^^ Its not a comparison, but rather to prove a point that:
1) People here have no idea what "crowded" really means.
I just happen to use Manila since I frequent the SSC Philippine Forums a lot, but could have easily used, say India or Japan to point out the true definition of a crowded transit situation. But I don't have the links handy (had to google the Toronto pic), so there ya go. Ultimately, people have to realize that Metro Vancouver's transit situation is simply not as dire and extreme as some people make it out to be.
Yes, rapid transit needs to be expanded, but its done in such a way that it would shape development so that as it grows, it would do so in a sustainable manner, and NOT end up like Manila where the government cannot keep up with the demand due to their tardiness in building their rapid transit lines. Because believe me, at the rate the Canadian government is bringing people in from other countries, this place will be like Manila soon.
Oh btw Daryl, I've been following the saga of the MRT/LRT lines in Manila even before you were born! Even took it frequently from the "Shang" since I lived in Ortigas and all...
2) To counteract's nname's comment on "just not enough trains". And to respond directly to his post, it seems that there is this assumption that Burquitlam would be an end station for a line going from it to VCC Clarke.
There is no reason why you have to have a dedicated fleet of trains just for that brand new route. You can simply assign a few of the existing trains to simply route to Burquitlam instead of moving onwards to New West. It doesn't have to be super frequent, but ultimately, the station can be services, say once every 10 minutes as oppose to two minutes.
In this way, the station can be utilized to the existing residents and new riders with an enhance transit system and all. Once Evergreen is complete all the way to Douglas, then you can have your new trains. But right now, having that lone station open, it can be done and serviced with the existing fleet.
This will be my last word on the issue for now. Before the topic gets hijacked and deviated, some Evergreen Line News...
http://www.tricitynews.com/news/193401291.html
Quote:
Lanes will also be shifted on Barnet to permit construction as building on the tunnel will essentially be in two phases.
First, a tunnel has to be dug under Barnet Highway for the portal; then, tunnel digging will begin on the west side of the highway. Tunnel construction materials, including concrete segments, will be stored in a staging area near the former Andres Wines site but tunnel boring will be on the west side to avoid contaminating the environmentally sensitive area around Schoolhouse Creek, and for ease of construction, according to the contractors.
|