HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #5321  
Old Posted Aug 23, 2012, 4:19 AM
artvandelay's Avatar
artvandelay artvandelay is offline
Registered User
 
Join Date: Dec 2007
Location: The City of Cows
Posts: 1,670
Quote:
Originally Posted by 5seconds View Post
Lowering the LRT speed in the new NE section because residents think it will kill someone?

http://www.calgaryherald.com/speeds+dropped+stations+after+residents+outcry/7130579/story.html

First, who approved that decision, and second, who ever allowed a Neighbourhood/LRT ROW to be designed in a way that would even raise that possibility?
90 to 50, brutal. I would be pissed if I was a commuter in the NE. Did the people who live in these communities not realize the massive LRT ROW through the neighborhood before they moved there?
     
     
  #5322  
Old Posted Aug 23, 2012, 5:02 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
This is a bit of theatre, really. The residents think that they have been given a concession, but the thing is that the trains would likely not be going much over 50 there anyway.

In almost every case, they would be slowing down to go through the switch to change sides to go into the station. For the trains headng inbound, they would still be accelerating out of Saddletowne Station at that point and staying at 50 or below wouldn't be much of a drop off in speed from where they would be anyway.

After Saddletowne is no longer the terminus over a decade from now, the speed through this section will probably be increased (perhaps not to the maximum) and not nearly as many people will be up in arms about it.
     
     
  #5323  
Old Posted Aug 23, 2012, 5:29 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by artvandelay View Post
90 to 50, brutal. I would be pissed if I was a commuter in the NE. Did the people who live in these communities not realize the massive LRT ROW through the neighborhood before they moved there?
It can't be from 90 kph, the trains can only go 80kph.

Hopefully, a review of the east road crossing through Martindale provides some changes that satisfy the community, and then the speed limit can be raised again.
     
     
  #5324  
Old Posted Aug 23, 2012, 2:45 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Ridership goals for Calgary Transit? The newest post on TransitCamp's blog:

http://transitcamp.ca/2012/08/23/ridership-goals-for-calgary-transit/
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #5325  
Old Posted Aug 23, 2012, 3:19 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by artvandelay View Post
Did the people who live in these communities not realize the massive LRT ROW through the neighborhood before they moved there?
Martindale has been around since the 80s. There is a good chance that up until 4 years ago all realtors were saying "don't worry about the LRT space, its a nice greenbelt and separation from backyard neighbours. The city has no plans to expand the LRT and no money to fund the expansion."

I remember looking at a place in the Hamptons about 14 years ago. The realtor mentioned that there was an LRT ROW close by, this was listed as a selling feature. Asked how the LRT was going to get across Nose Hill. Realtor mentioned a new LRT line up center street was going to be built " in the next 5-10 years."
     
     
  #5326  
Old Posted Aug 23, 2012, 3:49 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by fusili View Post
Ridership goals for Calgary Transit?
I would like to see a split ridership goal for Calgary Transit. Something like 60% of downtown destined commuters use transit plus 25% of non downtown destined commuters.

Alternately drop the downtown goal reference and focus solely on out of downtown commuters (e.g. Universities, high schools, office parks, industrial areas).
     
     
  #5327  
Old Posted Aug 23, 2012, 3:56 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Cage View Post
I would like to see a split ridership goal for Calgary Transit. Something like 60% of downtown destined commuters use transit plus 25% of non downtown destined commuters.

Alternately drop the downtown goal reference and focus solely on out of downtown commuters (e.g. Universities, high schools, office parks, industrial areas).
I thought of that too. Based on downtown transit growth, I can see 65% being a realistic goal for 2025. Its 51% already, and that is without the West LRT. I could see the SETWAY and one more LRT line by 2025 really pushing ridership up.

The real challenge will be the non-downtown growth. This is where I see upgrades to limited stop/BRT service really creating ridership to Universities/Hospitals/Business Parks/Industrial Areas.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #5328  
Old Posted Aug 23, 2012, 9:04 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Any update on the CONNECT card?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #5329  
Old Posted Aug 23, 2012, 11:20 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by DizzyEdge View Post
Any update on the CONNECT card?
Transit extended the testing period. There were some more bugs to work out. I'd expect by near the end of the year for full roll out. They really, really want to make sure it's working as flawlessly as possible before roll out because a lot of glitches would be very bad.
     
     
  #5330  
Old Posted Aug 23, 2012, 11:36 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by fusili View Post
I thought of that too. Based on downtown transit growth, I can see 65% being a realistic goal for 2025. Its 51% already, and that is without the West LRT. I could see the SETWAY and one more LRT line by 2025 really pushing ridership up.

The real challenge will be the non-downtown growth. This is where I see upgrades to limited stop/BRT service really creating ridership to Universities/Hospitals/Business Parks/Industrial Areas.
WLRT will move a lot of people from bus to train, but might take a while to move from car to train. To push 65% Downtown commute, one needs to get better service to a big car trip producing market. Only the SELRT has the potential to significantly impact car to transit migration. IMHO I don't think SETWAY could do the job (get to 65% transit ridership), only full builtout LRT line to Cranston will do and that is unlikely before 2025.
     
     
  #5331  
Old Posted Aug 24, 2012, 2:26 PM
Wigs's Avatar
Wigs Wigs is online now
Great White North
 
Join Date: Nov 2003
Location: Niagara Region
Posts: 16,235
Attn: SSP Calgary Transit geeks: We at FM now have a new shirt catering to you and your love for the CTrain! Check out our latest shirt- I (CTrain) YYC available in Men's http://bit.ly/MQxLzs or Women's http://bit.ly/P7Qbgq
coupon code: ssptransit for $3 off any order at checkout (shows up at bottom of page)

your fellow Calgarian/forumer,
Grant aka WIGS
__________________
"You can't have a strategy if you don't even have a policy"
     
     
  #5332  
Old Posted Aug 24, 2012, 3:54 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Temporary construction fencing is down at Martindale and Saddletowne Stations. Ticket vending machines are in place, the new traffic lights are operating.

At ready for the block party tomorrow and the start of service Monday morning.
     
     
  #5333  
Old Posted Aug 24, 2012, 4:07 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Noticed last night that quite a bit of work at Fishcreek-Lacombe for the new ramps and platform extension is underway. Plus the work at Heritage and Chinook and the south line will be a construction mess this winter and into next year.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #5334  
Old Posted Aug 24, 2012, 5:08 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
^I think Fish Creek and Heritage are supposed to be done by December 1st. Heritage for sure.

Those are awesome shirts WIGS.

Anyone else going to the NE LRT opening party tomorrow? I'll be going. Maybe some of us SSPers can meet up.
     
     
  #5335  
Old Posted Aug 24, 2012, 5:33 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
I was wanting to go but can't since I'll be somewhere between Nowhere, Sk and Middle of Nowhere, MB at the time.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #5336  
Old Posted Aug 24, 2012, 7:09 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by mersar View Post
I was wanting to go but can't since I'll be somewhere between Nowhere, Sk and Middle of Nowhere, MB at the time.
I'll be there in a week! Although most likely between Buttfuck, SK, and Armpit, MB. I take the scenic route.
     
     
  #5337  
Old Posted Aug 24, 2012, 7:42 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by frinkprof View Post
Anyone else going to the NE LRT opening party tomorrow? I'll be going. Maybe some of us SSPers can meet up.
I'll be taking my two kids. They are so excited for the bus shuttle ride on the way there. If you see a balding guy towing around a 5 yeard old girl and an almost 3 year old boy, that'll be me.
     
     
  #5338  
Old Posted Aug 24, 2012, 8:12 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Brand new C-Train Safety Video:

Video Link
     
     
  #5339  
Old Posted Aug 24, 2012, 11:13 PM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by mersar View Post
Noticed last night that quite a bit of work at Fishcreek-Lacombe for the new ramps and platform extension is underway. Plus the work at Heritage and Chinook and the south line will be a construction mess this winter and into next year.
Fish Creek and Heritage are both supposed to open this fall. This Sunday they'll be closing one track at Fish Creek to demolish the stairs from the south side pedestrian bridge.
     
     
  #5340  
Old Posted Aug 25, 2012, 2:21 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
I'll be up there to take pics and take in the festivities.
__________________
Stevinder.
* * * * * *
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.