Quote:
Originally Posted by libtard
Nowhere else have I seen a city go to such great lengths NOT to resurface the whole road. We'd much rather cut square patches all over them  So uneven and sh1tty looking
|
Vancouver's pretty decent at paving actually, apart from all the small patches for sewer works that happen between paving cycles. In fact, I cannot recall of too many places where there are bumps all over, apart from say Knight Street south approach (which thankfully is getting resurfaced tonight).
In fact, the most problematic area for paving in this region would be Simon Fraser University, where they are grinding out the old concrete road and replacing it with paved patches... one square at a time. Those make for seriously rough rides on the buses heading there. Too bad no government has taken up the job to fund their entire reconstruction.
Anyway, the point of this thread is not quality of roads, but the options for GMT at present. I don't have too many concerns about the options presented, although clearly there needs to be some expansion for extra traffic. As I've said before, however, transit should play a role in this project as well, whether it be by HOV/HOT lanes or even light rail provisions.
Therefore, on that note, I'll probably be more inclined to support bridge or tunnel methods that stay close to the existing alignment of the George Massey Tunnel. This is because:
- less need to have to reroute buses through the middle of nowhere
- HOV/HOT lanes can be integrated pretty easily to the connecting roadways on either side
Other reasons for supporting an expansion of the current corridor include:
- more direct connections to major corridors and destinations, rather than a roundabout "alternate" route
- easier access to trails and walkways on either side of the existing corridor, vs in the middle of nowhere for the upstream bridge