I have only read partway through Daryl's analysis so far, but already it seems contrived and biased to me. For example, Daryl attacks the following Greer paragraph as misleading. To me the following paragraph is not misleading at all. It is self-evident that the NDP built the cheapest segment of the M-line without regard for its suitability in building the network or maximizing ridership.
|
You've got to remember that the plan was to create a network and not individual lines. Hence "T line."
The Millennium Line was built because a key cost savings factor was the ability to interconnect with the existing OMC. It was either get the Millennium Line built, or lose the rapid transit opportunities for the Phase II segments altogether. Phase I was a stepping stone to allow Phase II to move forward. The problem is that Phase II didn't move forward due to Liberal decision. I can see how building the Central Broadway segment first would have given the best in terms of generating the most benefits and having perhaps the best cost-benefit ratio, but then there would be no connectivity with the rest of the network which would've made for trouble in terms of things like where to store the trains, etc.
Quote:
|
I suspect that the Phase II segments were lumped together because both involved time-consuming tunnelling.
|
This as well. Bored tunnels on both segments could use the same TBM if planned/phased together; that may be a significant cost, time and hassle savings.
I would like to suggest that Greer's own statements are about just as unsourced and filthy if not more. Zassk, you might have not reached this part yet:
Quote:
|
Originally Posted by Greer
The SkyTrain analysis reduced the costs of stations by halving the length of platforms.(6)
(6) Reducing station platform length reduces the maximum capacity of the system, by limiting how many cars can be linked into one "consist" at a time. This assumption is an admission that the RTP expects demand to fall substantially below the capacity levels that a full SkyTrain could provide. Nevertheless they continue to cite greater capacity as proof of SkyTrain's superiority (see following discussion of capacity and ridership).
|
The footnote (6) is not a source for this claim but rather an explanation, meaning this is completely out of the water. It is very fishy. Firstly, I don't know how 160m platforms for LRT would even be suitable given that would be just about impossible on Central Broadway!? (that's longer than 5-car or even 6-car C-Train platforms, and C-Train uses 3 cars in a consist!) or how 40m platforms on a Millennium Line SkyTrain would make sense if the rest of the SkyTrain system is at 80m (and that would be 8m of wasted platform space since no consist properly fits 40m). Secondly, the immediate presumption is that reducing platform length reduces capacity because it reduces train consist size and ignores how grade-separation + driverless system allows trains to run much more frequently, to offset the capacity reduction of a shorter platform even if this were true.