HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #5081  
Old Posted Jul 18, 2012, 3:25 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Have to weigh it all in 'technology neutral tender'. I doubt the longer length for a given capacity of LRV would make it worthwhile, especially if the LRVs have to fit within a standard traffic lane width (if a staged approach is taken, which I doubt will happen).
     
     
  #5082  
Old Posted Jul 18, 2012, 3:37 PM
Doug's Avatar
Doug Doug is offline
Registered User
 
Join Date: Jul 2001
Posts: 10,046
How much headcount would the City need to whack to pay for SELRT? More funding from higher levels of government won't happen anytime soon and higher fuel taxes would be political suicide.
     
     
  #5083  
Old Posted Jul 18, 2012, 4:08 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Interesting article....

Quote:
Let the north-central LRT leg go first? Them’s fighting words to S.E. residents

Battle lines being drawn over the next CTrain expansion


By Jason Markusoff, Calgary Herald July 17, 2012

Despite the long-standing cries from Douglasdale and McKenzie Towne, the southeast LRT is no shoo-in as the next CTrain expansion project.

The numbers — both city council votes and otherwise — could tip the scales in favour of a north-central line up Centre Street N. becoming the next route after the west LRT is complete.

A council committee debates Wednesday a report predicting the southeast route may not be finished down to Seton until 2039. But residents in both corridors may also learn their place in the light rail pecking order this fall, when a draft priority list comes out.


Read more: http://www.calgaryherald.com/news/north+...sidents/6948924/story.html#ixzz20zV7F5UP
http://www.calgaryherald.com/news/calgar...hting+words+residents/6948924/story.html
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #5084  
Old Posted Jul 18, 2012, 4:47 PM
jeffwhit's Avatar
jeffwhit jeffwhit is offline
effete latte-lifter
 
Join Date: Jun 2004
Location: Aalborg, DK
Posts: 3,686
Quote:
Originally Posted by You Need A Thneed View Post
The bombardier looks too small for the SE or NC LRT. That aisle is pretty narrow.

It might be a good vehicle for the 17th AVE SE corridor transit way.
I would not want the C train to be any narrower feeling. The Montreal Metro and the Skytrain, for example are horribly cramped.
__________________
Arts!: Click to listen
     
     
  #5085  
Old Posted Jul 18, 2012, 5:25 PM
polishavenger polishavenger is offline
Registered User
 
Join Date: Oct 2002
Posts: 2,499
Quote:
Originally Posted by fusili View Post
I wonder how palatable it would be to do a special levy for the catchment area for each line in order to raise funds to build the LRT faster. After the line is built, revenues from operations could be used to pay back the home owners over time, or could go against property taxes for a few years.
     
     
  #5086  
Old Posted Jul 18, 2012, 5:38 PM
Calgarian's Avatar
Calgarian Calgarian is online now
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,121
So what they are considering for the SE LRT is to build a ROW that would just have busses running until such time as there is the demand / financing to convert it to an LRT line? I think this is a great idea actually.
__________________
Git'er done!
     
     
  #5087  
Old Posted Jul 18, 2012, 5:43 PM
eggbert eggbert is offline
Registered User
 
Join Date: Jul 2008
Posts: 272
My big question with this idea is when they decide to start building the LRT what happens to the buses using the ROW for the years and years of construction?
     
     
  #5088  
Old Posted Jul 18, 2012, 5:45 PM
shreddog shreddog is online now
Beer me Captain
 
Join Date: Sep 2003
Location: Taking a Pis fer all of ya
Posts: 5,522
Quote:
Originally Posted by eggbert View Post
My big question with this idea is when they decide to start building the LRT what happens to the buses using the ROW for the years and years of construction?
Someday Ottawa may be able to answer that exact question for us! Hopefully sooner than later.
__________________
Leaving a Pis fer all of ya!

Do something about your future.
     
     
  #5089  
Old Posted Jul 18, 2012, 5:45 PM
Calgarian's Avatar
Calgarian Calgarian is online now
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,121
Quote:
Originally Posted by eggbert View Post
My big question with this idea is when they decide to start building the LRT what happens to the buses using the ROW for the years and years of construction?
I would guess they would stop servicing the part of the ROW that is under construction. Probably would transfer to the regular road network while the first few stations are u/c.
__________________
Git'er done!
     
     
  #5090  
Old Posted Jul 18, 2012, 5:47 PM
Offside_Ref Offside_Ref is offline
Registered User
 
Join Date: Oct 2010
Location: East Van
Posts: 23
Thanks for the heads up. Does anyone know how they're going to turn around City Centre - McKnight trains? I couldn't see anything in those documents. If they're realigning the tracks west of 9th, does that mean the crossover would be out of commission? The only way of operating, from what I can tell, is have every westbound train use the NW (or do a turn-back at Sunnyside, which would be kind of weird). If so, 2 minute rush hour frequency sounds like a sweet deal for NW riders. Though, I can't imagine residents next to the line or those turning left from 19th St to 14th Ave (Lions Park) would like it as much.
     
     
  #5091  
Old Posted Jul 18, 2012, 5:53 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by Offside_Ref View Post
Thanks for the heads up. Does anyone know how they're going to turn around City Centre - McKnight trains? I couldn't see anything in those documents. If they're realigning the tracks west of 9th, does that mean the crossover would be out of commission? The only way of operating, from what I can tell, is have every westbound train use the NW (or do a turn-back at Sunnyside, which would be kind of weird). If so, 2 minute rush hour frequency sounds like a sweet deal for NW riders. Though, I can't imagine residents next to the line or those turning left from 19th St to 14th Ave (Lions Park) would like it as much.
Only the one track west of 9th needs to be realigned, the other is on the right alignment and already connected to the new track west of 10th. The last plan I'd heard was they were going to setup a temporary platform for the operator to be able to switch ends (probably made of scafollding) along the track that doesn't need to be relocated (I believe its the outbound track along the north side of the 7th) and then have the trains unload fully at 7th, go past 9th and use the crossover there, then go back to 8th and head back to the NE.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #5092  
Old Posted Jul 18, 2012, 6:27 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by polishavenger View Post
I wonder how palatable it would be to do a special levy for the catchment area for each line in order to raise funds to build the LRT faster. After the line is built, revenues from operations could be used to pay back the home owners over time, or could go against property taxes for a few years.
The special levy would require approximately $25,000 per home in the NC and SE area (based on TransitCamps numbers of following catchment area assumptions SE = 90K, NC 160k, 2 residents per home, plus an assumed 3B cost for the entire line). Further Calgary transit only recieves 47% of funds from the fare/customers, so it is not realistic that there would be excess funds to pay back the owners over time.

The SE LRT will always have the problem of economics and ridership for Inglewood to Douglasdale portion. NC LRT option does not have this problem.
     
     
  #5093  
Old Posted Jul 18, 2012, 6:39 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by polishavenger View Post
I wonder how palatable it would be to do a special levy for the catchment area for each line in order to raise funds to build the LRT faster. After the line is built, revenues from operations could be used to pay back the home owners over time, or could go against property taxes for a few years.
2nd follow-up. If you split the two lines, it might be possible to get the NC LRT line built with a special levy of 10-12k per household and even break down lower than 10k if one includes some of the areas conservatively allocated to the NW LRT catchment area by Transit Camp. At this point the special levy might be attractive to get NCLRT residents, especially those who all ready utilize BRT.

A combined special levy for NC and SE portions uses the greater catchment area in the North to subsidise the Industrial catchment area (bonnybrook, Alyth, etc) in the SE line. Any attempt to go through the special levy will split the city into North and South, like the US civil war the south is really going to lose badly under the present case scenario.
     
     
  #5094  
Old Posted Jul 18, 2012, 6:54 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by Cage View Post
The special levy would require approximately $25,000 per home in the NC and SE area (based on TransitCamps numbers of following catchment area assumptions SE = 90K, NC 160k, 2 residents per home, plus an assumed 3B cost for the entire line). Further Calgary transit only recieves 47% of funds from the fare/customers, so it is not realistic that there would be excess funds to pay back the owners over time.

The SE LRT will always have the problem of economics and ridership for Inglewood to Douglasdale portion. NC LRT option does not have this problem.
If they used the existing property tax system (residential and commercial) that $ figure would come down significantly. I wonder what a 10% increase in the property tax rate for the catchment area would raise over a couple of years.

Why would the city want to pay back a levy that built something that increased property values and made your home more desirable? Also as Cage mentioned there isn't money in the system to pay people back.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #5095  
Old Posted Jul 18, 2012, 7:23 PM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by mersar View Post
Only the one track west of 9th needs to be realigned, the other is on the right alignment and already connected to the new track west of 10th. The last plan I'd heard was they were going to setup a temporary platform for the operator to be able to switch ends (probably made of scafollding) along the track that doesn't need to be relocated (I believe its the outbound track along the north side of the 7th) and then have the trains unload fully at 7th, go past 9th and use the crossover there, then go back to 8th and head back to the NE.
You're absolutely bang on. They are replacing the north rails this weekend (just a replacment of old rails in the same spot). In September, they will be removing 10th Street Station and building motorman access stairs so the operator can continue to change ends where 10th Street used to be, but customers can not board or disembark there. Also in September, they'll be re-aligning the south rail and catenary to bring it in line with the inbound track from West LRT. This area will continue to be the end terminal for Trains and Operators until West LRT opens, save for a few weekend closures.
     
     
  #5096  
Old Posted Jul 18, 2012, 8:24 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by polishavenger View Post
I wonder how palatable it would be to do a special levy for the catchment area for each line in order to raise funds to build the LRT faster. After the line is built, revenues from operations could be used to pay back the home owners over time, or could go against property taxes for a few years.
Quote:
Originally Posted by Full Mountain View Post
If they used the existing property tax system (residential and commercial) that $ figure would come down significantly. I wonder what a 10% increase in the property tax rate for the catchment area would raise over a couple of years.

Why would the city want to pay back a levy that built something that increased property values and made your home more desirable? Also as Cage mentioned there isn't money in the system to pay people back.
This is possible, but it is patently unfair unless you apply similar levies to areas with existing higher order transit as well.

To make it less burdensome to existing home owners, you could put in land transfer taxes on a sliding scale away from higher order corridors, so the city can capture some of the value the infrastructure created after the fact. Would be immensely controversial however. Could even have it that each property only pays the tax the first time it is sold after construction is done.

Still, not very fair.
     
     
  #5097  
Old Posted Jul 18, 2012, 9:31 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,748
Quote:
Originally Posted by Full Mountain View Post
If they used the existing property tax system (residential and commercial) that $ figure would come down significantly. I wonder what a 10% increase in the property tax rate for the catchment area would raise over a couple of years.

Why would the city want to pay back a levy that built something that increased property values and made your home more desirable? Also as Cage mentioned there isn't money in the system to pay people back.
According to the City/s Annual Report for fiscal 2011, Net taxes available for municpal purpose amounted to 1.467 billion. This line item covers: property taxes, community revitalization levy, business taxes, revenue in lieu of taxes, and local improvement levies and special taxes LESS provincial portion of property taxes.

For arguement sake lets put the catchment area at a generous 40% of total city area. A 10% property tax increase (round up to 150 million) at 40% catchment area would yield additional revenue of $60 million assuming you could get the province to forgo its 1/2 share of revenue increase. Or about 50 years to pay off the debt associated with the SE/NC LRT.
     
     
  #5098  
Old Posted Jul 18, 2012, 9:31 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
This is possible, but it is patently unfair unless you apply similar levies to areas with existing higher order transit as well.

To make it less burdensome to existing home owners, you could put in land transfer taxes on a sliding scale away from higher order corridors, so the city can capture some of the value the infrastructure created after the fact. Would be immensely controversial however. Could even have it that each property only pays the tax the first time it is sold after construction is done.

Still, not very fair.
I don't think people would be too worried about fairness if they got it years sooner than they would otherwise.

Don't people closer to higher order transit already pay a premium due to the generally increased property values around these corridors?
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #5099  
Old Posted Jul 18, 2012, 9:39 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by Full Mountain View Post
I don't think people would be too worried about fairness if they got it years sooner than they would otherwise.

Don't people closer to higher order transit already pay a premium due to the generally increased property values around these corridors?
Yes. A zoned property transfer tax would transfer some of that value increase into the public purse. Economics says the owners would bare the burden of the tax, not the purchaser. Not that it is a good idea.
     
     
  #5100  
Old Posted Jul 18, 2012, 9:40 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by Cage View Post
According to the City/s Annual Report for fiscal 2011, Net taxes available for municpal purpose amounted to 1.467 billion. This line item covers: property taxes, community revitalization levy, business taxes, revenue in lieu of taxes, and local improvement levies and special taxes LESS provincial portion of property taxes.

For arguement sake lets put the catchment area at a generous 40% of total city area. A 10% property tax increase (round up to 150 million) at 40% catchment area would yield additional revenue of $60 million assuming you could get the province to forgo its 1/2 share of revenue increase. Or about 50 years to pay off the debt associated with the SE/NC LRT.
The city increasing the mill rate changes nothing about the rate that is directed to the coffers of the school boards. The rate is set independently.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.