Confederation Line (Stage 1) | In Service

OLRT project was just passed by council 24-0 and the money is starting to flow from the province and the feds. Perhaps this thing might actually get built???

Last edited by waterloowarrior; Sep 20, 2019 at 12:45 PM.
Reply With Quote
     
     
  #2  
Old Posted Dec 19, 2012, 8:55 PM
citizen j's Avatar
citizen j citizen j is offline
Registered User
 
Join Date: Oct 2005
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by capital_urbanite View Post
OLRT project was just passed by council 24-0 and the money is starting to flow from the province and the feds. Perhaps this thing might actually get built???
I think there's a reference to the Confederation Line project on the Mayan calendar.
__________________
The world is so full of a number of things
-- Robert Louis Stevenson
Reply With Quote
     
     
  #3  
Old Posted Dec 19, 2012, 11:42 PM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738
Quote:
Originally Posted by citizen j View Post
I think there's a reference to the Confederation Line project on the Mayan calendar.
A 24-0 vote by council could only be an omen of the end of the world.
Reply With Quote
     
     
  #4  
Old Posted Dec 20, 2012, 12:35 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
If something is going to cause this line not to be built, it's likely to be some major unexpected problem of a technical or engineering nature causing the budget to blow up.



On another note, since this thread is kind of redundant at the moment given that we already have a rapid transit developments thread, I nominate that this be the SSP Ottawa Confederation Line Construction thread. So hopefully lots of construction pics...




For anyone reading this thread in the years to come, especially if you're not from Ottawa, here's the City of Ottawa's light rail website:

http://www.ottawalightrail.ca
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #5  
Old Posted Dec 20, 2012, 3:16 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,212
Quote:
Originally Posted by Dado View Post
On another note, since this thread is kind of redundant at the moment given that we already have a rapid transit developments thread, I nominate that this be the SSP Ottawa Confederation Line Construction thread.
I second the motion. Can an admin rename it?
Reply With Quote
     
     
  #6  
Old Posted Dec 20, 2012, 12:56 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,456
I nominate adding the '| U/C' as we do with other developments. It isn't necessarily redundant either, the other thread would include discussion about the O-Train and BRT, but it does make sense that this would end up being updates about construction etc.
Reply With Quote
     
     
  #7  
Old Posted Feb 13, 2013, 9:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,843
Quote:
Design and construction to begin on LRT line

The city has finalized the finances of its agreement with Rideau Transit Group to construct Ottawa’s $2.1 billion light-rail line, the consortium’s companies announced Wednesday.

Toronto-based ACS Infrastructure will lead the contract to design, build, finance and maintain the city’s LRT system. Construction cost is estimated at $1.8 billion, with an additional $300 million allocated for buying the necessary land.

Engineering firm SNC Lavalin, construction company EllisDon Corp. and Ottawa-based BBB Architects are also part of the group.

Rideau Transit Group, which was named as the winning bidder by the city in December, will be responsible for the construction of 12.5 kilometres of track, 13 new stations and a 2.5 kilometre tunnel underneath downtown Ottawa.

In addition to the construction, the consortium will widen parts of Highway 417, supply the light-rail transit vehicles, build a maintenance and storage facility and provide 30 years of maintenance.

Design and construction is slated to begin immediately, with service expected in spring 2018.

“We are proud to partner with the City of Ottawa to deliver a project that will bring great benefits to the city and its residents,” stated EllisDon president and CEO Geoff Smith in a company release.

“We recognize that the civil infrastructure market is growing and we have structured the company to respond to this need.”

Much of the work that will need to be done on the light-rail line is still up for grabs, and members of the winning consortium say they will be looking to local firms to do a lot of the heavy lifting over the estimated five-year construction period.
http://www.obj.ca/Real%20Estate/Cons...-on-LRT-line/1
Reply With Quote
     
     
  #8  
Old Posted Feb 13, 2013, 10:44 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
Reply With Quote
     
     
  #9  
Old Posted Feb 14, 2013, 1:57 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,843
Quote:
Originally Posted by waterloowarrior View Post
For Rideau Station near the end (page 79), we can see parts of the Rideau Expansion plans.
Reply With Quote
     
     
  #10  
Old Posted Feb 14, 2013, 2:44 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,358
Quote:
Originally Posted by waterloowarrior View Post
That's the first time I've seen a render for that Downtown East Station entrance. Can it even fit there? it will obscure a garage ramp.
Reply With Quote
     
     
  #11  
Old Posted Feb 14, 2013, 3:02 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,358
Quote:
Originally Posted by J.OT13 View Post
For Rideau Station near the end (page 79), we can see parts of the Rideau Expansion plans.
I'm surprised they are going for two separate ticketing concourses instead of one large central hall connected to all exits. I hate these types of stations where if you happen to be on one end of the train and the specific exit is down the other end of the platform. It's fine for outlying stations but not great for a downtown hub like Rideau. It is far less confusing to deal with wayfinding on a concourse level instead of the platform level.
Reply With Quote
     
     
  #12  
Old Posted Feb 14, 2013, 3:12 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,843
Quote:
Originally Posted by Kitchissippi View Post
I'm surprised they are going for two separate ticketing concourses instead of one large central hall connected to all exits. I hate these types of stations where if you happen to be on one end of the train and the specific exit is down the other end of the platform. It's fine for outlying stations but not great for a downtown hub like Rideau. It is far less confusing to deal with wayfinding on a concourse level instead of the platform level.
I agree; it would be wise to connect the two sides, give people more options.
Reply With Quote
     
     
  #13  
Old Posted Feb 14, 2013, 3:10 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by waterloowarrior View Post
most depressing thing I read in that report: we're three weeks from the SEVENTH anniversary of the NCC-Claridge Agreement to develop Phase I of the Flats.
Reply With Quote
     
     
  #14  
Old Posted Feb 14, 2013, 9:13 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
The Alstom rolling stock is apparently going to be a new variant of the Citadis, to be known as the Citadis Spirit:

http://www.alstom.com/press-centre/2...s-for-ottawa-/

"The new Citadis Spirit that Alstom is launching in the North American market will have many features that accommodate Ottawa’s particular needs. Designed in a high capacity version, it will be able to operate in extreme winter conditions. It will also benefit from a top speed of 100 km/hour (65 mph), reducing travel time between suburban areas and the City Center. As all Alstom trams, it will have a full low-floor accessibility and onboard bicycle storage. Alstom will build the vehicles in America and assemble them in Ottawa."



http://www.alstom.com/Global/Transpo...rit_ottawa.jpg
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #15  
Old Posted Feb 14, 2013, 9:17 PM
gjhall's Avatar
gjhall gjhall is offline
Registered User
 
Join Date: Aug 2009
Location: Ottawa
Posts: 1,297
Quote:
Originally Posted by Dado View Post
The Alstom rolling stock is apparently going to be a new variant of the Citadis, to be known as the Citadis Spirit:

http://www.alstom.com/press-centre/2...s-for-ottawa-/

"The new Citadis Spirit that Alstom is launching in the North American market will have many features that accommodate Ottawa’s particular needs. Designed in a high capacity version, it will be able to operate in extreme winter conditions. It will also benefit from a top speed of 100 km/hour (65 mph), reducing travel time between suburban areas and the City Center. As all Alstom trams, it will have a full low-floor accessibility and onboard bicycle storage. Alstom will build the vehicles in America and assemble them in Ottawa."



http://www.alstom.com/Global/Transpo...rit_ottawa.jpg
Great find, thanks!
Reply With Quote
     
     
  #16  
Old Posted Feb 14, 2013, 9:23 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
that's a pretty sharp nose.
Reply With Quote
     
     
  #17  
Old Posted Feb 15, 2013, 3:40 AM
YOWetal YOWetal is online now
Registered User
 
Join Date: Oct 2006
Posts: 3,467
Quote:
Originally Posted by J.OT13 View Post
I agree; it would be wise to connect the two sides, give people more options.
I always prefer two exits as it cuts down on walking time. You quickly learn which end of the train to board for your destination. It is also nice to see an actual Market entrance, in addition to the Rideau Centre entrance.
Reply With Quote
     
     
  #18  
Old Posted Feb 15, 2013, 4:32 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,843
Quote:
Originally Posted by YOWetal View Post
I always prefer two exits as it cuts down on walking time. You quickly learn which end of the train to board for your destination. It is also nice to see an actual Market entrance, in addition to the Rideau Centre entrance.
For sure; the more entrances, the better. I hope that it also connects to the Bay and the Rideau Centre expansion's Ogilvy corner.

But I still think they should have full length concourses at all three downtown subway stations.
Reply With Quote
     
     
  #19  
Old Posted Mar 26, 2013, 1:17 PM
YOWetal YOWetal is online now
Registered User
 
Join Date: Oct 2006
Posts: 3,467
Quote:
Originally Posted by J.OT13 View Post
For sure; the more entrances, the better. I hope that it also connects to the Bay and the Rideau Centre expansion's Ogilvy corner.

But I still think they should have full length concourses at all three downtown subway stations.
Wouldn't this be substantially more expensive?
Reply With Quote
     
     
  #20  
Old Posted Mar 26, 2013, 2:33 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,358
Quote:
Originally Posted by YOWetal View Post
Wouldn't this be substantially more expensive?
Possibly, but it would be worth the money. Practically all the stations in downtown Montreal have full-length or centralized concourses. Track level platforms don't make for good decision points, there are people waiting or madly dashing to catch a train, and sudden rush of an exiting crowd when a train arrives. A poor hesitant clueless soul trying to figure out the right exit in the middle of this is either a nuisance or a hazard. It's best to keep it simple so that every stair/escalator from the platforms goes up to the same concourse where the choices for exits can then be made.

Looking at what's proposed, it doesn't seem like an unreasonable effort to unite the two concourses:
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:09 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.