Quote:
Originally Posted by Prometheus
They definitely mixed up a lot of the slides and failed to include some others. Not very professional.
I would have been interested in hearing the city's argument (assuming it had one) why a Skytrain subway should be extended all the way to UBC but not now. According to page 10 of the presentation, UBC is already the 2nd biggest transit destination in the city (and those are figures from 2008, before Wesbrook Village and the numerous other developments that have occured--and will continue to occur--around the campus). The Broadway Corridor is third biggest transit destination. If the extension is not built all the way to UBC in this phase, it will just transfer the choke point from Commercial Street to Arbutus or Granville Street.
|
That would just be funding and phasing.
Taking the subway to Granville or Arbutus would be aimed at serving the Central Broadway office district (the goal of M-Line Phase II (which was also before the UBC U-Pass ridership explosion) - so you have that office commuter ridership removed from the "bottleneck" that would be transferring to rapid bus to UBC (which may be manageable until the next phase).
i.e. if UBC draws 80,000 trips and Central Broadway draws 80,000 trips, current transfer loads at Broadway & Commercial, if shifted west to Arbutus, could be halved (since only the UBC 80,000 would remain).