Quote:
Originally Posted by ByeByeBaby
I'm not sure who "we" is here building this "second core"; private developers will spend lots of money to build densely on expensive, accessible, in-demand land like downtown, and they will spend a little building cheap space on cheap suburban land, but no one who is motivated by profit will spend lots of money to build dense space in suburbs where they can't rent expensively. And our existing core took 50 years to build; spending decades building a dense office space in a random suburban location may be a nice ideal, but it doesn't make sense as a response to it taking 20 years before we can afford LRT. The Seton hospital took 5 years alone; the Bow, around the same. So a crash course of socialist office development would produce structures around 2020; the LRT on existing plans would be less than 10 years after that. And all of this is based on some sort of commuter service on what existing track? Certainly not the heavily used freight rail. I don't even think this plan would work in SimCity.
|
Actually given those critisms the idea is not as out to lunch as you think.
1) When I used the term core I was not referring a to density of the same scale as downtown has in present day but something of a smaller scale. The area north of douglasglen station already has some employment density. It would require some major shifts in who is occupying the buildings conversion of the existing industrial work yards attatched to the buildings to be redeveloped to medium rise buildings. Density is driven by both market and regulatory forces. Dismissing the possiblity in either of the sites being able to achieve lesser core status is not impossible in the short-medium term, given the density creep already happening.
2) Running commuter service on freight lines just like this is rather par for the course. The other half of this line has plans in the making for a commuter service out to Cochrane and with a potencial stop in Bowness. The West Coast Express in Metrovancouver runs along the tracks leading to Port MetroVancouver-Burrard Inlet (in a similar ball park in terms of volume on the line but may be less as the mainline splits to serve both Burrard Inlet and Deltaport though it having picked up more volume from the interior of BC)
The solution I offer is not anywhere near optimal. There are a lot of critisms that are possible but those are not on the highend of the spectrum in terms of critical issues with it. I'd be more concerned about whether the lack of network connectivity would be too big a blow to the ridership or whether the service would be time competitive. Serious questions whose answers would shape how close or far from the realm of reason the required density increases would be.
Anyone else have alternative ways of improving the transportation situation in the short to medium term different than default or mine?