Quote:
Originally Posted by Metro-One
The tunneled LRT would only be 1.7 to 4.4 km long, so not much of the line.
|
And we should hope that if they spend extra billions on an LRT tunnel under the Broadway corridor, they will make the tunnels large enough to be retro-fitted to run SkyTrain cars. The LRT tunnels should be planned so they can be extended to the SkyTrain guideways when LRT reaches its capacity (2050 if the various reports are correct).
Otherwise I can see where this is going:
In a few years...
OH MY G*D !!
Skytrain Tunnels are too damm expensive!
we gotta build the cheapest LRT option on Broadway.
Dig up Broadway from Commercial to UBC for Surface LRT.
a few years later (likely before 2030) ....
DAMMMIT!
LRT is jamming up traffic on Broadway and all the major cross-streets
we have to dig up Broadway from Main St to Arbutus for LRT tunnels.
That'll be the solution.
a few years later (likely before 2050) ....
DAMMMIT!
LRT is getting jammed up in the tunnels, and we can't run any more trains on/under Broadway.
The smart guys say we have to dig up Broadway from Commercial to Arbutus and change the LRT tunnels to Skytrain tunnels.
a few years later (not sure if we're still around to see this though) ....
the creme de la creme west of Arbutus are still complaining about the BRT from Arbutus to UBC that has been running past them for decades. The idea of gondolas down 12th Ave and 10th Ave from Arbutus to UBC isn't acceptable to them either.
the only option left is to dig up Broadway and 10th Ave from Arbutus to UBC to extend SkyTrain.
.... or it could be done the right way from the beginning - TBM tunnel from VCC Station to UBC. Do it right the first time, and it doesn't have to be re-done every few decades at greater expense.