HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #5661  
Old Posted Nov 3, 2012, 9:39 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Can anyone tell me the max capacity (sitting + rush-hour standing) of CT's normal and articulated buses? I tried googling but got nowhere.

Also, any info on the daily ridership of the 301 line?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5662  
Old Posted Nov 3, 2012, 9:44 PM
Elbownian's Avatar
Elbownian Elbownian is offline
Registered User
 
Join Date: Feb 2012
Location: Beltline, Calgary
Posts: 174
Quote:
Originally Posted by DizzyEdge View Post
Can anyone tell me the max capacity (sitting + rush-hour standing) of CT's normal and articulated buses? I tried googling but got nowhere.
They don't exactly make this easy to find on the site. No info on standing room though: http://www.calgarytransit.com/html/seating_capacity.html
     
     
  #5663  
Old Posted Nov 3, 2012, 10:04 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
the CT site is pretty terrible.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5664  
Old Posted Nov 4, 2012, 3:54 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
can anyone tell me the total cost of station refurbishment/replacement for 4 car trains?

I've always been curious how much replacement of existing LRT stations after 30 yrs of use messes up the "LRT is cheaper than subway" equation when subway stations might last indefinitely (at least the structure itself)
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums

Last edited by DizzyEdge; Nov 4, 2012 at 6:31 AM.
     
     
  #5665  
Old Posted Nov 4, 2012, 6:24 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,611
The 5 car incremental cost is pretty high. The question is when is it worth it versus 4 car trains with increased frequency. Since to make either of those choices you need the 8th Ave subway, Heritage Drive crossing removal, likely some other grade separation removals.

At what ppdph the capital needs for grade separation becomes a wash between the two options I have little idea, but I doubt it is within even the 40 year time horizon.

Outside of that you have extending stations, moving crossovers, likely redoing the car barns if the storage lanes aren't divisible by 3, 4 and 5. You also have upgrading the electrical system, but depending on how exactly the system is designed if you are running the same number of LRVs simultaneously likely would need an equally capable system.

I doubt either choice would have frequency at a level where a new signalling system would be needed above and beyond what is needed for 4 cars.
     
     
  #5666  
Old Posted Nov 4, 2012, 6:26 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Ugh, sorry I totally mis-typed, I meant for 4 car trains. The current work being done. Basically it occured to me that the 'cheaper' option of LRT vs subway might not be so cheap if stations are replaced every 30-40 yrs.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5667  
Old Posted Nov 4, 2012, 7:02 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by DizzyEdge View Post
Can anyone tell me the max capacity (sitting + rush-hour standing) of CT's normal and articulated buses? I tried googling but got nowhere.

Also, any info on the daily ridership of the 301 line?
Quote:
Originally Posted by Elbownian View Post
They don't exactly make this easy to find on the site. No info on standing room though: http://www.calgarytransit.com/html/seating_capacity.html
This may not be completely accurate but it appears the #s (sitting + standing) are:

80 - 2010 Nova Bus Low Floor LFS
116 - New Flyer D60LFR (2007, 2008)

and for comparison sake

100 - double decker bus (eg, http://en.wikipedia.org/wiki/Alexander_Dennis_Enviro500 )
132 - Current TTC streetcar
205 - Current TTC articulated streetcar
231 - New TTC streetcars
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums

Last edited by DizzyEdge; Nov 4, 2012 at 7:14 AM.
     
     
  #5668  
Old Posted Nov 4, 2012, 7:06 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
So many questions tonight: how much % more transit traffic can centre street handle before basically failing?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5669  
Old Posted Nov 8, 2012, 1:21 AM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Does anyone know whatever happened to the Connect Card? I thought that was supposed to be rolled out in the Spring or Summer? Last update on the Calgary Transit site is from July 2012:

http://www.calgarytransit.com/html/connect.html
     
     
  #5670  
Old Posted Nov 8, 2012, 2:20 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Radley77 View Post
Does anyone know whatever happened to the Connect Card? I thought that was supposed to be rolled out in the Spring or Summer? Last update on the Calgary Transit site is from July 2012:

http://www.calgarytransit.com/html/connect.html
http://www.calgaryherald.com/news/calgar...it+swipe+card+program/7406211/story.html

guaranteed to be ready for the SETWAY opening.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5671  
Old Posted Nov 8, 2012, 2:50 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by Radley77 View Post
Does anyone know whatever happened to the Connect Card? I thought that was supposed to be rolled out in the Spring or Summer? Last update on the Calgary Transit site is from July 2012:

http://www.calgarytransit.com/html/connect.html
Its been plagued by technical issues (some say due to choosing the lowest bidder rather then someone who's built most of the rest of the electronic payment systems out there). Last I'd heard was maybe December, but likely spring.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #5672  
Old Posted Nov 8, 2012, 3:25 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Quote:
Originally Posted by mersar View Post
Its been plagued by technical issues (some say due to choosing the lowest bidder rather then someone who's built most of the rest of the electronic payment systems out there). Last I'd heard was maybe December, but likely spring.
Thanks mersar for the update! Interesting that payments from mobile phones for transit may replace both cash and cards. Maybe not now, but 10 years down the road...

http://english.peopledaily.com.cn/90001/90776/90882/7391806.html
     
     
  #5673  
Old Posted Nov 8, 2012, 4:36 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by Radley77 View Post
Thanks mersar for the update! Interesting that payments from mobile phones for transit may replace both cash and cards. Maybe not now, but 10 years down the road...

http://english.peopledaily.com.cn/90001/90776/90882/7391806.html
The technology exist today, many new phones have NFC and can be used for this very purpose with the same readers that the non contact credit cards use, not sure if it's directly compatible with the connect system, but it likely is. I for one can't wait till Google Wallet launches in Canada!
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #5674  
Old Posted Nov 8, 2012, 5:34 PM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
Funny that the connect card discussion has come up, as the city just announced the cancellation of the program with the current supplier:

http://newsroom.calgary.ca/pr/calgary/calgary-transit-cancels-electronic-240651.aspx
     
     
  #5675  
Old Posted Nov 8, 2012, 5:43 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Bigtime View Post
Funny that the connect card discussion has come up, as the city just announced the cancellation of the program with the current supplier:

http://newsroom.calgary.ca/pr/calgary/calgary-transit-cancels-electronic-240651.aspx
I am hoping we get tap-in, tap-out capabilities. That would be great for data and analysis.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #5676  
Old Posted Nov 8, 2012, 8:00 PM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
Quote:
Originally Posted by Bigtime View Post
Funny that the connect card discussion has come up, as the city just announced the cancellation of the program with the current supplier:

http://newsroom.calgary.ca/pr/calgary/calgary-transit-cancels-electronic-240651.aspx
Herald has an article about it as well.

http://www.calgaryherald.com/news/calgar...ntract+after+repeated/7518617/story.html
     
     
  #5677  
Old Posted Nov 8, 2012, 8:57 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Bigtime View Post
Funny that the connect card discussion has come up, as the city just announced the cancellation of the program with the current supplier:

http://newsroom.calgary.ca/pr/calgary/calgary-transit-cancels-electronic-240651.aspx
I would think we are looking at least a year from now, then.
     
     
  #5678  
Old Posted Nov 8, 2012, 11:34 PM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Signs were posted at Lions Park today with renderings for the extension to a 4 car platform, with a construction start date of Spring 2013. The platform will be extended east, with the crosswalk and bus zone currently there relocated and expanded. It looks a lot like the Sunnyside extension, but without losing ramp access.
     
     
  #5679  
Old Posted Nov 9, 2012, 7:05 AM
AgentGibb AgentGibb is offline
Registered User
 
Join Date: Jun 2011
Posts: 48
Quote:
Originally Posted by mersar View Post
Its been plagued by technical issues (some say due to choosing the lowest bidder rather then someone who's built most of the rest of the electronic payment systems out there). Last I'd heard was maybe December, but likely spring.
It's unfortunate that it's gone so badly. Hopefully now that the contract has been cancelled we can go after something that's standard and proven like, say, this sort of thing:
http://www.calypsonet-asso.org/index.php

As someone who works on embedded systems for a living, I find it baffling that this should be so hard. It's been done before. Many. Times. No need to reinvent the wheel.
     
     
  #5680  
Old Posted Nov 9, 2012, 2:39 PM
eggbert eggbert is offline
Registered User
 
Join Date: Jul 2008
Posts: 272
Global News this morning reports it will be two years before a replacement system is in place.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.