The Water Garden Pavilion/Mariner's Hall, Splash Pad and Baggage Building art centre have opened at Marina Park. By the looks of the news report video, it was pretty packed down there. The restauranteur that will be locating at Prince Arthur's Landing may also be named in the coming weeks.
Sleeping Giant Brewing Company has opened on Cobalt Cres. Hopefully it fairs a little better than past attempts in town to operate a local brewery.
The Grenwich Wind Farm in Dorion held its official opening yesterday. I didn't know it, but it is the first wind farm in the province to be built entirely on crown land. I am just impressed they got it finished given all the lawsuits and the general disaster that occurred during the development.
The Interim Long Care Centre in Mini-Queens Park on James St. is closing. The building is supposedly too old to continue to serve its purpose. The residents are going to move moved elsewhere. I wouldn't be surprised if there are budgetary reasons behind the decision as well. I am guessing those who live there will be moved to the new CEISS Centre eventually.
A conceptual drawing of what they new transit terminal may look like was released by Genivar and the city:
It sounds like the construction of the Hampton Inn at the airport won't begin until fall. I talked to someone with knowledge of the construction industry in Thunder Bay, and they seemed to think the ground breaking will occur after the summer season. A variety of issues surrounding the actual site of the proposed building is the cause. There is also still no action at the Marriott site across from Superstore. I am wondering now if there was some back room deal reached between the hotel developer and Loblaws that put a sudden end to the OMB hearing Loblaws requested that has slowed the project up. Maybe some changes were made to satisfy Superstore that require some alterations to the plans for the Marriott, thus requiring the architects and engineers to go back to the drawing board to make some changes.
The new TD Banking centre at the Harbour Expressway and Memorial Ave. is in trouble already, and it hasn't even opened. The building leaks like a sieve and the south elevator shaft is way out of plumb. Both the masonary contractor and the general contractor have gone AWOL on TD. Its also interesting to note that both those contractors came from down south, did the job as quickly as they could, and got out of town even faster. Hmmm... interesting... need I say more?
There is some action behind Superstore and the Nissan dealership on Gorham St. Several large piles of fill have been put there, and there are several pieces of equipment working. I am pretty sure its just a parking lot for Nissan, as they used the land for the purpose before, but time will tell for sure.