HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


Closed Thread

 
Thread Tools Display Modes
     
     
  #7121  
Old Posted Apr 25, 2013, 2:38 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^^ Real Estate Management

^ I can't say.. but having said that I've got no idea what Morguard is up to
     
     
  #7122  
Old Posted Apr 25, 2013, 5:02 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,149
Quote:
Originally Posted by 240glt View Post
Heard a rumour today that Jasper-101 will be put up for sale as soon as the redevelopment is complete. Apparently GE wants out.

Also heard that a large REM firm is looking for 500+ units of higher quality, new resi. Up for consideration apparently are Mayfair, (no it won't affect the design of the north building), a portion of Century Park and Edgewater. They may also be looking at doing something at CCA lands.
Correct.

Sounds about right.
     
     
  #7123  
Old Posted Apr 25, 2013, 5:50 AM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,010
Quote:
Originally Posted by 240glt View Post
Heard a rumour today that Jasper-101 will be put up for sale as soon as the redevelopment is complete. Apparently GE wants out.

Also heard that a large REM firm is looking for 500+ units of higher quality, new resi. Up for consideration apparently are Mayfair, (no it won't affect the design of the north building), a portion of Century Park and Edgewater. They may also be looking at doing something at CCA lands.
Not sure about GE, but there are many, MANY REM hunting for that type of asset in this city. Certainly not new news here.
     
     
  #7124  
Old Posted Apr 25, 2013, 2:21 PM
rapid_business's Avatar
rapid_business rapid_business is offline
Urban Advocate
 
Join Date: Nov 2005
Location: Edmonton
Posts: 6,889
Is GE's First & Jasper fully leased? Seems like a good potential flip for them if so.
     
     
  #7125  
Old Posted Apr 25, 2013, 2:30 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,149
^yes it is... and I have also heard it is for sale.
     
     
  #7126  
Old Posted Apr 25, 2013, 3:41 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^ I heard Apega pulled out
     
     
  #7127  
Old Posted Apr 25, 2013, 5:10 PM
brenGT2's Avatar
brenGT2 brenGT2 is offline
Registered User
 
Join Date: Apr 2009
Location: Edmonton
Posts: 266
Here are a few photos I took of the Pearl today from ETLC at the University of Alberta. I won't be getting any more photos from this angle, as I have now graduated with my degree in Materials Engineering. While I'm excited about this, it means I'll no longer have access to the building regularly. Enjoy these "end of an era" photos!


Pearl and ICE Construction Update: April 25, 2013 by brenGT2, on Flickr


Pearl Construction Update: April 25, 2013 by brenGT2, on Flickr


Pearl Construction Update: April 25, 2013 by brenGT2, on Flickr


Pearl Construction Update: April 25, 2013 by brenGT2, on Flickr
     
     
  #7128  
Old Posted Apr 25, 2013, 5:31 PM
Xelebes's Avatar
Xelebes Xelebes is offline
Sawmill Billowtoker
 
Join Date: Nov 2006
Location: Rockin' in Edmonton
Posts: 14,027
It is stunning how many angles you can the Pearl. Macewan on 109th, South Campus and so on.
     
     
  #7129  
Old Posted Apr 25, 2013, 5:32 PM
hilman's Avatar
hilman hilman is offline
Registered User
 
Join Date: Sep 2003
Location: Edmonton
Posts: 2,763
Love the height of the Pearl, can't wait for the glass to go up, the small portion that is installed looks pretty hawt
     
     
  #7130  
Old Posted Apr 25, 2013, 5:35 PM
CanadianCentaur's Avatar
CanadianCentaur CanadianCentaur is offline
Briareos Hecatonchires
 
Join Date: Aug 2002
Location: The Big E
Posts: 3,805
You can definitely see the Pearl from RATT. I almost didn't see that from there due to a snowstorm until the last minute.
     
     
  #7131  
Old Posted Apr 25, 2013, 5:37 PM
oiler-dude's Avatar
oiler-dude oiler-dude is offline
Registered User
 
Join Date: Oct 2008
Posts: 737
Kinda cool, from that angle the condo building in front of the Pearl (Lessard House, I think?) lines up perfectly, making it look like a large podium.

Pearl is gonna look amazing from that angle.
     
     
  #7132  
Old Posted Apr 25, 2013, 8:14 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is online now
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
Quote:
Originally Posted by 240glt View Post
^ I heard Apega pulled out
Were they one of the tenants slated for First & Jasper?
     
     
  #7133  
Old Posted Apr 25, 2013, 10:56 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^ Correct. I'm not sure they are pulling necessarily, just that they are currently looking for space, which seems a bit odd.
     
     
  #7134  
Old Posted Apr 25, 2013, 11:53 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
Quote:
Originally Posted by 240glt View Post
^ Correct. I'm not sure they are pulling necessarily, just that they are currently looking for space, which seems a bit odd.
Could be looking for project space elsewhere. Pretty sure their lease at Jasper/101 is inked.
     
     
  #7135  
Old Posted Apr 26, 2013, 2:30 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,149
     
     
  #7136  
Old Posted Apr 26, 2013, 3:45 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,635
Yeah, not going to happen. I think Calgary's Epcor renos, the first go round came in around that level, were promptly scrapped. I doubt they could raise the money to pay off the loan. What kind of space is going to generate enough return to pay off $700 million. Take out $60 million for self supporting parking and you still have a huge hole. From my memory the project didn't have a hotel or office component.

The loan payment for edit:20 years would be $35,694,769.10 if from the provincial government through the City that would need to be tenant supported, assuming the tenants could keep the facility cash flow positive on the operating side too.

I always thought the city was missing more theatres in the small venue class (300-500) and the 5000-8000 range - do they even have the right products, or just what they know is used know since they already exist? Or is the goal to cannibalize the Jubilee and move those performances downtown?

Last edited by MalcolmTucker; Apr 26, 2013 at 4:15 AM.
     
     
  #7137  
Old Posted Apr 26, 2013, 4:06 AM
GreenSPACE's Avatar
GreenSPACE GreenSPACE is offline
Registered User
 
Join Date: Sep 2006
Location: Edmonton, Alberta
Posts: 1,865
^Interesting numbers. Is super ambitious project. Not sure it's the right project or not, but I can see why they want to be included in the CRL (or some of the streetscaping). If you're spending that kind of money, better be amazingly well designed and executed.

Don't think they're looking to cannibalize the Jubilee. Jubilee is already overbooked and still seats more (2500) than what they're proposing.
     
     
  #7138  
Old Posted Apr 26, 2013, 4:19 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,635
Is there more information on the programming of this available? For the spaces proposed the cost seems crazy. I know don't want to cheap out, but can have nice things that are still reasonable.
     
     
  #7139  
Old Posted Apr 26, 2013, 4:36 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is online now
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
I've always thought that the Rossdale plant would be a great place for a performing arts venue. Surely that would be much cheaper than 3/4 billion bucks.
     
     
  #7140  
Old Posted Apr 26, 2013, 4:41 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is online now
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
On the other hand, I doubt the 3/4 billion project would be all done in one go...I would think this would be built in multiple stages
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 3:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.