Quote:
Originally Posted by Illithid Dude
Hey circuit fiend, have they still been digging at the 1000 Danta Monica Blvd site, or was all that earth moving just a tease?
|
The dig now extends across the entire width of the property. Once that was accomplished, soil testing began in ernest. Other than that, nothing new.
I was on vacation all last week and upon my return, pretty much the same. The largest backhoe is gone, but we still have a smaller one and a bulldozer, although they've been parked on the side of the property and haven't moved. Workers have been in the trenches, cutting into the edges and drawing samples.
So, hopefully optimistic here. I can't imagine developers would go through with such an extensive dig without concrete plans to build something.
I'll post a pic later today, but it's nothing to get excited about. When activity picks up, I'll be sure to keep my fellow forumers informed.