingly enough there was extra room in the elevator shaft to do this.