Quote:
Originally Posted by BrianTH
Regardless of what you want to call it, Cranberry is around 20 miles from Downtown Pittsburgh. The sustainable frequency for a service like that will be limited, and the T is going to be too slow over that distance.
|
You do have a point with the slow T service. And according to Google Earth, Cranberry is 17 miles from Downtown. Compared to places like Dallas and Suburban Philly (the speed line running from Norristown to Upper Darby), that's roughly 3-5 miles further than, say any of those termini (DART and SEPTA).
Quote:
Originally Posted by BrianTH
There is a lightly used but still active freight rail line that starts off heading up along Route 8 and eventually goes through Gibsonia, Valencia, Mars, Evans City, and Zelienople. If we were going to do commuter rail (or whatever you want to call it) into the North Hills, I think that path would make a lot more sense--you could probably use faster trains, there would be real potential for TOD and revitalizing existing communities, and if anything the ROW and infrastructure costs could be significantly less.
Edit: To flesh this out a bit more, I'll assume the AVRR commuter rail plan has gotten service into Downtown (preferably into Steel Plaza). This line would share those tracks until the split at 33rd Street. Stations after that split could be at Millvale, Etna, Allison Park, Gibsonia, Mars, Evans City, and Zelienople. At least every station but Allison Park and Gibsonia would have real TOD/revitalization potential (Allison Park and Gibsonia would likely be mostly park-and-ride stations, although maybe you could do a little something right at the stations).
|
I am familiar with that line, and I believe at one point a while back Pittsburgh Railways ran a trolley line along this line. There's a split near Zelienople, with one branch going to New Castle and the other toward Butler. I, too, would like to see commuter rail serve these lines at some point. Two questions that come to mind is would this require double-tracking, and is double tracking possible? I know that you mentioned infrastructure upgrades...
The LRT extension I envision would actually end at Mars, providing a connection opportunity for those residing in Cranberry to the faster commuter system.
I guess we could do both at some point. For those who would live/work along the McKnight Rd corridor, there's LRT. For those wishing to get to/from Cranberry and Downtown without any hassle, there's the commuter rail option...
It's a thought. Obviously doing both simultaneously would likely cost upwards of $2-3 billion, considering we're talking about $1.3 billion for the LRT option.
Man, we're just at a year of operational North Shore service and we're talking about yet another pricey extension!