Quote:
Originally Posted by J.OT13
Here's something the city doesn’t seem to realize about the N/S questions about direct to downtown or transfer at Bayview; capacity doesn’t matter, we need just as much in either case. If N/S has to transfer, you need more trains on E/W.
|
Yes and no. The N-S line as designed was limited to what were then 2-car trains (60 m), and initially just 1-car trains; assuming that any future N-S line uses the same vehicles as the Confederation Line, we would be looking at 1-car/49 m trains running on it. The Confederation Line of course will be using 98 m trains, and ultimately ~120 m trains.
So while the total number of trains running through downtown would be the same whether there is interlining or transferring, the capacity running through downtown would in fact be greater with transferring since all trains would be full length trains.
You might ask why not redesign the N-S line for longer trains? I'd have to look through the N-S LRT EA again to see if that is possible in Riverside South (the CDP may not have sufficient space at all stations for longer platforms), but even if it is it would be wasteful of train capacity.
Quote:
If the system is fully grade separated (and maybe by then automated) you can just as easily have N/S connect to the Confederation Line to go downtown.
Furthermore, if you don't, you will;
a. lose ridership; who wants to transfer from bus (or park and ride) to train and then again to train for the last kilometer and a half?
|
People do that with the O-Train today and anyone who works in Hull also does something like that at LeBreton. A few people even take a bus to the O-Train at Greenboro, take the O-Train to Bayview, another bus to LeBreton and finally a bus to Hull (though if you're lucky the last two can be combined in the #105, at least the last time I checked).
Quote:
|
b. if I have been on a flight for whatever hours, I don't want to drag my luggage on a train, and then freeze/ stand in the rain/ stand in 40 degree weather to catch another train. I also don't want to walk on busy/slippery sidewalks (if the N/S train runs on city streets downtown) to my hotel.
|
At this point in time, we have no reason to believe or suspect that the N-S line will run on city streets downtown. The Peer Review Panel suggested that the Carling line run on the surface downtown, but that suggestion was never incorporated into the TMP.
But, frankly, unless your hotel happens to have direct access to a tunnel station, that is going to be something you would have to face anyway.
Quote:
|
c. if N/S does not have a direct service to downtown, Bayview will be over capacity with people from Bayview, riders from N/S and possibly STO riders from Gatineau crammed on one platform. With direct service, N/S stay in their trains and Gatineau/Bayview riders will have 2 platform options
|
Arguably that's not a terribly efficient arrangement having passengers having to decide which platform is going to be better.
The STO thing is an entire problem in and of itself because the STO has foolishly decided to build a busway rather than a light railway, creating the prospect of sequential transfers in short succession.
In addition, the possibility of overloading the west end versus the east end is all too possible if the N-S line from Riverside South uses the O-Train corridor rather than the Southeast Transitway corridor.
Quote:
|
d. if N/S has to transfer at Bayview, it will increase operational cost (and capital cost) by requirering more trains. Let me explain; if N/S connects to Confederation for a direct downtown service, you could have, say 6 trains N/S and 20 trains E/W. But if transfer is required, then you still need 6 trains N/S but you now need 26 trains E/W that will be running at lower capacity before Bayview.
|
But as I wrote above, you're also occupying 6 of the tunnel slots with shorter trains.
Quote:
|
And so I believe that the extra investment for a direct N/S to downtown connection is required, although it will be more difficult with the lower capacity (and the whole 98 m trains on 120 meter platforms!?) suggested by this design team. A solution could be putting the Citadis 98 meter trains into service on the N/S and buying new 120 meter trains, 4 x 30 meter cars, (and lengthening the E/W platforms) for the Confederation line.
|
The sorry truth of the matter is that the City has not really given much deep thought to how it is going to deal with a number of transit issues:
-Gatineau/STO - does everyone come in on the west side via Prince of Wales/Chaudière/Portage or do we attempt to balance Aylmer and Hull on one side (the west) with Gatineau on the east (say Macdonald-Cartier and/or the new bridge)
-load balancing downtown - as previous, but also what to do with traffic from Riverside South: via O-Train or via the Southeast Transitway; also how to connect a converted SE Twy into the Confederation Line at Hurdman
-serving outlying suburbs - via light rail, O-Train, busway (trunk vs express bus); dealing with transfers, where, nature of routes in the suburbs, etc
-Carling line - purpose, does it go downtown? if so, how? will it go on the surface?
-Rockcliffe base - how to serve with rapid transit, integration with other components of the network
Those are some of the basic questions on a rapid transit network that the City has never really given much thought about.