If anyone is interested, this Thursday there is a public workshop about the open space along side the Sugarhouse Streetcar. Info can be found here: http://shstreetcar.com/files/01262012_PublicOpenHouse1_3.pdf
Reply With Quote
     
     
  #3922  
Old Posted Jan 26, 2012, 12:11 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Just a thought on the airport situation. Wouldn't it be quicker, less disruptive, and more cost efective to just construct the new airport in a different location (still within range of the current runway system)
Reply With Quote
     
     
  #3923  
Old Posted Jan 26, 2012, 12:13 AM
bob rulz bob rulz is offline
Registered User
 
Join Date: May 2010
Location: SL,UT
Posts: 1,616
Quote:
Originally Posted by ajiuO View Post
Just a thought on the airport situation. Wouldn't it be quicker, less disruptive, and more cost efective to just construct the new airport in a different location (still within range of the current runway system)
Where would be build a new airport? The Tooele Valley?

The current airport is in a fantastic, easily-accessible location, and there's not exactly a lot of empty space left in the valley to build an entirely new airport...
Reply With Quote
     
     
  #3924  
Old Posted Jan 26, 2012, 12:13 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
I was wondering is anyone could explain this....

They have been putting up the green poles for the Trax power lines in the middle of north temple... but then when you get to about 1900 west there are 3 or 4 Bright yellow ones then they go back to green again.

Does anyone have any clue as to what the significance of the yellow poles are? they look really out of place.
Reply With Quote
     
     
  #3925  
Old Posted Jan 26, 2012, 12:16 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by bob rulz View Post
Where would be build a new airport? The Tooele Valley?

The current airport is in a fantastic, easily-accessible location, and there's not exactly a lot of empty space left in the valley to build an entirely new airport...
No! i did say still within range of the current setup... I just meant not where the current building is... Hell they could even move the private plane storage and put it just off 2200 west... I'm sure there are a lot of options.
Reply With Quote
     
     
  #3926  
Old Posted Jan 26, 2012, 12:24 AM
bob rulz bob rulz is offline
Registered User
 
Join Date: May 2010
Location: SL,UT
Posts: 1,616
Quote:
Originally Posted by ajiuO View Post
No! i did say still within range of the current setup... I just meant not where the current building is... Hell they could even move the private plane storage and put it just off 2200 west... I'm sure there are a lot of options.
Oh I see what you mean.

That sounds like it would involve shifting significant portions of the airport though...I'm sure that would be more expensive than what is currently proposed especially since it would involve moving parking, access roads, not to mention the TRAX station that's already under construction, etc...
Reply With Quote
     
     
  #3927  
Old Posted Jan 26, 2012, 2:35 AM
CountyLemonade's Avatar
CountyLemonade CountyLemonade is offline
Registered User
 
Join Date: Jul 2011
Location: Salt Lake City
Posts: 394
^Though it's worth mentioning that the Trax station under construction right now will be replaced once the new terminal opens in 2018.
Reply With Quote
     
     
  #3928  
Old Posted Jan 26, 2012, 2:56 AM
arkhitektor arkhitektor is offline
Registered User
 
Join Date: Feb 2005
Location: Clearfield, UT
Posts: 1,784
Quote:
Originally Posted by ajiuO View Post
No! i did say still within range of the current setup... I just meant not where the current building is... Hell they could even move the private plane storage and put it just off 2200 west... I'm sure there are a lot of options.
This is what Indianapolis did recently. You can see the existing terminal and concourses at the bottom of the picture, they built their new terminal between the runways with a new access from the other side of the airfield. No need for a phased demolition, they just moved everything over to the new terminal once construction was finished:


New Indianapolis International Airport - IND by kla4067, on Flickr

Salt Lake has obviously taken a different approach, but I can see how something similar could have worked here, building a new terminal between the runways on the north side near the ATC Tower with access from I-215 instead of I-80:


Last edited by arkhitektor; Jan 26, 2012 at 3:17 AM.
Reply With Quote
     
     
  #3929  
Old Posted Jan 26, 2012, 4:18 AM
StevenF's Avatar
StevenF StevenF is offline
The Drifter
 
Join Date: Oct 2006
Location: Omaha, NE
Posts: 1,172
Quote:
Originally Posted by arkhitektor View Post
This is what Indianapolis did recently. You can see the existing terminal and concourses at the bottom of the picture, they built their new terminal between the runways with a new access from the other side of the airfield. No need for a phased demolition, they just moved everything over to the new terminal once construction was finished:


New Indianapolis International Airport - IND by kla4067, on Flickr

Salt Lake has obviously taken a different approach, but I can see how something similar could have worked here, building a new terminal between the runways on the north side near the ATC Tower with access from I-215 instead of I-80:

I actually thought of something similar a few months back when we were last talking about an airport expansion. But it wasn't to build on the other side, then demolishing the existing structures. I was more thinking about in 30-50 years out, after Salt Lake gets much bigger and having a double terminal. One on one end and another on the other side with access from I-215. Having a terminal on each end and 3-4 satellite concourses in the middle.
Reply With Quote
     
     
  #3930  
Old Posted Jan 26, 2012, 4:33 AM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
The main terminal used to be located off 2200 W (now the east side of the airport) prior to the 1960's.

Moving the terminal anywhere than it is planned for would be much too costly and would be disadvantageous in many ways. It is much better to have the terminals located in between runways rather than on just one side of the airport. It allows for better flow of air traffic, thus keeping aircraft fuel burn lower and costs lower and flights on time. Down the road, another runway will be built west of the airport where some of the International Center buildings are. The airport already owns some of these buildings and continues to buy up property and buildings as they become available to be able to construct this runway when it is needed.

And as others have mentioned, you would have to construct new access roads, parking lots, etc. if you moved the terminals somewhere else.

Moving the terminal to the north side of the airport only makes it more difficult for most of the public to access. Plus you would have to tear down multiple support facilities (maintenance, cargo, etc.) that are on the north side of the airport and just as important to keeping it running. The airport is in the stages of moving all cargo facilities to the north side of the airport.

I don't see any real advantage to constructing the terminal anywhere else.

Last edited by skyguy414; Jan 26, 2012 at 4:43 AM.
Reply With Quote
     
     
  #3931  
Old Posted Jan 26, 2012, 8:53 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
UTA employees out in force to promote 'Train for Safety' day

UTA employees out in force to promote 'Train for Safety' day
Deseret News



UTA's Kent Jorgenson talks with riders at the Courthouse stop in Salt Lake City Tuesday, Jan. 24, 2012. Utah Transit Authority continued efforts to promote safe behavior around trains with a special "train for safety" day where UTA employees shared safety information and educated riders about train safety at several rail stations.

www.deseretnews.com
Reply With Quote
     
     
  #3932  
Old Posted Feb 2, 2012, 4:19 PM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Use this link below to submit your comments to the airport regarding the new terminal development.

http://apps.slcgov.com/general/absolutefp/AirportComments.htm
Reply With Quote
     
     
  #3933  
Old Posted Feb 2, 2012, 4:32 PM
StevenF's Avatar
StevenF StevenF is offline
The Drifter
 
Join Date: Oct 2006
Location: Omaha, NE
Posts: 1,172
Quote:
Originally Posted by skyguy414 View Post
Use this link below to submit your comments to the airport regarding the new terminal development.

http://apps.slcgov.com/general/absolutefp/AirportComments.htm
That is a dangerous tool to post on this site. Now they are going to get multi page submissions of ideas from a few people.
Reply With Quote
     
     
  #3934  
Old Posted Feb 2, 2012, 5:28 PM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
I don't understand why it would be dangerous? The SLC International Airport is a publically owned facility and I personally think that a significant expansion or remodel on any publically owned facility should take into consideration the opinions and desires of the public.
Reply With Quote
     
     
  #3935  
Old Posted Feb 2, 2012, 5:52 PM
goldcntry's Avatar
goldcntry goldcntry is offline
West bench livin'
 
Join Date: Jan 2007
Location: Daybreak (So. Jordan), UT
Posts: 791
Quote:
Originally Posted by StevenF View Post
That is a dangerous tool to post on this site. Now they are going to get multi page submissions of ideas from a few people.
You say that like it's a bad thing! Bwa-ha-ha-ha-ha-ha!
__________________
Giant Meteor 2024
Just end it all already.
Reply With Quote
     
     
  #3936  
Old Posted Feb 7, 2012, 12:57 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
TRAX train hit by vehicle causes derailment near downtown SLC station

TRAX train hit by vehicle causes derailment near downtown SLC station
Aaron Vaughn, Web Producer
FOX 13 News

SALT LAKE CITY—
A pick-up truck with two people inside ran a red light near 900 South and 200 West
and were hit by a northbound TRAX train Monday afternoon around 5 p.m, according
to the Utah Transit Authority.

A UTA spokesman says the driver is in stable condition and the female passenger
was not hurt. However, the crash caused the train to derail.

UTA's Jerry Carpenter says commuters will have delays for a while UTA crews help
bring the train back on track. UTA said on Twitter it is busing those who had to
evacuate the train.


Photo credit: @sbakke1215 – twitter
Reply With Quote
     
     
  #3937  
Old Posted Feb 7, 2012, 3:19 AM
bob rulz bob rulz is offline
Registered User
 
Join Date: May 2010
Location: SL,UT
Posts: 1,616
Is it normal in other cities to have this many idiots running into trains??
Reply With Quote
     
     
  #3938  
Old Posted Feb 7, 2012, 3:45 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by bob rulz View Post
Is it normal in other cities to have this many idiots running into trains??
No. We now have proof that Utah drivers are the worst.
Reply With Quote
     
     
  #3939  
Old Posted Feb 7, 2012, 6:39 AM
farmerboy's Avatar
farmerboy farmerboy is offline
farmerboy
 
Join Date: Oct 2009
Location: Salt Lake City
Posts: 307
I'm worried UTA is going to run out of trains soon.
Reply With Quote
     
     
  #3940  
Old Posted Feb 7, 2012, 7:26 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
So thats now three?.......this year.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 8:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.