Quote:
Originally Posted by bunt_q
Similar to the US 36 MIS (RTD 2001), it was determined in the early stages of the US 36 DEIS/BE planning process that any type of commuter rail transit within the US 36 ROW would be prohibitively expensive and complex to construct. The US 36 ROW alignment would result in greater ROW acquisition costs, more impacts, and increased design and construction challenges than a commuter rail application in the BNSF Railway Company ROW alignment.
Additionally, due to the higher costs, impacts, and design and construction challenges, use of the US 36 ROW for any or all of the commuter rail would provide only minor travel time savings over the BNSF Railway Company ROW alignment. Therefore, a commuter rail alignment in the US 36 ROW for all or a portion of the corridor was not carried forward in the US 36 DEIS/BE.
Edit: I'm picturing the Fastracks Memorial Velodrome, complete with retractable dome roof, for Boulder's bike bribe. If we want to toss in $60m so CU can build a baseball stadium, I'm all for that too. Surely baseball at CU would have a healthy economic impact for Boulder. 
|
As in $2 billion in cost? Because that's what the BNSF alignment is looking at now. Back then, the BNSF costs estimates were more like $680 million.
How can the BNSF corridor cost nearly $2 billion, when the ROW is already there, it will be sharing existing track and simply need double tracking added in places (or as BNSF now claims, the entire length needs double tracking, which is total BS, since all freight rail will operate at different times of the day, from all commuter passenger rail).
For $2 billion, RTD could nearly build a high speed rail, along side US 36 and/or BNSF ROW, from DUS to Boulder. I'm fine with no train, but all indications are that Boulder is not going to agree to this. The BNSF ROW is not realistic, imho. The first segment of the NW Rail will be built as part of Eagle P3. If it must be extended, why shouldn't RTD look at legally acquiring their own ROW, either along side BNSF rail and/or US36 ROW or a combination of the two? RTD already proved they could acquire their own ROW for the East corridor, at a lower cost, than Union Pacific was planning to charge them. So there is a precedence.
As far as the grade issues, it sounds like the 5% grades are only when coming into the Table Mesa Station. This could be handled by either stomping the line short of this steep grade (ending in Broomfield, for example), or by using EMU's which power all axles, instead of only half of them. Such EMU's are currently in use already, in Germany. Siemens would surely be able to accommodate that order and possibly Hyundai-Rotem as well.
Another possibility, would be to put the NW Rail on hold. Then as part of a CDOT project, extend it to Boulder as a HSR line. That would create another market, to the BRT. However, for that to work, there would have to also be Denver to Colorado Springs HSR and possibly Denver to Vail HSR.
So another option may be to cancel NW Rail "as is" and then try to re-invent it one day, as part of a Front Range HSR system.
However, I do like the idea of simply expanding and inproving BRT as a Boulder hubbed system, giving Boulder a starter Streetcar line and constructing more bike infrastructure in Boulder. Even under this plan, I think RTD/CDOT should look to extending the North Corridor Commuter Rail to Longmont and eventually plan to extend it to Fort Collins.