HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #181  
Old Posted May 10, 2012, 3:33 AM
Wigs's Avatar
Wigs Wigs is offline
Great White North
 
Join Date: Nov 2003
Location: Niagara Region
Posts: 16,529
Quote:
Originally Posted by Wooster View Post
Yeah, I think those are the stripper poles.
I hope they were donated to the Calgary Historical Society
Reply With Quote
     
     
  #182  
Old Posted Jun 27, 2012, 10:54 PM
Canterra's Avatar
Canterra Canterra is offline
Registered User
 
Join Date: Mar 2005
Location: Calgary
Posts: 383
June 27 update

- demo still in progress
- picture by me
Reply With Quote
     
     
  #183  
Old Posted Jun 27, 2012, 11:04 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
^ looks like shoring has started.
Reply With Quote
     
     
  #184  
Old Posted Jun 28, 2012, 1:09 AM
CGY CGY is offline
Registered User
 
Join Date: Jan 2009
Posts: 11
I'm hoping someone with more knowledge in this area than I can help me out here... If construction (as opposed to simply demolition) is supposed to be starting soon, why did they fill in the hole from the parking garage at this site?
Reply With Quote
     
     
  #185  
Old Posted Jun 28, 2012, 3:33 AM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by CGY View Post
I'm hoping someone with more knowledge in this area than I can help me out here... If construction (as opposed to simply demolition) is supposed to be starting soon, why did they fill in the hole from the parking garage at this site?
Probably so that they can get the shoring closer to the edge of the site.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
  #186  
Old Posted Jun 28, 2012, 4:07 AM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by CGY View Post
I'm hoping someone with more knowledge in this area than I can help me out here... If construction (as opposed to simply demolition) is supposed to be starting soon, why did they fill in the hole from the parking garage at this site?
The drill rigs need a level, stable site to work from otherwise they tip over with the best of cows. Also the caisson walls preventing the site from collapsing in on itself during excavation are most effective from street level and not one storey down.
Reply With Quote
     
     
  #187  
Old Posted Jun 29, 2012, 5:53 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
hahaha love your new signature WhipperSnapper
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #188  
Old Posted Jun 29, 2012, 7:18 PM
evolv evolv is offline
Registered User
 
Join Date: Jan 2005
Location: Calgary
Posts: 372
Does anyone know when the spaghetti factory is shutting down?
Reply With Quote
     
     
  #189  
Old Posted Jun 29, 2012, 8:24 PM
eggbert eggbert is offline
Registered User
 
Join Date: Jul 2008
Posts: 272
I walked past the construction at lunch today, shoring is definitely underway. They've finished off the SE corner of the lot and they're working there way down 3rd Ave towards the Old Spaghetti Factory. The other building in the pictures above on 2nd Ave is completely down now, just debris sitting in the lot now.
Reply With Quote
     
     
  #190  
Old Posted Jun 29, 2012, 8:35 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by evolv View Post
Does anyone know when the spaghetti factory is shutting down?
It's not - until the second phase.
Reply With Quote
     
     
  #191  
Old Posted May 2, 2013, 10:20 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Pretty sure the info in this title could be updated to UC & Approved. I think they've even completed the first floor of parking!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #192  
Old Posted Aug 13, 2013, 4:42 AM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,268
Reply With Quote
     
     
  #193  
Old Posted Aug 13, 2013, 1:31 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Damn! I was just about to take new pics of it today! Well, the more the merrier! Great pics

I'm assuming it will be a steel-framed construction rather than concrete(other than the elevator core of course)?




EDIT: Does anyone have any insight as to when tower 2 may begin?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.

Last edited by Chadillaccc; Aug 13, 2013 at 1:57 PM.
Reply With Quote
     
     
  #194  
Old Posted Aug 13, 2013, 5:25 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
It seems weird to me that the elevator core seems to be rising right so close to the corner of the site.



From Canterra
Reply With Quote
     
     
  #195  
Old Posted Aug 13, 2013, 5:35 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
The tower's footprint only extends to about where the ramp is. The parkade for the first phase stretches below the podium which probably is being built to the edge of the footprint for the second tower.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #196  
Old Posted Aug 13, 2013, 11:14 PM
Bokimon's Avatar
Bokimon Bokimon is offline
Master and Commander
 
Join Date: Aug 2005
Location: CALGARY
Posts: 1,887
Don't forget about shadowing considerations when the tower was first designed. Its placement to that part of the site may of helped with achieving the height they wanted without any slicing and dicing by the nazis.
__________________
Follow @kimbo_snaps on Instagram &
Bokimon- on Flickr for SSP local & Travel coverage.
Architecture, Aviation, Scenery, Skylines
Reply With Quote
     
     
  #197  
Old Posted Aug 13, 2013, 11:34 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
So I noticed on a few other places the height is shown as 170m for the office and ~161m for the residential, would these be the official numbers or is it 161 &151 as shown on the front page??

Kind of disappointing this one and 3Eau-Claire haven't started yet. We need these kind of tall residential/mixed-use projects to be up there with the big boys. I'm hoping these projects along with Telus Sky is a start of a new 150-200m+ mixed-use trend!


Side note - NY's experiencing another glorious mega boom. Looks like they have about 10 amazing Supertalls in the works right. So awesome!!

Last edited by Spring2008; Aug 13, 2013 at 11:51 PM.
Reply With Quote
     
     
  #198  
Old Posted Aug 14, 2013, 3:33 AM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,198
Quote:
Originally Posted by Spring2008 View Post
So I noticed on a few other places the height is shown as 170m for the office and ~161m for the residential, would these be the official numbers or is it 161 &151 as shown on the front page??

Kind of disappointing this one and 3Eau-Claire haven't started yet. We need these kind of tall residential/mixed-use projects to be up there with the big boys. I'm hoping these projects along with Telus Sky is a start of a new 150-200m+ mixed-use trend!


Side note - NY's experiencing another glorious mega boom. Looks like they have about 10 amazing Supertalls in the works right. So awesome!!
Calgary definitely needs to embrace the mixed use model more!
__________________
Git'er done!
Reply With Quote
     
     
  #199  
Old Posted Aug 14, 2013, 4:59 AM
Bokimon's Avatar
Bokimon Bokimon is offline
Master and Commander
 
Join Date: Aug 2005
Location: CALGARY
Posts: 1,887
Yes they do ^
Shake off the draconian conservative approach to build 'safe' projects and take a gamble like what Le Germain did. Maybe some of us need to get into the developer side so we SSP multiverse folks can show these bland corporate folks how commercial real estate should be done in this city
__________________
Follow @kimbo_snaps on Instagram &
Bokimon- on Flickr for SSP local & Travel coverage.
Architecture, Aviation, Scenery, Skylines
Reply With Quote
     
     
  #200  
Old Posted Aug 14, 2013, 6:12 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Be BOLD!!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 11:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.