Quote:
Originally Posted by davehogan
Not sure, but that also isn't a current rendering. Last planning document I read is much more compact, and wipes out the Safeway on the east side of the freeway. The linked rendering I think is from about 2009 or 2010 when it was going to be 22 lanes counting all the on/off ramps that were going to overlap on Hayden Island.
It's been significantly scaled back since then.
|
Still haven't been able to track down any other images. Ran through the CRC website - I don't think they exist.
In fact, the Vancouver City Council agrees:
Quote:
Dick Pokornowski, a former Vancouver city councilor who served on the crossing’s urban design advisory group, said the group never saw street-level renderings.
“We had requested different computer designs of how the bridge would look,” he said. “And some of that stuff they said they couldn’t do because it would cost too much."
|
Source:
http://bikeportland.org/2013/02/26/will-the-real-crc-project-please-stand-up-83278
If you read the above article, Jonathan Maus specifically states that the image he uses was obtained through CRC Communications staffer Mandy Putney. The image was buried in one of the
reports - "...appear in the appendix of the CRC's Urban Design Advisory Group final report."
Therefore, I think it is fair to say that it is a current, valid rendering.
Just like to give out an example-
If a construction company were to build a building that is 50% different than the original plans that were approved by the city, they would have their construction permits revoked and be forced to stop. I believe the same should hold true for public projects. The "we didn't have enough money to make new plans and project drawings" isn't a valid defense when designing ANY project, especially considering that they have spent $170 million (more than the replacement cost of the Sellwood bridge) on lobbying & PR.
Being in the architectural field, this is just flat-out criminal behavior.