Quote:
Originally Posted by VanK
I don't remember the details either but its something like the first 7,000 units built in the Capstan planning area have to contribute an $X,000 amount per unit built (not sales).. so you are correct it will take sometime before they get to that trigger point to actually build the station.
|
To correct my original post, I confirmed: It will be the first +/-3,250 units built in the Capstan planning area at an amount of $7,800 per unit. = $25,000,000 (trigger point) to fund the estimated cost of building the Capstan Station. Translink estimates this station will be built in about 15 years..