They seem to be downgrading and dumming down the LRT stations to stay within the budget.
This is not the way to go.
The stations should be as good as can be.
If the budget is not enough, then they should cancel/postpone the outlying stations (Blair, Cyrville, Tunney's Pasture), not cheapen everything.
http://i42.tinypic.com/21o92ww.png