Quote:
Originally Posted by BrianTH
PPS was in the process of reducing the number of high schools at the time. Because of all the expensive work Schenley needed (and still needs), it didn't make any sense to insist on keeping it open. And because it is unlikely the district will need a new high school building any time soon, and because Schenley will keep deteriorating if kept closed, it doesn't make sense for PPS to try to mothball it for some ill-defined future use.
And yes, closing Schenley has always been controversial, but never because those who opposed closing it ever had the numbers or other practical arguments on their side (all they have been doing is critiquing the available numbers and demanding new studies, which then keep coming back with the same bad news). In other words, that opposition has always been about nostalgia and emotion.
|
While it is true that the school district shrunk and it was not justified to keep all school buildings open, Schenley was not closed as part of that plan (a plan, by the way, which has largely failed in its intent). Schenley was quickly closed because the new windows they installed in 2005 were inappropriate for the building and worsened plaster problems in the school by causing more moisture to be retained. Plaster falling created safety/liability issues and students had to be moved out of the school. The asbestos problem was exaggerated as justification for the move and closure, because the real story that the district's expensive "renovations" (the windows 2 1/2 years earlier) were a big mistake and caused the more
rapid deterioration, would obviously not be publicly popular.
Schenley represents a classic case of not adequately maintaining the physical plant, and then addressing secondary maintenance issues with inappropriate measures, which then act to aggravate the primary maintenance issues. Unfortunately, this happens all the time with old school buildings. If anyone has experience with school districts and their old buildings, they know this to be true.
And sure, much of the public outcry about Schenley's closure is based in nostalgia and emotion. But not all opposition to closure was based on that, rather than on "numbers" or "practical arguments". Many who had no attachment to Schenley opposed it on fiscal issues. Over $15M was put into the move to and renovation of the closed Reizenstein (which was obsolete in design and not planned to have any future other than serving as a temporary home for the Schenley students). It is still a puzzling waste of millions of dollars. That sum was enough to remediate all asbestos issues and fix the plaster and windows. Of course, that amount would not address HVAC, plumbing, and electrical systems, but those issues are par for the course when talking about any large older school building.
I'm not advocating that PPS needs to completely renovate and reopen Schenley. I think we are far beyond that point now. I was just saying that I can understand the feelings many Pittsburghers have about its closure and pending sale (whether based on "emotion" or school district fiscal issues) -- and when non-Pittsburghers opine on the topic, having only limited information/experience on the topic, their assertions ring pretty hollow.
My main thing has always been that I'd like to see the building put to its best use. And though large, older school buildings are generally tough to reuse efficiently, that best use of Schenley, in a shrinking school district like Pittsburgh, may very well end up being apartments. I just don't want to see a renovation and reuse that is inadequate... I'm concerned about the fact that while Schenley comprises around 350,000 sq ft of space, only about half of that is rentable space suitable for apartment development, due to the building's unique layout.
And as for the assertion that the opposition has "always been about nostalgia and emotion", tell that to the Hill District.