Montreasl has automatic train control iirc so the doors lining up issue is easier for them to solve.
     
     
  #6242  
Old Posted Apr 17, 2013, 2:59 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
The only issue with the automated all doors opening is that will suck out a lot of warmth in the middle of the winter for possibly no reason.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #6243  
Old Posted Apr 17, 2013, 6:30 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by DizzyEdge View Post
The only issue with the automated all doors opening is that will suck out a lot of warmth in the middle of the winter for possibly no reason.
Maybe that would keep people from standing at the doors and actually move to the centre of the cars. This could actually be a blessing.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #6244  
Old Posted Apr 17, 2013, 6:32 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,179
I think the doors are fine the way they are, except maybe they should close a little more aggressively so some kids backpack blocking the sensor wont keep it open for 5 minutes.
__________________
Git'er done!
     
     
  #6245  
Old Posted Apr 19, 2013, 12:42 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
CT Overtime Management Audit

This audit was on City Council's Audit Committee's agenda today.

CT Overtime Management Audit

From the Executive Summary:

"We observed that out of 2,017 operators who volunteered for overtime in 2011, three individuals earned more than $30,000 in overtime pay; and that another 21 operators earned more than $20,000. Of these top 24 overtime earners, 21 were senior operators. The average overtime paid in 2011 to operators was approximately $3,596.

While management is aware of who these operators are, and the operators willingly sign-up for overtime, we pointed out that significant amounts of overtime for one individual can have negative health and safety consequences."


It's an interesting read.
__________________
Stevinder.
* * * * * *
     
     
  #6246  
Old Posted Apr 19, 2013, 2:06 AM
ByeByeBaby's Avatar
ByeByeBaby ByeByeBaby is offline
Crunchin' the numbers.
 
Join Date: Mar 2009
Location: T2R, YYC, 403, CA-AB.
Posts: 791
Quote:
Originally Posted by srperrycgy View Post
This audit was on City Council's Audit Committee's agenda today.

CT Overtime Management Audit

From the Executive Summary:

"We observed that out of 2,017 operators who volunteered for overtime in 2011, three individuals earned more than $30,000 in overtime pay; and that another 21 operators earned more than $20,000. Of these top 24 overtime earners, 21 were senior operators. The average overtime paid in 2011 to operators was approximately $3,596.

While management is aware of who these operators are, and the operators willingly sign-up for overtime, we pointed out that significant amounts of overtime for one individual can have negative health and safety consequences."


It's an interesting read.
It's interesting, and I think that the recommendations make sense (from a quick skim). We're talking about $2.7 million a year over budget on the last two years, which is like a 50% increase over the budget for overtime. That's the big massive headline, but what no one talks about -- and you can't find out from this report or the media reports -- is that CT has a $213 million per year personnel budget; this is about a 1% deviation overall. (And presumably some of the overtime is because CT hasn't hired staff, so the regular wage budget may be under.)

Certainly, there is a reason for budgets and big overages need to be checked out and it seems like action needs to be taken. But there's one tree in a big forest everybody seems to be looking at.
     
     
  #6247  
Old Posted Apr 19, 2013, 3:19 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,599
Compared to the overtime situation in Toronto, this is nothing.
     
     
  #6248  
Old Posted Apr 22, 2013, 2:13 PM
Acey
Guest
 
Posts: n/a
I've made $20k in overtime before. It's nice, but my God are you ever drained at the end of the year. Definitely not something you can maintain long term.
     
     
  #6249  
Old Posted Apr 22, 2013, 7:22 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by srperrycgy View Post
This audit was on City Council's Audit Committee's agenda today.

CT Overtime Management Audit

From the Executive Summary:

"We observed that out of 2,017 operators who volunteered for overtime in 2011, three individuals earned more than $30,000 in overtime pay; and that another 21 operators earned more than $20,000. Of these top 24 overtime earners, 21 were senior operators. The average overtime paid in 2011 to operators was approximately $3,596.

While management is aware of who these operators are, and the operators willingly sign-up for overtime, we pointed out that significant amounts of overtime for one individual can have negative health and safety consequences."


It's an interesting read.
While massive shifts in overtime trends are of note and should be addressed, the fact that a few folks take-up those over-time opportunities at a higher clip is neither here nor there. Individuals working hard to legitimately earn extra bucks should not be penalized for it (unless the colluded to create the situations requiring overtime).

Separately and not relating to an organization with a lot of oversight such as CT, I've heard in Roads that there used to be situations where snowplough guys would sleep in their equipment cabs in the city lots for the balance of their shifts when snowfalls didn't pan out, and only proceed to maintenance after their usual driving hours were over such as to ensure overtime. Can't verify, but if that type of stuff is true, it's a different ballgame altogether!
     
     
  #6250  
Old Posted Apr 23, 2013, 12:59 AM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by suburbia View Post
While massive shifts in overtime trends are of note and should be addressed, the fact that a few folks take-up those over-time opportunities at a higher clip is neither here nor there. Individuals working hard to legitimately earn extra bucks should not be penalized for it (unless the colluded to create the situations requiring overtime).

Separately and not relating to an organization with a lot of oversight such as CT, I've heard in Roads that there used to be situations where snowplough guys would sleep in their equipment cabs in the city lots for the balance of their shifts when snowfalls didn't pan out, and only proceed to maintenance after their usual driving hours were over such as to ensure overtime. Can't verify, but if that type of stuff is true, it's a different ballgame altogether!
The fact of the matter is, if CT continues to hand out OT like it does - based on seniority - it's easy for the most senior operators to volunteer and work a lot of overtime. It just means that one guy gets $30,000 because he's always the first in line, rather than having six junior guys each with $5,000. I don't think that number is really that surprising - if OT was supposed to be handed out equally, then that number would be hugely alarming.
     
     
  #6251  
Old Posted Apr 23, 2013, 11:39 AM
mellbell416 mellbell416 is offline
Registered User
 
Join Date: Aug 2012
Posts: 165
When i s the Chinook LRT finally going to be ready for action again?? It has been down forever, and I drove past it the other day and man, it looks like it is in a complete mess....
     
     
  #6252  
Old Posted Apr 23, 2013, 1:21 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by mellbell416 View Post
When i s the Chinook LRT finally going to be ready for action again?? It has been down forever, and I drove past it the other day and man, it looks like it is in a complete mess....
Mid August. It's a long way to go, there's currently no platform inside the shelter so quite a bit of work.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #6253  
Old Posted Apr 23, 2013, 1:24 PM
Chealion Chealion is offline
Registered User
 
Join Date: Jul 2012
Location: Sunalta, Calgary
Posts: 141
Quote:
Originally Posted by mellbell416 View Post
When i s the Chinook LRT finally going to be ready for action again?? It has been down forever, and I drove past it the other day and man, it looks like it is in a complete mess....
August.

http://www.calgarytransit.com/html/chinook_station_info.html
     
     
  #6254  
Old Posted Apr 24, 2013, 8:06 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Seeing as how Calgary has recently been considering tram/streetcar, I thought this might be relevant. Montreal has a new plan for a tram. Sorry it's in French:

http://ville.montreal.qc.ca/pls/portal/d.../1_rapport_synthse_projet_du_tramway.pdf

Edit: By new, I guess I mean "newly made public" feasibility plan. It looks like it's 100% separated ROW, $1B, 32 stations, 70 000 passengers daily, hopefully to be complete 2021.

Last edited by RyLucky; Apr 24, 2013 at 8:17 PM.
     
     
  #6255  
Old Posted May 2, 2013, 5:22 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Here is how delayed trains due to passenger holding open the door is solved in London's Tube.

www.jokeroo.com/videos/fail/woman-blocking-dor-tram.html
     
     
  #6256  
Old Posted May 3, 2013, 1:49 AM
elconsulto's Avatar
elconsulto elconsulto is offline
Registered User
 
Join Date: Apr 2010
Location: Calgary
Posts: 214
Quote:
Originally Posted by Cage View Post
Here is how delayed trains due to passenger holding open the door is solved in London's Tube.

www.jokeroo.com/videos/fail/woman-blocking-dor-tram.html
I don't think we need any special technology or new system to keep the doors clear, just hire a "bouncer" or security guard for each platform during peak hours. I've heard people say it won't happen, but is that really out of the question? The other day some dickheads held up the train for like 45 seconds, I watched one of them hold the door open so his buddy could grab his skateboard which rolled across the platform. That's got to mess up their schedule somewhat. Or why not just ban teenagers from the train? hahaha
     
     
  #6257  
Old Posted May 3, 2013, 4:44 AM
Jeffsey500 Jeffsey500 is offline
Red tape good. So Festive
 
Join Date: Jul 2007
Location: Calgary
Posts: 129
Quote:
Originally Posted by elconsulto View Post
I don't think we need any special technology or new system to keep the doors clear, just hire a "bouncer" or security guard for each platform during peak hours. I've heard people say it won't happen, but is that really out of the question? The other day some dickheads held up the train for like 45 seconds, I watched one of them hold the door open so his buddy could grab his skateboard which rolled across the platform. That's got to mess up their schedule somewhat. Or why not just ban teenagers from the train? hahaha
Have they considered reprogramming the doors to force close? Elevators doors force close after a certain time, they start making noise and closing and ignore the door open buttons, optical beams, door sensors, etc. I'm thinking a similar logic could help.
__________________
Red tape is AWESOME! But not as awesome as Duct Tape.
     
     
  #6258  
Old Posted May 3, 2013, 8:40 PM
Offside_Ref Offside_Ref is offline
Registered User
 
Join Date: Oct 2010
Location: East Van
Posts: 23
Quote:
Originally Posted by Jeffsey500 View Post
Have they considered reprogramming the doors to force close? Elevators doors force close after a certain time, they start making noise and closing and ignore the door open buttons, optical beams, door sensors, etc. I'm thinking a similar logic could help.
From what I've heard, they use the story of a blind person getting separated from their guide dog from forced closed doors as a reason not to have it.
     
     
  #6259  
Old Posted May 3, 2013, 9:51 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
Maybe the SE LRT could actually be a gondola/tram.

If the numbers in that article are right, we are clearly doing it wrong.
     
     
  #6260  
Old Posted May 3, 2013, 10:17 PM
MichaelS's Avatar
MichaelS MichaelS is offline
Registered User
 
Join Date: Jan 2006
Location: Calgary
Posts: 2,402
Quote:
Originally Posted by DoubleK View Post
Maybe the SE LRT could actually be a gondola/tram.

If the numbers in that article are right, we are clearly doing it wrong.
I have always thought a gondola would be the perfect solution for the North Central line, as it could run up centre street for a fraction of the cost (no need for costly widening, or a bridge/tunnel up the hill from downtown).
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.