Quote:
Originally Posted by UofC.engineer
Using the Dam would make a lot of sense for a SW BRT route, currently there is a large pipe across the dam which have to be relocated due to width requirements.
<snip>
In my opinion having the SW BRT going across the dam and using 14th street would be faster and attract a higher ridership than going to MRU and travelling via Crowchild trail.
On that note, I don't think the SW BRT should stop at MRU. A stop at MRU would take an extra 5-10 min longer to reach downtown and detract SW commuters from taking the BRT and instead use the LRT. The planned BRT station at Heritage or Rockyview would be a sufficient transfer point for MRU students.
|
The line proposed has two primary goals; an attractive commuter service from the SW (i.e. the communities between the Glenmore Reservoir and Fish Creek) to the downtown, and a high-quality connection to the MRU area, which includes an expanding corporate campus and a major future development in the Currie Barracks area. I wouldn't be surprised if these two transit markets were of similar size, especially in the long run; the SW communities aren't growing any more.
I don't think that going down 14th St would be any faster, given that it runs through residential neighbourhoods all the way. (Google Maps gives 11 minutes from MRU to downtown via Crowchild, and 16 from the dam causeway via 18th/14th St. Note that the BRT uses buses on the shoulders of Crowchild, so the traffic is much less of an issue.) You add back all of the time you save in not going out of your way to the MRU area, and I'd suggest that (in terms of catchment) the 26th and 33rd Ave stops are better on Crowchild, while 17th is a little better on 14th St.
Shaving two minutes off a half-hour run won't double the ridership, but skipping one of the two primary destinations will cut the ridership in half.
The dam may be an interesting way of avoiding congestion on the causeway, although given that huge pipe, there could easily be loads of technical issues around that. Any solution would need to have the pathway remain; it's a key north-south link and river crossing in the ped/bike network.
A solution that may make sense -- although it would be more complex for riders -- would to have half of the buses in the peaks run as "express" in one direction, skipping MRU on the northbound direction in the AM peak, and in the southbound direction in the PM. That would shave time off the SW-CBD commuter journey, but would keep the service on the CBD-MRU connection. But that means effectively 20 minute headways on SW-MRU journeys, which is hardly a BRT level of service. (If there was 7.5 min service, maybe this would work a little better.)