Is there any work being done on the Yellowhead - TCH interchange west of Portage la Prairie? Or is that project dead now.
Reply With Quote
     
     
  #302  
Old Posted Apr 13, 2013, 5:40 PM
esquire's Avatar
esquire esquire is offline
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by VANRIDERFAN View Post
Is there any work being done on the Yellowhead - TCH interchange west of Portage la Prairie? Or is that project dead now.
I haven't heard anything to suggest that the project is dead, but they sure are taking their sweet time with it considering it was announced in October 2007 (!). There are no signs of any actual construction on the site whatsoever.

Here is the project website with a few more details: http://1and16interchange.ca/
Reply With Quote
     
     
  #303  
Old Posted Apr 13, 2013, 6:00 PM
Jeff's Avatar
Jeff Jeff is offline
 
Join Date: Oct 2002
Posts: 2,339
flood-related funding problems have delayed this plus the 59 @ lagimodiere projects from my sleuthing.. all pushed back indefinitely from the reports I've read.
Reply With Quote
     
     
  #304  
Old Posted Apr 13, 2013, 6:12 PM
esquire's Avatar
esquire esquire is offline
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Jeff View Post
flood-related funding problems have delayed this plus the 59 @ lagimodiere projects from my sleuthing.. all pushed back indefinitely from the reports I've read.
That's consistent with what I've heard... with flood costs running into the billions it's easy to see how discretionary expenses like new interchanges can get pushed back.

But still... it's pretty amazing how few interchanges get built in Manitoba. The CentrePort Canada Way interchange with the Perimeter Highway (which will probably open in 2014) is, as far as I can recall, the first brand-new interchange in this province since one on the Portage by-pass was built a good 20 years ago or so... it must have been around 1992 or 1993.

It has been even longer inside the Perimeter. I'm pretty sure that the last new interchange to get built in the City of Winnipeg was the one at Bishop Grandin and Pembina which opened in 1990.
Reply With Quote
     
     
  #305  
Old Posted Apr 14, 2013, 12:11 AM
Biff's Avatar
Biff Biff is offline
 
Join Date: Jun 2004
Posts: 9,945
Quote:
Originally Posted by VANRIDERFAN View Post
Is there any work being done on the Yellowhead - TCH interchange west of Portage la Prairie? Or is that project dead now.
It is what they call "on hold indefinitely"........due to the flooding.
Reply With Quote
     
     
  #306  
Old Posted Apr 15, 2013, 2:35 AM
dsmmace dsmmace is offline
 
Join Date: Jun 2012
Posts: 423
Has anything ever happened at the Bridge in St. Louis, SK? I haven't been out that way in a loooong time.
Reply With Quote
     
     
  #307  
Old Posted Apr 17, 2013, 5:57 PM
esquire's Avatar
esquire esquire is offline
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Biff View Post
It is what they call "on hold indefinitely"........due to the flooding.
Neither of the planned interchanges (1+16, 101+59) are on the just-released highway capital project list for 2013/14.

Once the interchange at 101+190 opens sometime next year, that will become the one and only new traffic interchange built in Manitoba in the last two decades.
Reply With Quote
     
     
  #308  
Old Posted Apr 17, 2013, 6:40 PM
Biff's Avatar
Biff Biff is offline
 
Join Date: Jun 2004
Posts: 9,945
Quote:
Originally Posted by esquire View Post
Neither of the planned interchanges (1+16, 101+59) are on the just-released highway capital project list for 2013/14.

Once the interchange at 101+190 opens sometime next year, that will become the one and only new traffic interchange built in Manitoba in the last two decades.
The detailed design is expected in 2014 for 101 & 59. 1 & 16 is really up in the air now.
Reply With Quote
     
     
  #309  
Old Posted Apr 17, 2013, 8:32 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
 
Join Date: Jan 2007
Posts: 5,488
Quote:
Originally Posted by Biff View Post
The detailed design is expected in 2014 for 101 & 59. 1 & 16 is really up in the air now.
Is it because 1&16 is outside of the Perimeter?
Reply With Quote
     
     
  #310  
Old Posted Apr 17, 2013, 9:19 PM
micheal micheal is offline
 
Join Date: Nov 2011
Posts: 415
Quote:
Originally Posted by VANRIDERFAN View Post
Is it because 1&16 is outside of the Perimeter?
maybe it has something to do with the recent budget?
Reply With Quote
     
     
  #311  
Old Posted Apr 17, 2013, 9:45 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,383
From all accounts (and common sense) the billions of dollars spent on flooding issues has again delayed these projects and others. One of the interchanges is out at Lake St. Martin in the form of a floodway channel.
Reply With Quote
     
     
  #312  
Old Posted Apr 18, 2013, 4:40 PM
sask1982's Avatar
sask1982 sask1982 is offline
 
Join Date: Sep 2002
Posts: 916
Regina SE Bypass

Reply With Quote
     
     
  #313  
Old Posted Apr 18, 2013, 4:46 PM
rrskylar's Avatar
rrskylar rrskylar is offline
 
Join Date: Sep 2004
Posts: 7,641
Quote:
Originally Posted by bomberjet View Post
From all accounts (and common sense) the billions of dollars spent on flooding issues has again delayed these projects and others. One of the interchanges is out at Lake St. Martin in the form of a floodway channel.
Remind us how well that floodway channel at lake St. Martin worked.
Reply With Quote
     
     
  #314  
Old Posted Apr 18, 2013, 5:19 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,383
Quote:
Originally Posted by rrskylar View Post
Remind us how well that floodway channel at lake St. Martin worked.
It worked just as intended.
Reply With Quote
     
     
  #315  
Old Posted Apr 18, 2013, 6:18 PM
jmt18325's Avatar
jmt18325 jmt18325 is offline
 
Join Date: Apr 2009
Posts: 7,286
It worked extremely well.
Reply With Quote
     
     
  #316  
Old Posted Apr 18, 2013, 9:35 PM
North_Regina_Boy North_Regina_Boy is offline
 
Join Date: Mar 2010
Posts: 1,474
Quote:
Originally Posted by sask1982 View Post
Thanks bud! Looks like it is moving right along! Functional planning drawings to be next. I would best by late this year early next they have funding in place with construction to start Spring 2014! I base that on level of need (lots of trucks) and growth of the Regina area.
Reply With Quote
     
     
  #317  
Old Posted Apr 18, 2013, 9:57 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
 
Join Date: Jan 2007
Posts: 5,488
Quote:
Originally Posted by North_Regina_Boy View Post
Thanks bud! Looks like it is moving right along! Functional planning drawings to be next. I would best by late this year early next they have funding in place with construction to start Spring 2014! I base that on level of need (lots of trucks) and growth of the Regina area.
With the selection of Tower road as the eastern terminus of a new Ring Road it looks like Regina will be developing to the west and south. Pilote Butte, White City and Balgonie will continue to develop on their own but interchanges and service roads will be built along this corridor to ensure the free flow of traffic from the east.
Reply With Quote
     
     
  #318  
Old Posted Apr 19, 2013, 12:09 AM
sask1982's Avatar
sask1982 sask1982 is offline
 
Join Date: Sep 2002
Posts: 916
Quote:
Originally Posted by North_Regina_Boy View Post
Thanks bud! Looks like it is moving right along! Functional planning drawings to be next. I would best by late this year early next they have funding in place with construction to start Spring 2014! I base that on level of need (lots of trucks) and growth of the Regina area.
I'm going to say 2015 or 2016 at best. If you look at the projects priority page, it indicates that the Dewdney - Hwy 11 portion of the west bypass, as well as the Pilot Butte interchange, are priority OVER the south bypass, regarding the construction timeline specifically.
Reply With Quote
     
     
  #319  
Old Posted Apr 19, 2013, 10:08 PM
original original is offline
 
Join Date: Sep 2011
Posts: 95
Quote:
Originally Posted by sask1982 View Post
Wow, look at that purposed interchange. Can we get some of that in MB please?

I'm only kidding, that will never happen. All of our monies is spent on floods
Reply With Quote
     
     
  #320  
Old Posted Apr 20, 2013, 2:52 AM
Bdog's Avatar
Bdog Bdog is offline
 
Join Date: Jul 2005
Posts: 2,228
Quote:
Originally Posted by original View Post
Wow, look at that purposed interchange. Can we get some of that in MB please?

I'm only kidding, that will never happen. All of our monies is spent on floods
A systems interchange like the one in the picture would cost easily upwards of $140 - $150 M...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.