Old Posted Apr 7, 2012, 11:57 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Latest.picture - by me

     
     
  #222  
Old Posted Apr 12, 2012, 12:10 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
down another level

     
     
  #223  
Old Posted May 1, 2012, 9:20 PM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,285




Pictures by me from the beginning of April.
     
     
  #224  
Old Posted May 15, 2012, 8:52 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
They are starting to remove the dirt ramp. - Time for concrete and foundations.
     
     
  #225  
Old Posted May 16, 2012, 12:16 AM
DrNest's Avatar
DrNest DrNest is offline
Registered User
 
Join Date: Jan 2012
Location: Toronto
Posts: 2,119
Great. Looking forward to seeing this one under construction.
     
     
  #226  
Old Posted Jun 11, 2012, 10:48 PM
JayCortese
Guest
 
Posts: n/a
.

Last edited by JayCortese; Sep 8, 2019 at 11:01 PM.
     
     
  #227  
Old Posted Jun 23, 2012, 5:14 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Quote:
Originally Posted by androiduk View Post
This pic is from a few days ago. A tractor trailer load of rebar was being offloaded onto the site today.


One Bloor from Androiduk at UT

http://urbantoronto.ca/forum/showthread....Gulf-Homes-70s-Hariri-Pontarini)/page197
     
     
  #228  
Old Posted Jun 24, 2012, 12:02 AM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688


It appears work on the caissons will soon commence.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #229  
Old Posted Jun 24, 2012, 1:52 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,885
indeed, it is finally U/C and can be moved!


from androiduk at Urban Toronto:
     
     
  #230  
Old Posted Jun 24, 2012, 6:55 PM
JayCortese
Guest
 
Posts: n/a
Quote:
Originally Posted by Innsertnamehere View Post
indeed, it is finally U/C and can be moved!


from androiduk at Urban Toronto:
They have one of those tall yellow machines at the argento site.
     
     
  #231  
Old Posted Jun 25, 2012, 3:25 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,161
I live in the neighbourhood and can confirm that they have stopped excavation work and have moved onto piling for the actual foundation. This one is now officially under construction so I'll move it over to the U/C section.
     
     
  #232  
Old Posted Jun 25, 2012, 7:16 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Quote:
Originally Posted by LeftCoaster View Post
I live in the neighbourhood and can confirm that they have stopped excavation work and have moved onto piling for the actual foundation. This one is now officially under construction so I'll move it over to the U/C section.
Caisson work has commenced. Let her rise.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #233  
Old Posted Jun 25, 2012, 10:28 PM
Gresto's Avatar
Gresto Gresto is online now
Registered User
 
Join Date: Jul 2009
Location: Toronto
Posts: 5,387
Any recent word on the 5-floor increase?
     
     
  #234  
Old Posted Jul 5, 2012, 3:12 PM
philofra philofra is offline
Registered User
 
Join Date: Feb 2011
Posts: 16
     
     
  #235  
Old Posted Jul 5, 2012, 7:59 PM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,285

Can't wait to see this one start to rise. It's been too long.
     
     
  #236  
Old Posted Jul 6, 2012, 1:33 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
     
     
  #237  
Old Posted Jul 19, 2012, 11:22 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Right now 1 Bloor is sinking caissons, and they're doing it above the elevation of the finished excavation because if they were to dig any lower they'd have a hard time getting the rigs out of the hole.
     
     
  #238  
Old Posted Aug 19, 2012, 10:08 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
The raft slab and cassion work to support the equipment has been completed. Also there will be a design change for the roof removing the sloping angle. More updates on construction to follow.
     
     
  #239  
Old Posted Aug 20, 2012, 3:27 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,161
Sounds an awful lot like they are removing the architectural feature on the roof to squeeze in a few more floors of condos.

What a shame.
     
     
  #240  
Old Posted Aug 20, 2012, 4:01 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,885
it is because they would have problems with the window washing machines, not because they wanted to squeeze more floors in. this is approved up until 291m, We don't have to worry about them cutting off the roof to squeeze in more floors. they would just tack on more height. (which is what they are doing)
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 9:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.