Quote:
Originally Posted by Innsertnamehere
and Toronto will be improving it's Commuter rail greatly in the future. It was announced that the lakeshore lines will finally have half hourly service, and if Metrolinx can get their funding mechanism it will be receiving 15 minute service.
heck, if that happens we will have gotten WELL over 100km of BRT, about 80km of LRT, 28km of Subway, 2 U-Bahn style urban rail lines (Lakeshore east and west), an urban rail link to the airport, multiple GO extensions (plus 3 lines electrified), and insane levels of frequency increases on the GO lines. not bad for what will likely be about a 15 year period!
|
2 U-Bahn style urban rail lines? I suspect you mean S-Bahn, and even then, I disagree.
S-Bahn is a metro system that extends a long way from the city centre, not a high frequency commuter rail. The differences being that in the city centre it runs either underground or elevated with multiple distributor stops (rather than just a single downtown terminus), it's 100% electrified with EMUs and level platform loading, and its minimum frequency on individual lines (with are coupled in all but the farthest reaches from the city centre) is about 3/hour which is very low for a metro but still higher than the improved GO will be.
The GO lakeshore lines improvements will be wonderful and a long time in coming, but S-Bahn style they won't be.