Quote:
Originally Posted by wong21fr
^Or for a future people mover to the rental car facilities.
|
Two AGTS tunnels will be built atop the train station on the third level but will not currently have a stop there; you'll still have to go into the main terminal to catch the AGTS train to terminals A/B/C. It could likely be extended to the rental car facilities in the future.
Level 1 will be the train station and hotel lobby with a drop off area for people arriving by car/taxi and where all public transportation will be relocated on the new T-1 Road between the main terminal and the new transit center/hotel. Level 2 will be hotel meeting rooms/ballrooms. Level 3 will have the AGTS tunnels and mechanical space. Level 4 will have a new security checkpoint.
Level 5 will be the primary entrance for people arriving from the airport as Level 5 is also the main floor of the terminal and baggage claim. This is also where there will be two new restaurants with outdoor patio seating on the covered plaza between the hotel and main terminal. Level 6 will be the main lobby and hotel bar/lounge. Levels 6-14 will have rooms with a pool/fitness center on 11.