HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9581  
Old Posted May 5, 2012, 2:10 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
I really hope the Capstan Way station funding model can be successful.
The budget shortfall for the Metrotown Station renovation can be partially resolved if the new developement like 'Silver', 'Metroplace' and 'Sovereign' can contribute to the cost as they all benefit from the proximity of the skytrain station.
     
     
  #9582  
Old Posted May 5, 2012, 2:44 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
^That is a good point, but most likely any increase in development costs will just be passed along to the consumer, driving up prices. Still if this is the only way to rehab the likes of Metrotown station, so be it. We will all be better off for it in the long run.

In other news, apparently Montreal is planning an elevated lrt line to its airport modeled on the Canada line. You know what they say, imitation is the best form of flattery...
     
     
  #9583  
Old Posted May 5, 2012, 3:34 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,106
ok this is probably dumb question, if i live in zone 2 (burnaby) and i want to go to zone 2 richmond, but i am going to travel through zone 1 Vancouver - can i do it on a 2 zone ticket or do i need a 3 zone ticket?
__________________
belowitall
     
     
  #9584  
Old Posted May 5, 2012, 3:41 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,019
Quote:
Originally Posted by vanman View Post
^That is a good point, but most likely any increase in development costs will just be passed along to the consumer, driving up prices. Still if this is the only way to rehab the likes of Metrotown station, so be it. We will all be better off for it in the long run.

In other news, apparently Montreal is planning an elevated lrt line to its airport modeled on the Canada line. You know what they say, imitation is the best form of flattery...
Talking about the Canada Line, small note.

I was at YVR last week and noticed they changed their way finding signs to say "Train to Downtown" from the old "Canada Line" messages.

A good move.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9585  
Old Posted May 5, 2012, 3:55 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Quote:
Originally Posted by SpongeG View Post
ok this is probably dumb question, if i live in zone 2 (burnaby) and i want to go to zone 2 richmond, but i am going to travel through zone 1 Vancouver - can i do it on a 2 zone ticket or do i need a 3 zone ticket?
Two zone, though I can't think of why you might think that it would require a three zone ticket.. could be one zone depending on where you board.
     
     
  #9586  
Old Posted May 5, 2012, 4:02 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,106
i thought so - i just thought i am crossing into one zone and back into another one

i want to buy a pass next month since i no longer qualify for a upass - damn having one of those was sweet

right now i am just using fare saver tickets to get around and am using two zone ones that i need

i used to drive to work in the past but its my first job downtown and its just not economical now
__________________
belowitall
     
     
  #9587  
Old Posted May 5, 2012, 8:11 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by Metro-One View Post
Talking about the Canada Line, small note.

I was at YVR last week and noticed they changed their way finding signs to say "Train to Downtown" from the old "Canada Line" messages.

A good move.
Yeah YVR revamped their signage. There's a lot more clearer signs now!
     
     
  #9588  
Old Posted May 5, 2012, 10:18 AM
rxp rxp is offline
Registered User
 
Join Date: Jan 2012
Posts: 111
Quote:
Originally Posted by deasine View Post
Yeah YVR revamped their signage. There's a lot more clearer signs now!
pics?
     
     
  #9589  
Old Posted May 5, 2012, 3:34 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by vanman View Post
^That is a good point, but most likely any increase in development costs will just be passed along to the consumer, driving up prices. Still if this is the only way to rehab the likes of Metrotown station, so be it. We will all be better off for it in the long run.

In other news, apparently Montreal is planning an elevated lrt line to its airport modeled on the Canada line. You know what they say, imitation is the best form of flattery...


Ain' it the truth !! Regarding this, I wonder what form of rail connection Toronto will use when it gets around to installing a rail link YYZ-downtown T.O.? It will simply have to be faster, sleeker, more frequent than the others because ... well, because, .... I mean we're talking about Toronto ... I mean it just HAS to be the snazziest, the best, ...
it just has to.... *1 (footnote)

(love the place anyway; Hi Kev, Hi Susan, Clare, wherever you are now ....)
*1: as declared by -unwritten but adhered to-Canadian Constitutional Law
     
     
  #9590  
Old Posted May 5, 2012, 6:30 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,106
they are planning a heavy rail i think which will be non stop to downtown
__________________
belowitall
     
     
  #9591  
Old Posted May 5, 2012, 7:03 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by SpongeG View Post
they are planning a heavy rail i think which will be non stop to downtown


Yeah, that fits.
     
     
  #9592  
Old Posted May 5, 2012, 7:10 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,106
although it sounds like it won't be happenning in our lifetime
__________________
belowitall
     
     
  #9593  
Old Posted May 5, 2012, 7:16 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by SpongeG View Post
although it sounds like it won't be happenning in our lifetime

Do you really think so? I would have thought they'd have started it in about 5 years, maybe 10 at the ouside! Wow, I guess I got something wrong. Why so long as you say, anyway? Are they going to build TGV's in a tunnel or what? Or is it just a case of awkward city infrastructure to get around of?
     
     
  #9594  
Old Posted May 5, 2012, 7:40 PM
cc85 cc85 is offline
Registered User
 
Join Date: Apr 2006
Location: Island City
Posts: 451
The Toronto AirRail Link's construction is underway.
     
     
  #9595  
Old Posted May 5, 2012, 9:30 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,102
It would be more of a Go train-styled (commuter) service, using DMU mostly on existing commuter track. There will be 2 intermediate stops between the airport and Union (downtown) stations. End-to-end travel time would be 25min and estimated ridership at the projected 2015 opening is 5000/day, with a train every 15 min.
     
     
  #9596  
Old Posted May 5, 2012, 9:43 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
http://upload.wikimedia.org/wikipedia/en/d/d8/Toronto_ARL.jpg

This is what the trains will look like, anyway.
     
     
  #9597  
Old Posted May 5, 2012, 10:29 PM
st7860 st7860 is offline
BANNED
 
Join Date: Nov 2010
Posts: 1,299
However regardless of whichever type of trains they chose for Toronto I don't think they'll be able to have a train pulling into the station as few as 20 seconds after the previous train left like what often happens with the skytrain in Vancouver.
     
     
  #9598  
Old Posted May 5, 2012, 10:33 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by st7860 View Post
However regardless of whichever type of trains they chose for Toronto I don't think they'll be able to have a train pulling into the station as few as 20 seconds after the previous train left like what often happens with the skytrain in Vancouver.


Does that ever happen on the Canada Line, too? In any case our trip is no longer than theirs, is, as you say, more frequent anyway, and uses nice clean electricity. No diesel fumes. Hah!
     
     
  #9599  
Old Posted May 5, 2012, 10:37 PM
st7860 st7860 is offline
BANNED
 
Join Date: Nov 2010
Posts: 1,299
Quote:
Originally Posted by trofirhen View Post


Does that ever happen on the Canada Line, too? In any case our trip is no longer than theirs, is, as you say, more frequent anyway, and uses nice clean electricity. No diesel fumes. Hah!
the canada line doesn't have enough trainsets to make that happen. with the expo line it can happen in as little as 12 seconds
http://www.youtube.com/watch?v=Cq3f7_niQas&feature=related
     
     
  #9600  
Old Posted May 5, 2012, 11:40 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
Quote:
Originally Posted by st7860 View Post
However regardless of whichever type of trains they chose for Toronto I don't think they'll be able to have a train pulling into the station as few as 20 seconds after the previous train left like what often happens with the skytrain in Vancouver.
You should probably compare it with other similar services around the world. 15-minute service for a 25-minute express service is quite good and in line with airport express trains in Tokyo, London, Paris and Osaka. In addition, with electrification and further improvements, that time will be able to come down quite a bit. Pearson int'l is only ~27km away, but extending the metro to it is not as attractive as in Vancouver.
  • Pearson is double the distance from downtown. (27km vs. 13.5km)
  • Toronto metro service is about 50% slower than SkyTrain (~30km/h vs. ~45km/h due to station spacing and slower accelerating trains.
  • The subway crosses town, but doesn't go right downtown

Vancouver's airport is close enough to be on the metro line. Heathrow is connected to the underground but can take up to an hour to get to where you're going in London. Heathrow also has an express rail link now.

We're fortunate to have a major airport close enough to downtown but far enough that it doesn't affect the quality of life of too many residents.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:32 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.