The casino isn't closing, the racetrack and their slots have closed. I have a hard time believing that Caesars will close, although their revenue has fallen over the last few years. They still have a fairly healthy business, and are voted #1 consistently out of the local casinos here and in Michigan.
Reply With Quote
     
     
  #1542  
Old Posted Oct 1, 2012, 4:54 PM
Riversideguy Riversideguy is offline
Registered User
 
Join Date: Dec 2011
Posts: 34
"OK". I stand corrected. City Council will be discussing the new LED Scroll, Digital TV, and Stationary sings for the new Windsor Star Building. They must decide tonight if they will be willing to make some changes to the sign bylaw to alow it. Item 11 on tonights agenda.
Reply With Quote
     
     
  #1543  
Old Posted Oct 6, 2012, 1:52 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
An interesting article popped up in the Windsor Star today talking about the Paul Martin Building on Ouellette. There has been scaffolding surrounding the building for years now indicating that there is work being done there, but no, there is no work being done to it and the feds have the scaffolding up so as to protect passers by from falling limestone. Everything regarding the building is now in limbo and supposedly the feds are considering selling the building..

source:http://blogs.windsorstar.com/2012/10/05/67977/





Quote:
Paul Martin Building reno on hold while feds ponder selling

Downtown watchers were upset and surprised to learn Friday that the scaffolding surrounding three sides of the federal Paul Martin Building for the last two years is not a temporary measure needed for renovations, but a safety precaution to keep deteriorating limestone panels from crashing down on pedestrians.

A major and expensive rejuvenation – which involved removing some of the thousands of limestone pieces, cleaning them, chipping off the mortar, installing new backing on the building and then reapplying them – has been put on hold while the government decides whether to sell the landmark 1933 building, Meeta Gandhi, the regional communications manager for the government landlord, Public Works and Government Services Canada, told The Star.

She wouldn’t say who may be interested in buying it. “All options are being considered.”

And there’s no timeline for when a final decision will be made. In the meantime, the needed work on the building remains in a holding pattern. She didn’t have a dollar figure for the work.

“It would be considerable, and so in order for us to invest that kind of money on three sides of a building, when we haven’t made a final decision on what we are doing with the building, that wouldn’t be prudent.”

Downtown business people don’t like how these scaffold tunnels mar the downtown’s streetscape and discourage pedestrian traffic, but they’re tolerated because they signal that good things – renovations and construction – are happening, said Downtown Windsor Business Improvement Association chairman Larry Horwitz.

“We assumed there was construction going on, you kind of bear with it, but if there isn’t construction going on … it’s kind of ridiculous,” he said.

“If it’s just staying there, it’s an eyesore and it’s not fair for the merchants around it because it creates a dead zone all around that structure.”

People don’t want to walk under it, so they stay away, he said.

The scaffolding covers all of the limestone facade on the building’s Ouellette Avenue, Pitt Street and Chatham Street sides.
Once the city’s main post office, it is now home to Revenue Canada employees, plus Canada Post workers in the rear of the building. It’s named after the late Paul Martin Sr., the legendary Windsor MP who served as an influential cabinet minister and was the father of former Prime Minister Paul Martin Jr.

“It’s a major block and a major building,” said Horwitz. “This is the federal government. Something has to be done, it’s not like they don’t have resources.”

Joan Shanfield, whose Shanfields-Meyers Jewelry and China store is located across the street from the building, has been asking herself: “Why is it taking so long?”

Learning that there’s no work being done or even approved for the building, she expressed frustration. “It’s a fiasco, it’s an eyesore, it’s ugly,” Shanfield said of the scaffolding.

Mayor Eddie Francis did not return telephone messages left Thursday and Friday, seeking comment on whether the city is interested in buying the building.

Coun. Fulvio Valentinis, who represents the downtown area, has been hearing complaints about the length of time the scaffolding has been up and the lack of progress at the site.

“This is our main street and this is a very prominent building,” Valentinis said. He’s heard rumours that the government may be disposing of the property, an issue that cropped up as early as 2004 when the building was on a list of 365 federal properties the government was looking at selling and then leasing back.

But he added that the downtown is in the midst of lots of construction activity. The new aquatic centre’s being built, the former Palace Theatre building is being transformed into the new home of The Windsor Star and plans are afoot to renovate the current Star home, the old Greyhound station and downtown Armouries building into University of Windsor locales.

“I think we’re going to have to put some pressure on the federal government to get moving on this,” Valentinis said.

MP Brian Masse (NDP – Windsor West) said the length of time the scaffolding has surrounded the building – with no activity – is getting outrageous.
He said people have become so used to seeing the scaffolding they don’t think about it as a downtown eyesore.

“Walls are crumbling and their solution it to put a tent up and leave it for us as a community – frustrating,” Masse said.

He said his office would be investigating what’s happened to the project. “It’s not fair to the downtown merchants.”

The government spokeswoman, Gandhi, she said there has been no instances of limestone falling from the building, and that inspections are conducted monthly.

“Ultimately, we take the safety of people who work in the building and the people who visit the building into serious consideration and we want to make sure there is some preventative measure should there by any kind of issue with the limestone.”

The initial work on the building’s outside began in 2009 as part of a $1.9-million makeover. But only one side of the building was part of that work, which was completed in 2010. The three other sides were part of a new project which was put on hold last year, according to Gandhi.
I'd like to see this building restored.

Secondly, isn't it ironic that Shanfield's is taking stabs at the feds for the state of the building when Shanfield's itself is a blight on the downtown.

See the link here where we discussed the ugliness that is Shanfield's.

http://forum.skyscraperpage.com/showthread.php?t=193569&page=10
Reply With Quote
     
     
  #1544  
Old Posted Oct 7, 2012, 2:18 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Update on the new Windsor Star/Palace renovation. It looks like the developers restored one side of the old Palace sign and it will be hung up inside the Windsor Star's new newsroom.

The Windsor Star is also in the process of reusing one of their old crabtree printing presses as a focal piece in their new offices. You can see it starting in the second picture they are mounting it in the middle of the main stairwell.

source: http://www.windsorstar.com/news/Updated+Photos+With/7346593/story.html




crabtree printing press











Reply With Quote
     
     
  #1545  
Old Posted Oct 11, 2012, 4:40 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Here's a snapshot update of the Aquatic Centre from the webcam on top of the art gallery. They are starting to pour the footings for the eastern (water park) portion of the building finally. Last week the Myrtha pool was delivered.

source:http://www.citywindsor.ca/mayorandcounci...Pages/Family-Aquatic-Complex-Camera.aspx

Reply With Quote
     
     
  #1546  
Old Posted Oct 22, 2012, 6:35 PM
Riversideguy Riversideguy is offline
Registered User
 
Join Date: Dec 2011
Posts: 34
Riverside Plaza

Hello all.

I noticed some reno's taking place at the old Shoppers in the Riverside Plaza between Giant Tiger and Dollarama. Any info as to what will be going there?
Reply With Quote
     
     
  #1547  
Old Posted Oct 22, 2012, 8:13 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Quote:
Originally Posted by Riversideguy View Post
Hello all.

I noticed some reno's taking place at the old Shoppers in the Riverside Plaza between Giant Tiger and Dollarama. Any info as to what will be going there?
Yup. The Pet Value store currently located on Lauzon @ Little River Blvd is moving into one half of the old Shoppers in the east Riverside plaza and a video rental store is moving into the other side.

The new pharmacy converted from a Mac's is more or less finished @ Wyandotte & Prado.

I also noticed a little further east on Wyandotte near some older 9 storey apt buildings on the north side of Wyandotte an old vacant bush lot that long stood for sale is now being cleared and leveled for something, dunno what though.

There's also some new shop under renovation in the eastern part of the olde riverside town centre, near Mrs. Jones Cheesecake, a few doors west of there.
Reply With Quote
     
     
  #1548  
Old Posted Oct 23, 2012, 4:33 PM
Riversideguy Riversideguy is offline
Registered User
 
Join Date: Dec 2011
Posts: 34
Quote:
Originally Posted by Symz View Post
Yup. The Pet Value store currently located on Lauzon @ Little River Blvd is moving into one half of the old Shoppers in the east Riverside plaza and a video rental store is moving into the other side.

The new pharmacy converted from a Mac's is more or less finished @ Wyandotte & Prado.

I also noticed a little further east on Wyandotte near some older 9 storey apt buildings on the north side of Wyandotte an old vacant bush lot that long stood for sale is now being cleared and leveled for something, dunno what though.

There's also some new shop under renovation in the eastern part of the olde riverside town centre, near Mrs. Jones Cheesecake, a few doors west of there.
Thanks a lot good info nice to see a movie store move in. A lot of work in the area going on. Noticed they demolished some homes next to Jannise Towers on Wyandotte eash near Metro.

Now I just wish somthing would go into the Old Mac's at Riverside and Lauzon.
Reply With Quote
     
     
  #1549  
Old Posted Oct 23, 2012, 9:15 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
University of Windsor's new parking garage & visitor's centre going up next to the new engineering building.

source: http://windsorite.ca/2012/10/towering-st...-campus-for-new-uwindsor-parking-garage/

Quote:
If you’ve been at the University of Windsor campus lately, you may have noticed that a new, multi-level parking garage is starting to take shape — seven stories above ground.

Newton Parking Structures Ltd started building the parking garage and adjoining Innovation Centre in July and only last week did it become apparent to pedestrians that the building is destined to be of a great height.

Originally announced last December, preliminary work commenced on the project in May and construction crews built foundation and ramps for the main floor of the parking garage.

The parking garage will consist of 1,055 spaces and displaced an existing Faculty and Staff surface lot. Two separate buildings will be constructed as part of the complex and will be connected by a second-storey pedestrian bridge from the Innovation Centre to the parking structure.

The Innovation Centre will front Wyandotte West and will become the new home of Campus Community Police, Parking Services and other campus services. The University plans to centralize some of the existing surface lots on campus into the new parking structure, making the campus a much friendlier pedestrian area.

The new parking garage will add approximately 300 spaces to campus and will bring the total amount of parking spots available up to 3,000.

Both buildings are planned to be completed by Summer 2013.


Reply With Quote
     
     
  #1550  
Old Posted Oct 23, 2012, 9:17 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Looks like the city is going to close the intersection of Provincial and Cabana soon for a month. Let the mayhem begin

source: http://blogs.windsorstar.com/2012/10/23/city-to-shut-down-busy-intersection/



Quote:
One of Windsor’s busiest intersections will be shut down to traffic for a month in order to complete road work before the onset of winter.

“We need the public’s patience — this is our only chance of getting it done,” said city engineer Mario Sonego.

The intersection at Cabana and Provincial roads is undergoing an $12.4-million upgrade intended to end the years of daily traffic bottlenecks.

Because of work delays, Sonego said the choice was between shutting down traffic completely in order to rush completion of the project, or shut down the project for the winter and complete it by next summer.

The intersection will close Nov. 1.

“The longer we push this back, the more costly it gets,” said Mayor Eddie Francis. “If we push it through now, it can be done by Dec. 1.”

Sonego said about 35,000 vehicles cross that intersection in an average day. Limited traffic flow has been allowed to continue through the construction period which began in the spring, but there was a previous one-week traffic shutdown in the summer that triggered “chaos” for commuter traffic.

“Now, you can snake your way around the construction — but that’s being cut off,” said Sonego. Francis said it will be “one month of pain.”

The problem, said city officials, began with scheduling delays in getting the complicated pre-construction utilities and service work completed. Francis said contractor Coco Paving Inc. was to have begun its $8.2-million roadwork portion of the project by June 1, but wasn’t handed control of the site until July 18. Union Gas is being blamed for that delay.

“Scheduling is an important part of the job,” said Francis. “It takes a lot of co-ordinated effort by the city, the contractor and the service providers … it’s why (the start of) this was delayed by a year and a half,” he added.

There will be continued vehicle access to adjacent businesses. Traffic signs indicating detour routes will be going up in the next couple of days.

And then the return to traffic chaos and commuter horror begins in earnest on the morning after Halloween. Sonego said the contractor will be “pushing pretty hard.”

And when it’s over, “it will be an immense improvement” for motorists using that intersection, said Sonego. Some work will probably still have to wait until the new year, including sidewalks and landscaping, he added.

Part of the reason to go all-in for the next month is also to stave off any potential litigation in the event of a winter-long holdup.

“Could there be claims against us? Yes,” said Sonego.
Reply With Quote
     
     
  #1551  
Old Posted Oct 24, 2012, 10:49 PM
SignalHillHiker's Avatar
SignalHillHiker SignalHillHiker is offline
I ♣ Baby Seals
 
Join Date: Jul 2012
Location: Sin Jaaawnz, Newf'nland
Posts: 36,272
Greedy U.S. billionaire urges Michigan voters to reject FREE bridge to Canada

Interesting look at an issue I only learned about tonight.
__________________
Note to self: "The plural of anecdote is not evidence."
Reply With Quote
     
     
  #1552  
Old Posted Oct 24, 2012, 11:11 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Quote:
Originally Posted by SignalHillHiker View Post
Greedy U.S. billionaire urges Michigan voters to reject FREE bridge to Canada

Interesting look at an issue I only learned about tonight.
This has been going on for almost a decade!
Reply With Quote
     
     
  #1553  
Old Posted Oct 24, 2012, 11:14 PM
north 42's Avatar
north 42 north 42 is offline
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,932
He's a horrible man who thinks he can buy anyone and everything. He is willing to destroy the State of Michigan by holding back this very important piece of infrastructure that is so badly needed by both countries. I hate this evil person so much, I reuse to ever go on his bridge again.
Reply With Quote
     
     
  #1554  
Old Posted Oct 25, 2012, 8:18 PM
Blitz's Avatar
Blitz Blitz is offline
Registered User
 
Join Date: Jul 2001
Location: Windsor, Ontario
Posts: 4,628
Can you believe the absurd commercials you're seeing about it? Unbelievable that they can get away with spreading so many lies. American politics is insane.
Reply With Quote
     
     
  #1555  
Old Posted Oct 25, 2012, 10:03 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Matty Maroun is getting hit with a lawsuit for selling non-compliant gas at his duty free plaza.

http://blogs.windsorstar.com/2012/10/25/75496/
Reply With Quote
     
     
  #1556  
Old Posted Oct 27, 2012, 12:18 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Work has begin on the tunnel plaza expansion downtown.

source: www.windsorstar.com





Gotta love the classic Pontiac in this pic



Here's a pic from a few weeks ago when they had the mason who built the mural at Wyandotte & Goyeau dismantle the mural to be relocated at a yet to be decided new location
Reply With Quote
     
     
  #1557  
Old Posted Nov 3, 2012, 9:53 AM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Here is a recent article talking about the opening of the new downtown St. Clair student centre {St. Clair College TD Success Centre) located in the former TD Bank building at Victoria & University. Apparently the college is looking to aquire more property in the downtown core.







source: http://blogs.windsorstar.com/2012/11/02/st-clair-unveils-new-downtown-student-centre/

Quote:
St. Clair College hopes to take over another downtown building

Another downtown building is being targeted for a St. Clair College takeover, with hope for at least a couple of hundred more students coming into the core by next fall.

The college is looking for the city to donate the unidentified building, according to college president John Strasser, who hopes the city and college can hammer out a deal in the coming weeks.

“We already know where the building is, it’s just a matter of having the right deal,” Strasser said.

The deal needs to be done by around Christmas so the students in a particular program can start using it next fall, said the president, speaking after the unveiling of the college’s latest downtown addition, the TD Student Success Centre, a former TD Bank building at University and Victoria avenues.

Donated by TD and renovated and furnished for between $750,000 and $1 million, it provides 87 computer terminals, a cozy upstairs lounge, a kitchen, tutoring space and meeting rooms for the 1,000 college students already located in the core.

They are located in buildings also provided by the city – its former Cleary Centre (now the St. Clair College for the Arts) and the former Salvation Army building (now the MediaPlex) at University and Victoria.

The student centre is something Strasser wanted ever since he first contemplated a downtown campus more than five years ago.

“And it’s just part of it, it’s not the end of it, with the university coming on board (the U of W is bringing about 1,500 students and faculty to three renovated downtown buildings by 2014), and the college looking for more places in the downtown area,” he said.

The total number of students in the downtown will reach well over 2,000, which Strasser believes is the “critical mass” needed to kickstart downtown revitalization as shops, restaurants and housing flood in to service those new customers.

“Once you get past that 2,000, it’ll explode by itself, I truly believe it will,” he said.

Mayor Eddie Francis confirmed he and Strasser have been working on a deal. “We’re not there yet, we’re getting close,” he said.

He also wouldn’t identify the building the college wants.

“We do own some space, that space is something the college has looked at and I’ve now heard back from the college this morning,” he said Friday. “So I’ve got some work to do on my end. We’ll get there.”

What building the city and college are talking about is a bit of a puzzler to downtown watchers. In the area around the educational cluster that includes the college’s St. Clair Centre and MediaPlex, and the university’s future locales – the Windsor Star building, the downtown armouries and the former Greyhound station- the only nearby city-owned buildings they could think of are parking garages with retail space on the ground floor.

Other possibilities are either farther afield (the main library branch, city hall, the downtown Enwin building) or owned by other levels of government, such as the federally owned property at 441 University Ave. W. and the federal Paul Martin Building, which Strasser said is not being considered.

But downtown business improvement association president Larry Horwitz said if the two sides can work out a downtown deal, “I’m 100 per cent behind the city giving them any building they own.”

More students and faculty creates a buzz and increases pedestrian traffic, he said.

“It’s extremely important that they do this because the downtown has been known as a party town, sin city, a place you go to get drunk, and this is one of the most dynamic, most important changes to the fabric to the downtown.”

The city should fill up every building it has with students, he said. “We’ll go from a sin community to a smart community that easy.”

With about 1,000 students in the core already, Horwitz said there’s already been a gradual flow of small businesses opening up recently, including a women’s resale shop, a juice shop, a cafe, a jewelry store and a burger joint. The BIA loses money when the college moves into a building previously occupied by a business because the college doesn’t pay a BIA levy, he said.

“But what we get in return – pedestrian traffic, shoppers, residential, a reason for people to open up shop – more than compensates.”

The students arrived about five years ago, and have now surpassed 30,000 student months, Strasser said. “I believe that’s a significant boost to the city’s core.”

Francis recalled sitting down with Strasser, U of W president Alan Wildeman and Finance Minister Dwight Duncan when they were initially planning this downtown education cluster by moving tacks around on a downtown map.

Now you can look to the north (from the student centre) and see the MediaPlex, and to the east to see the revitalized Capitol Theatre, the soon-to-be renovated armouries, and the new home of the Windsor Star at Ouellette and University.

“You can see the vision now coming to life,” the mayor said. “And that vision was made possible because of the college.”
When the university opens it's 3 new downtown locations in the next few years there is going to be quite a significant surge of students in the core.
Reply With Quote
     
     
  #1558  
Old Posted Nov 3, 2012, 6:48 PM
cbyrne2014 cbyrne2014 is offline
Registered User
 
Join Date: Mar 2012
Location: London, Ontario
Posts: 44
Fantastic news!

I really get his sense that downtown is starting to turn a significant corner.

Back home for the first time in couple months today. Was downtown earlier this afternoon and am impressed the progress.

It's fun to see this transformation take place before our eyes and I cannot wait to see how things shape up once the university moves in.
Reply With Quote
     
     
  #1559  
Old Posted Nov 3, 2012, 9:10 PM
north 42's Avatar
north 42 north 42 is offline
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,932


I feel the same way about downtown finally starting to turn the corner. New smaller businesses are starting to open up, and there seems to be more foot traffic as well.

I'm super curious about what city building St Clair wants, And what they intend to do with it. Hopefully it's something creative in nature. I really think that once the University and College campuses are open and filled with faculty and students, we really will see the core transform into a much more revitalized area, with new shops and residents too.
Reply With Quote
     
     
  #1560  
Old Posted Nov 5, 2012, 5:38 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Windsor Star has posted a cool little time lapse video of work that is still being done inside the new Star building.

http://www.windsorstar.com/Moving+Windsor+Star+office+time+lapse/7499696/story.html



Speaking of time lapses, here is another cool time lapse done of the intersection of Ouellette & Park from a few months ago

http://www.flickr.com/photos/zapruderfilms/7812941094/in/faves-7507447@N06/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 2:36 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.