HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario


Reply

 
Thread Tools Display Modes
     
     
  #1161  
Old Posted Mar 8, 2012, 6:43 PM
Riversideguy Riversideguy is offline
Registered User
 
Join Date: Dec 2011
Posts: 34
Reply With Quote
     
     
  #1162  
Old Posted Mar 8, 2012, 10:14 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874






You almost got the pics to work. You can't include the url tag, just paste the http:// link in the box after you click the post picture icon.

for example you posted

[IMG][ url] http://i1261.photobucket.com/albums/ii581/Riversideguy1/Picture018.jpg[/ url] [/IMG] ( I put spaces in the url tag to make them show)

Anyways, make sure those url tags are not included and that it's just the http link between the image tags and you'll be ok.
Reply With Quote
     
     
  #1163  
Old Posted Mar 8, 2012, 10:15 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Reply With Quote
     
     
  #1164  
Old Posted Mar 10, 2012, 7:30 PM
Lousclues Lousclues is offline
Registered User
 
Join Date: Dec 2011
Location: Windsor
Posts: 7
wow they're already starting on the aquatic center huh. that's good because Windsor used to take forever to start anything lol
Reply With Quote
     
     
  #1165  
Old Posted Mar 11, 2012, 12:05 AM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Took a few photos today while out for a walk downtown. The sun was setting so the photos aren't the best.

The gutting of the Palace. They haven't actually gotten to taking the exterior of the building off yet. I'm excited to see what the new Windsor Star headquarters will look like with glass instead of that tired pink stucco.




Some pictures of the site of the aquatic centre. Chatham and Pitt streets are closed off and the entire site is now fenced in.





Reply With Quote
     
     
  #1166  
Old Posted Mar 13, 2012, 4:02 AM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Reply With Quote
     
     
  #1167  
Old Posted Mar 13, 2012, 4:30 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Wow great job Windsor! For what is perceived as such a "have not" city by Canadian standards, you are doing very well for yourselves. I'm really impressed with the level of activity
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1168  
Old Posted Mar 13, 2012, 4:34 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Sooooooo

So I'm guessing the guy that started this thread has never updated the first page?


Would be cool if he did!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1169  
Old Posted Mar 13, 2012, 4:05 PM
north 42's Avatar
north 42 north 42 is offline
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,934
Quote:
Originally Posted by Chadillaccc View Post
Wow great job Windsor! For what is perceived as such a "have not" city by Canadian standards, you are doing very well for yourselves. I'm really impressed with the level of activity
Thanks, much of what is happening in the city has to do with our amazing mayor that We've had for the last 8 years. He's completely changed the way the city does business, and has achieved the almost impossible, increasing services and money spent on intrastructure, paying down the debt significantly, increasing reserves, instituting a pay as you go system, with no more borrowing for major and all city projects and developements, like the Aquatic Centre, and freezing taxes for the last 4 years, all while the city's tax base was being decimated by the recent recession and unemployment peaked at 15%. Pretty amazing accomplishment if you ask me. Most cities can't even accomplish this when things are going well.
Reply With Quote
     
     
  #1170  
Old Posted Mar 13, 2012, 5:41 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Windsor tech firm relocates to DriveMax building

source: http://www.ourwindsor.ca/2012/03/windsor-tech-firm-relocates-to-drivemax-building/



Quote:
Next Dimension's new headquarters is pictured in this photo displaying what the company's exterior office will look like at the new Devon Drive location. Photo courtesy Adam Davis.

Next Dimension Inc., Southwestern Ontario’s largest IT service provider, is set to call the old DriveMax building on Devon Drive home.

Next Dimension has been located at 3290 Jefferson Blvd. for the past 10 years. The company currently holds 8,000 square feet of office space compared to the new facility holding 10,000 square feet.

President and CEO, Adam Davis, sees the new building as a unique space that provides a new atmosphere where the staff can be on one floor rather than scattered amongst two floors at the current location.

Next Dimension specializes in backup and disaster recovery, collaboration and productivity, connectivity, security and many other tech-based services.

“Originally we wanted to build a building, but then we came across the DriveMax facility we felt the property was unique and we were looking for something unique,” said Davis. “It’s all glass and you get direct sunlight all the time.”

The old showroom is set to be a workspace for employees. Davis enjoys the open concept idea saying that it will allow employees to better collaborate and communicate.

“The building’s got a couple of things that are really cool for us. There’s 5,000 square feet of covered patio which makes it really unique when hosting events with our customers,” said Davis. “The bay doors for the cars also offers the chance to get some fresh air in the building during the spring and summer which offers a change from constantly using air conditioning.”

With the larger facility, Davis sees the space at the DriveMax building being better utilized leaving more flexibility for not only workers and hardware but for customers as well.

“The new space gives us the ability to bring customers in to the environment more often. Here we have a small room that can accommodate 15 or 20 people at a time for different events,” said Davis. “The new facility gives us a training facility that we can bring 40 or 50 people in to the environment. The additional space for a new high-end server room allows us to give better demos in a real-world environment rather than on a projector.”

The building is to be painted corporate blue and branded with logos and a signage structure is to be built. The possible addition of a 30-foot digital sign remains to be considered.

Next Dimension’s move-in date is set for March 31.

Last edited by Symz; Mar 13, 2012 at 9:59 PM.
Reply With Quote
     
     
  #1171  
Old Posted Mar 13, 2012, 8:13 PM
north 42's Avatar
north 42 north 42 is offline
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,934
Too bad they couldn't find a location in the core closer to some of the other tech companies, our downtown could use more of these types of workers.
Reply With Quote
     
     
  #1172  
Old Posted Mar 13, 2012, 9:01 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
via train station by me



Reply With Quote
     
     
  #1173  
Old Posted Mar 13, 2012, 9:03 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
aquatic centre by me









Reply With Quote
     
     
  #1174  
Old Posted Mar 13, 2012, 9:06 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
This is a 3 photo stitch I put together of the waterfront park in Lakeshore at the foot of Manning & Riverside.

Reply With Quote
     
     
  #1175  
Old Posted Mar 13, 2012, 11:00 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Riverside & Lauzon medical plaza



Reply With Quote
     
     
  #1176  
Old Posted Mar 15, 2012, 6:14 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I just realized something... No one has commented in any thread in the Waterloo section since February fourth (I was the one who commented Feb. 4... and also just posted a nearly identical comment tonight) but yet Waterloo has a thread... and even though Windsor's construction page gets multiple posts per day on a consistent basis... they don't have their own thread?

What the hell?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1177  
Old Posted Mar 15, 2012, 1:52 PM
north 42's Avatar
north 42 north 42 is offline
Registered User
 
Join Date: Apr 2011
Location: Windsor, Ontario/Colchester, Ontario
Posts: 5,934
It would be great for Windsor to have it's own thread. I'm not really sure how one goes about getting one, but hopefully we'll have one soon, there seems to be enough interest to support one.
Reply With Quote
     
     
  #1178  
Old Posted Mar 15, 2012, 4:31 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
There are also 2 large road construction projects starting at this time. One is the widening of Walker road between the expressway to Cabana. The road will be widened with a much needed left turning lane in the middle of the roadway and sidewalks finally. Relocation of utility poles along Walker has been going on for a few weeks now.

The second big road project to start is the widening and upgrading of the intersection at Provincial and Cabana roads. The current set up is much like a county road intersection and will be brought up to city standards.

No photos for either project at this time.
Reply With Quote
     
     
  #1179  
Old Posted Mar 15, 2012, 4:33 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Quote:
Originally Posted by Chadillaccc View Post
I just realized something... No one has commented in any thread in the Waterloo section since February fourth (I was the one who commented Feb. 4... and also just posted a nearly identical comment tonight) but yet Waterloo has a thread... and even though Windsor's construction page gets multiple posts per day on a consistent basis... they don't have their own thread?

What the hell?

We talked about this issue about 2 months ago. With construciton revving up in Windsor there will definately be more posts and pictures. It would be great if we could get our own subsection. I would also be great if we could get more people posting, or more Windsorites. I know there are a few lurkers and they show up from time to time.
Reply With Quote
     
     
  #1180  
Old Posted Mar 15, 2012, 9:20 PM
Symz's Avatar
Symz Symz is offline
Registered User
 
Join Date: Oct 2010
Location: Windsor, On.
Posts: 1,874
Took a few pictures of the aquatic centre construction site from the top of the 10 storey parking deck next to the bus station.



You can see the 2 roads that have been cut off permanently for this project.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 4:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.