HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 9, 2013, 4:26 AM
skierforlife17's Avatar
skierforlife17 skierforlife17 is offline
 
Join Date: Aug 2008
Posts: 141
111 S Main

Something this forum is too picky. I mean what would you prefer. This design built in the next 5 years or the building with a "better" design built in 15 years? I take next five years. Once its built, designers will be forced (in my opinion which means nothing) to do something different from the 222s and 111s design. My only disappointment is the accordion glass shape/base doesnt feel or appear to join well with the performing arts facade.
     
     
End
   
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 6:55 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.