Quote:
Originally Posted by fusili
They definitely do have ridership overlap. With the south being the largest transit market, it makes sense to have more than just the LRT provide a higher level of service. While a limited stop service does relieve pressure on the over capacity LRT, it will still be useful after the subway is built, as it serves areas not covered by the LRT, such as Britannia and Mission. Plus it is a straight north/south route and so fits nicely into a high frequency grid of transit routes.
|
It's the frequency that concerns me. Currently the #3 in the south is less frequent than the #3 in the north. In the north, measured southbound @ 16 Ave, there are now 130 buses during the day. In the south, measured northbound @ 56 Ave (where overcrowding typically becomes a concern during the rush), there are now 118 buses during the day. Frequency on the southern portion is essentially every ~10 minutes from 06:00 until 21:30 with ~5 minutes during the peaks. I consider that to be pretty much the minimum for a frequent route. Much longer and it becomes impractical to simply show up at any point during the day without checking the schedule.
I have real doubts that CT would be able to justify having two frequent routes on Elbow Drive, especially if the current capacity issues disappear as the SLRT is improved. If CT cannot operate both routes with a minimum frequency of ~15 minutes then they will both suffer. Furthermore, I just can't see the limited stop bus offering that much better service for riders north of Glenmore. The trip downtown is already short and the possible time savings would be quite short. Downtown is pretty much where everyone gets off and quite frankly, offering a limited stop service to Fishcreek Park is a pretty lousy way to help Mission residents (where the pass ups become common in typical circumstances) avoid a fifteen minute walk.