Quote:
Originally Posted by KHOOLE
Much thought and visionary planning has to be directed to the fact that more and more residential and commercial tall buildings are being built and will continue to be built south of Laurier West and that more and more potential transit users will originate over time much further away than the presently planned tunnel route.
Intensification has to be accommodated with rapid transit. That's a no-brainer. Putting the line on the surface at Albert for now, which is also closer to City Hall and the Provincial Court House, makes more sense. In time, the presently planned tunnel route will be obsolete because there will be less and less transit users along its route.
Will the residents of the Merit, SOHO Lisgar and Tribeca walk to Rideau and Nicholas or to Queen and O'Connor? Humm..!
|
The major advantage with the presently planned route is the catchment of the Rideau/Market area that will always have one of the highest riderships in the city.
And although Queen could be considered as possibly a bit too North, we have to remember why it was chosen; the tunnel can be kept much closer to the surface; one of the reasons the previous "cross country" route turned under buildings past Kent was to avoid deep underground utilities like the Bell Switching station, effecting both Albert and Slater. And having the tunnel under Laurier would have been too far south, serving mostly residential where the people will be walking North to their jobs as opposed to taking the subway.
And although I use to think that the CBD would eventually extend further South once demand warrants, it does not seem likely with the current condo boom between Gloucester and Lisgar. Future office space will likely be along the rail route at Tunney's, Bayview and St-Laurent stations.
And as for the idea that the Queen Street route will one day be obsolete because of a reduction of transit riders; that’s not possible, we have millions of square feet of office space and thousands of condo units on it now and the numbers will continue increasing in the next decade or two with Cathedral Hill, Broccolini and Claridge projects on Lyon, Place de Ville's Podium building and Phase III (Kent at Queen), the Re and many possible redevelopments like the 4 buildings on the same block as PdV III.
And as for surface rail on Albert; we cancelled the N/S LRT mainly because of the mess that surface LRT would have caused, and now we would have lost millions in inflation costs to build the 2006 plan (surface LRT) and 7 years in planning for a tunnel, that although not perfect, is far superior than any other plan since the 1960s Hammer report.