There was a presentation before Moncton City Coincil this evening regarding the proposed North End Community Centre that may be built next to Evergreen Park School.
Because of input at public consultations earlier, it was proposed that it might be best to proceed with this project in two stages.
The first stage would encompass the building more as less as originally proposed:
This portion of the project would cost about $11M and would encompass things such as a cafe, walking track, climbing wall, active play areas, indoor rollerblading and skatebording facility, splash park, community meeting rooms etc. The building would also include the physical plant to support whatever is included in phase two of the project.
The second phase would include two of the following three proposals. There isn't the physical space at the proposed site for all three proposals. The possible components for phase two are a community swimming centre, an indoor tennis facility or a community hockey rink.
I kind of think the tennis facility is a given. It has community support and would be cheaper to maintain than either the rink or the pool. If I was to bet, I think there may be more support in the neighbourhood for the pool than the rink. As such, I will go out on a limb and suggest phase two will be the tennis facility and a pool.