Old Posted May 3, 2012, 3:54 AM
Innersoul1's Avatar
Innersoul1 Innersoul1 is offline
City of Blinding Lights
 
Join Date: Feb 2007
Location: Calgary
Posts: 3,676
Quote:
Originally Posted by You Need A Thneed View Post
WEST LRT Project in Review 2011.

It does include a little blurb about the copper roofs.
Very Cool! I will note that the roof at Shaganappi is already turning green. Saw it with my own two eyes on the weekend.
__________________
Sweet dreams are made of cheese. Who am I to diss a brie?
Reply With Quote
     
     
  #1922  
Old Posted May 3, 2012, 2:24 PM
Calgarian's Avatar
Calgarian Calgarian is online now
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,180
So the roofs will turn green then, it will just take a long time. Sounds like the decision was due to to the low maintenance copper will require.
__________________
Git'er done!
Reply With Quote
     
     
  #1923  
Old Posted May 3, 2012, 9:36 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Calgarian View Post
So the roofs will turn green then, it will just take a long time. Sounds like the decision was due to to the low maintenance copper will require.
I think if the copper is used for a roof, and it eventually turns green, then it's not a bad choice. With Sunalta however, where the copper is basically the entire cladding of the station, they should have sealed it. Anyway, maybe once the WLRT is built and in use it can be revisited at a later time.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #1924  
Old Posted May 3, 2012, 10:40 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
This reminds me of the roof on the Cathedral north of Olympic Plaza.

Quite a few years ago, they spent a whack of money replacing the entire roof because minimal maintenance had been done since the building was completed in 1904.

The bright & shiny copper roof glistened in the sunlight, and everyone was happy they'd invested in a '100 year roof'. However, they skipped on sealing the copper, so within a few years it turned green.

Someone high-up in the church decided that a green roof was ugly, so more money was spent painting the green copper back to a reddish-copper colour.

Today, we can see the results of the bright prairie sun bleaching out the red. They now have a luvverly pink roof.

Until someone coughs up the bucks to paint it red or copper-red again ....

I wonder how much has been spent since they put on the low-maintenance copper roof.
Reply With Quote
     
     
  #1925  
Old Posted May 7, 2012, 2:18 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Enjoyed the warmer weather and my new DSLR camera on a photo walk along the entire West LRT route.

West Entrance at 69th Street Station.

WLRT-05062012-5 by srp775, on Flickr

East Entrance at 69th Street Station.

WLRT-05062012-6 by srp775, on Flickr

Looking eastward from Christie Park Gate.

WLRT-05062012-10 by srp775, on Flickr

Tracks near Sirocco Station.

WLRT-05062012-18 by srp775, on Flickr

Damaged Pathway, Deep Puddle. Some of the paving work done has signifigant cracks after the winter.

WLRT-05062012-17 by srp775, on Flickr

West entrance to 45th Street Station.

WLRT-05062012-25 by srp775, on Flickr

Interlocking east of 45th Street Station.

WLRT-05062012-28 by srp775, on Flickr

South entrance to Westbrook Station.

WLRT-05062012-34 by srp775, on Flickr

North entrance to Westbrook Station and TOD building work.

WLRT-05062012-40 by srp775, on Flickr

Activated signals near Shaganappi Point.

WLRT-05062012-41 by srp775, on Flickr

Sunalta Station. I wasn't the only photog taking pics here. Was it one of you guys?

WLRT-05062012-50 by srp775, on Flickr

11th Street West Station.

WLRT-05062012-53 by srp775, on Flickr

Rail connection made.

WLRT-05062012-57 by srp775, on Flickr

More pics from today: http://www.flickr.com/photos/lrtincalgary/sets/72157629617750876/
__________________
Stevinder.
* * * * * *

Last edited by srperrycgy; May 7, 2012 at 3:03 AM. Reason: Added link.
Reply With Quote
     
     
  #1926  
Old Posted May 7, 2012, 2:42 AM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
great photo update and congrats on the new camera!
Reply With Quote
     
     
  #1927  
Old Posted May 7, 2012, 2:45 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by Jimby View Post
great photo update and congrats on the new camera!
Thanks. I was in The Camera Store to buy a bag and I'm sure happy to have been hired full-time this week so I can afford more accessories.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #1928  
Old Posted May 7, 2012, 5:01 AM
The Chemist's Avatar
The Chemist The Chemist is offline
恭喜发财!
 
Join Date: Aug 2001
Location: 中国上海/Shanghai
Posts: 8,875
Great pictures - looks really close to finished.

How on Earth is it going to take nearly a YEAR before the WLRT is open to the public? It looks like it could be done in 4 or 5 months, at most.
__________________
"Nothing is too wonderful to be true, if it be consistent with the laws of nature." - Michael Faraday (1791-1867)
Reply With Quote
     
     
  #1929  
Old Posted May 7, 2012, 5:31 AM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
Exciting stuff, thanks for the picture tour!
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
  #1930  
Old Posted May 7, 2012, 2:05 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by The Chemist View Post
Great pictures - looks really close to finished.

How on Earth is it going to take nearly a YEAR before the WLRT is open to the public? It looks like it could be done in 4 or 5 months, at most.
Appearances can be deceiving. There is a lot of work to be done. Caternary is only up on the guideway to Shaganappi Point. The summer construction season is just starting and barring another Spring snowfall, will be very busy along the 8km route.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #1931  
Old Posted May 7, 2012, 7:48 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by The Chemist View Post
Great pictures - looks really close to finished.

How on Earth is it going to take nearly a YEAR before the WLRT is open to the public? It looks like it could be done in 4 or 5 months, at most.
The target opening is Dec 2012 (just before the Mayan Apocalypse).

The construction will appear to be done in the fall, but it will still take several months of commissioning and testing and training staff (ie: motormen) on the new facilities.

We'll even be teased by seeing trains running on the new line - but empty.

The NE extension opening will have to satisfy us all until then.
Reply With Quote
     
     
  #1932  
Old Posted May 7, 2012, 9:43 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by jsbertram View Post
The target opening is Dec 2012 (just before the Mayan Apocalypse).

The construction will appear to be done in the fall, but it will still take several months of commissioning and testing and training staff (ie: motormen) on the new facilities.

We'll even be teased by seeing trains running on the new line - but empty.

The NE extension opening will have to satisfy us all until then.
CT is still staying the target opening is now spring 2013, not December 2012 as it was previously planned for. Of course this may be to just make it look better when its actually ready in December, but every publication thats come out of the WLRT Project in the last 6 months has said 2013 now.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #1933  
Old Posted May 7, 2012, 10:01 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,084
Love the station designs and use of copper.

The pace of your WLRT is astounding.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #1934  
Old Posted May 8, 2012, 3:36 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Just for a comparison, the first test train ran on the Canada Line on April 1, 2008, but the line wasn't open until Aug 17, 2009.
Reply With Quote
     
     
  #1935  
Old Posted May 8, 2012, 1:35 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by nname View Post
Just for a comparison, the first test train ran on the Canada Line on April 1, 2008, but the line wasn't open until Aug 17, 2009.
That's good, but if you are comparing the two lines; it's apples and oranges. The Canada Line is automated and definitely required more test time. The West LRT isn't the same and won't need that much work to get up and running.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #1936  
Old Posted May 11, 2012, 4:47 AM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
Energized and tested tension lengths 2-4 today. Good to go. A test train will be escorted through soon!
Reply With Quote
     
     
  #1937  
Old Posted May 11, 2012, 1:18 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,599
Quote:
Originally Posted by lineman View Post
Energized and tested tension lengths 2-4 today. Good to go. A test train will be escorted through soon!
I was looking at the wires last time as in town, the elevated section between downtown and the Sunalta section seems to have extra heavy duty wire rigged. Any insight to why?
Reply With Quote
     
     
  #1938  
Old Posted May 11, 2012, 4:49 PM
MMMBeer MMMBeer is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 128
Latest update newsletter (May) is on westlrt.ca It's been a while since the last one (March).

Nothing earth-shattering in terms of developments as far as I could tell - probably why they waited 2 months since the last one.
Reply With Quote
     
     
  #1939  
Old Posted May 11, 2012, 6:27 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
I was looking at the wires last time as in town, the elevated section between downtown and the Sunalta section seems to have extra heavy duty wire rigged. Any insight to why?
I think it has too do with the increased power requirements of the 4 car trains, so they've run dual wire, lineman?
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
  #1940  
Old Posted May 12, 2012, 3:50 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Calgary Herald article reflecting the cost overruns and public art components. Interesting note, at the end they mention that a text train will be running on the completed section early next week.

http://www.calgaryherald.com/news/calgar...in%20west%20LRT%20tab/6609387/story.html
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.